Levi Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Nov 2009
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2009 | Completed final sign-off Jan 2010 | 530 39th Av | remodel kitchen and bathroom- replace bathtub,sink, toilet, countertop, cabinets, sheetrock,and new lighting.Details
remodel kitchen and bathroom- replace bathtub,sink, toilet, countertop, cabinets, sheetrock,and new lighting. | $8,800 |
| Jun 3, 2009 | Completed final sign-off Oct 2009 | 254 Beverly St | revision to pa# 2008-0204-3869-relocate 1 full bathroom on ground floor per planDetails
revision to pa# 2008-0204-3869-relocate 1 full bathroom on ground floor per plan | |
| Apr 22, 2009 | Never finaled issued Apr 2009, no final | 442 Clement St | (see plan for details) i'm going to put a handicap restroom in-front of the office. repaint the walls. put 4-mirrors on wall and 4-seats for hair styling section. put 2-shampoo chairs in-front of the restroom. new storefront. change of occupancy from m retail to b nail salonDetails
(see plan for details) i'm going to put a handicap restroom in-front of the office. repaint the walls. put 4-mirrors on wall and 4-seats for hair styling section. put 2-shampoo chairs in-front of the restroom. new storefront. change of occupancy from m retail to b nail salon | $15,000 |
| Mar 2, 2009 | Completed final sign-off Apr 2009 | 360 Bridgeview Dr | comply w/n.o.v. #200988640 to remove existing non-permitted storage rooms, bedroom, bathroom & entry room on the ground floor. add two (n) bedrooms, one bathroom at ground floor (625 s.f.)Details
comply w/n.o.v. #200988640 to remove existing non-permitted storage rooms, bedroom, bathroom & entry room on the ground floor. add two (n) bedrooms, one bathroom at ground floor (625 s.f.) | $26,000 |
| Feb 21, 2008 | Completed final sign-off Jun 2008 | 82 Junior Tr | add two bedrooms, one full bathroom, one laundry room, storage on (e) ground floor per planDetails
add two bedrooms, one full bathroom, one laundry room, storage on (e) ground floor per plan | $88,000 |