Lazo & Devost Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to May 2026
- Last 24 months
- 9 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued Aug 2026 | 83 Seward St | renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two.Details
renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two. | $350,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 885 Hayes St | repair dry rot at back stairs, replace stringers and threads about 40% of repair - repair deck boards - repair a broken fence, not facing the streetDetails
repair dry rot at back stairs, replace stringers and threads about 40% of repair - repair deck boards - repair a broken fence, not facing the street | $15,000 |
| Mar 13, 2026 | Completed final sign-off Mar 2026 | 611 San Bruno Av | repair dry rot: repair dry rot at back patio deck in-kind. repair a dry rotted stair stringer in-kind. deck is under 30" high - repair is about 40% - mostly dry rot.Details
repair dry rot: repair dry rot at back patio deck in-kind. repair a dry rotted stair stringer in-kind. deck is under 30" high - repair is about 40% - mostly dry rot. | $10,000 |
| Dec 30, 2025 | Completed final sign-off May 2026 | 1201 California St | remodel a guest bathroom: remove tub and build a shower, new tile, new sink, new shower appliances, new sheetrock and paint. add new fan.Details
remodel a guest bathroom: remove tub and build a shower, new tile, new sink, new shower appliances, new sheetrock and paint. add new fan. | $45,000 |
| Nov 6, 2025 | Completed final sign-off May 2026 | 619 San Bruno Av | revision to 202505216928: add a skylight at kitchen over island, partial structural strengthening of skylight opening. not visible from streetDetails
revision to 202505216928: add a skylight at kitchen over island, partial structural strengthening of skylight opening. not visible from street | $6,500 |
| Aug 4, 2025 | Completed final sign-off Oct 2025 | 31 Rico Wy | remove stucco at back of house. repair water leak at (7) windows and (1) sliding door. restucco after repair and waterproof windows.Details
remove stucco at back of house. repair water leak at (7) windows and (1) sliding door. restucco after repair and waterproof windows. | $30,000 |
| May 21, 2025 | Completed final sign-off May 2026 | 619 San Bruno Av | remove wall between kitchen & dining. kitchen remodel partial structural strengthening of rear portion of structureDetails
remove wall between kitchen & dining. kitchen remodel partial structural strengthening of rear portion of structure | $160,000 |
| Mar 12, 2025 | Completed final sign-off Aug 2025 | 45 Grand View Av | revise permit 202502240942 to indicate presence of structural posts update and new beam at 3rd floor framing beam not previously shown on drawings.Details
revise permit 202502240942 to indicate presence of structural posts update and new beam at 3rd floor framing beam not previously shown on drawings. | $40,000 |
| Feb 24, 2025 | In progress issued Feb 2025 | 45 Grand View Av | full kitchen remodel, structural upgrade. electrical upgrade at kitchen and dining. plumbing upgrade at kitchen only. structrual upgrade at garage and kitchen. replace closet swinging door for pocket. remodel primary bedroom area.Details
full kitchen remodel, structural upgrade. electrical upgrade at kitchen and dining. plumbing upgrade at kitchen only. structrual upgrade at garage and kitchen. replace closet swinging door for pocket. remodel primary bedroom area. | $200,000 |
| Aug 5, 2024 | Completed final sign-off Mar 2025 | 86 Malta Dr | 86 malta dr: bathroom remodel in-kindDetails
86 malta dr: bathroom remodel in-kind | $30,000 |
| Aug 2, 2024 | Completed final sign-off Mar 2025 | 1201 California St | unit #1602: cosmetic remodel of (2) bathrooms. minor electrical, upgrade new shower valves. paint entire apartment. new vanities. in kind construction - no changes in layout. no moving walls.Details
unit #1602: cosmetic remodel of (2) bathrooms. minor electrical, upgrade new shower valves. paint entire apartment. new vanities. in kind construction - no changes in layout. no moving walls. | $120,000 |
| Mar 13, 2024 | Completed final sign-off May 2024 | 701 Wawona St | repair north e corner of building damaged by falling tree. repair rafter, ceiling joist, wall, insulation, sheetrock, floor damaged by water intrusion. not visible from street. complaint 202418895, 202418894 inspector mauricio hernandezDetails
repair north e corner of building damaged by falling tree. repair rafter, ceiling joist, wall, insulation, sheetrock, floor damaged by water intrusion. not visible from street. complaint 202418895, 202418894 inspector mauricio hernandez | $65,000 |