Liahona Concrete
- Based in
- Sacramento
- On San Francisco permits
- Jul 2023 to Jul 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 20 Dorland St | upgrade floor from nylon to tile in kitchen and bathroom. replace kitchen countertop and base cabinet. replace old metal water pipe to copper.Details
upgrade floor from nylon to tile in kitchen and bathroom. replace kitchen countertop and base cabinet. replace old metal water pipe to copper. | $12,000 |