Lee Construction
- Based in
- Hayward
- On San Francisco permits
- Apr 2010 to Sep 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2020 | Expired or cancelled expired Sep 2022 | 1612 York St | remodel (e) bathroom, like for like, add (4) can lightsDetails
remodel (e) bathroom, like for like, add (4) can lights | $7,000 |
| Sep 24, 2019 | Completed final sign-off Mar 2021 | 1818 08th Av | reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rearDetails
reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rear | $600,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 3075 26th St | remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.Details
remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room. | $30,000 |
| Dec 28, 2018 | Completed final sign-off Jun 2020 | 220 Glenview Dr | remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way.Details
remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way. | $50,000 |
| Oct 3, 2018 | Completed final sign-off Aug 2019 | 26 Crescent Av | legalization of single family with illegal 2nd unit @ lower level basement under ordinance# 43-14. (1 bedroom & 1 bath)Details
legalization of single family with illegal 2nd unit @ lower level basement under ordinance# 43-14. (1 bedroom & 1 bath) | $25,000 |
| Sep 14, 2018 | Completed final sign-off Feb 2020 | 220 Glenview Dr | see scope of work on sheet cs of drawing set. add 2 bedroom, 2 baths and living space ground level and lower level. replace front windows wood or fiberglass and add new windows rear of houseDetails
see scope of work on sheet cs of drawing set. add 2 bedroom, 2 baths and living space ground level and lower level. replace front windows wood or fiberglass and add new windows rear of house | $230,000 |
| Jul 11, 2018 | Completed final sign-off Jul 2019 | 26 Crescent Av | remodel interior, ele. plm and add 3 bathrooms. & interior laundry. convert 833 sf of garage to living space. 187 sf garage level to livingDetails
remodel interior, ele. plm and add 3 bathrooms. & interior laundry. convert 833 sf of garage to living space. 187 sf garage level to living | $125,000 |
| Jun 13, 2018 | Completed final sign-off Jul 2019 | 26 Crescent Av | remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framingDetails
remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framing | $60,000 |
| Mar 26, 2018 | Expired or cancelled withdrawn Aug 2018 | 601 41st Av | installation of new accessory kitchen at the 1st fl of an (e) single family residence. the accessory ktchen is required for religious ceremonies.Details
installation of new accessory kitchen at the 1st fl of an (e) single family residence. the accessory ktchen is required for religious ceremonies. | $15,700 |
| Jan 10, 2018 | Completed final sign-off Aug 2022 | 251 San Carlos St | remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher naDetails
remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher na | $345,000 |
| Jul 13, 2016 | Completed final sign-off Feb 2017 | 26 Eastwood Dr | complete interior remodel includes reconfiguring walls for new 2nd bath & enlarge kit., convert (e) g/f to living space for 2 bedrms, 2 baths, fam. rm & office,replace footing office area. rewire, repipe, new heater & water heater, new windows like for like, replace garage door & front windows wood,Details
complete interior remodel includes reconfiguring walls for new 2nd bath & enlarge kit., convert (e) g/f to living space for 2 bedrms, 2 baths, fam. rm & office,replace footing office area. rewire, repipe, new heater & water heater, new windows like for like, replace garage door & front windows wood, | $80,000 |
| Jun 21, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | to comply with nov#201621944: replace rotted railing system deck & replace dry rot deck less than 50%. preconstructoin meeting with bid inspector is required.Details
to comply with nov#201621944: replace rotted railing system deck & replace dry rot deck less than 50%. preconstructoin meeting with bid inspector is required. | $1,500 |
| Jun 21, 2016 | Completed final sign-off Feb 2017 | 26 Eastwood Dr | remodel kitchen & bathroom, dry rot repair around windows, front porch (50% or less). replace 10 rear & side windows. redo stucoo around windows & overlay to match rest of house. redo plumbing & electrical as needed. no alt to walls, replace interior door & windows in-kind. max u-factor 0.32.Details
remodel kitchen & bathroom, dry rot repair around windows, front porch (50% or less). replace 10 rear & side windows. redo stucoo around windows & overlay to match rest of house. redo plumbing & electrical as needed. no alt to walls, replace interior door & windows in-kind. max u-factor 0.32. | $80,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space areaDetails
leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space area | $47,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | remodel kitchen & 2 bathrooms.replace 5 (e)windows in-kind at rear & replace siding as needed not to exceed 400 sf. not visible from street. no (n)wall & (e)wall relocation. u-factor for all windows not to exceed 0.32. lighting comply w/cec 150.0(k)3 & 5.Details
remodel kitchen & 2 bathrooms.replace 5 (e)windows in-kind at rear & replace siding as needed not to exceed 400 sf. not visible from street. no (n)wall & (e)wall relocation. u-factor for all windows not to exceed 0.32. lighting comply w/cec 150.0(k)3 & 5. | $29,000 |
| Mar 21, 2011 | Completed final sign-off May 2011 | 402 08th Av | remodel master bath tub to shower, new toilet, new sink, new wall light. cans lights to kitchen. hall bath: new toilet, sink, tub doors. change door to hall closet. new cabinet light kitchen.Details
remodel master bath tub to shower, new toilet, new sink, new wall light. cans lights to kitchen. hall bath: new toilet, sink, tub doors. change door to hall closet. new cabinet light kitchen. | $19,000 |
| Apr 1, 2010 | Never finaled issued Apr 2010, no final | 839 30th Av | reroofing (new roof covering to bldg. tar/gravel)Details
reroofing (new roof covering to bldg. tar/gravel) | $8,700 |