Lawton Construction And Restoration Inc
- Based in
- Lincoln
- On San Francisco permits
- Apr 2022 to Nov 2025
- Last 24 months
- 2 permits filed
3 permits since 2000: 1 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2025 | In progress issued Nov 2025 | 1255 California St | demo existing cabinets/countertops. no alterations to existing cabinet layout. upgrade appliances, remove existing tube lighting and repalce with energy efficient can lights. quartz countertops.Details
demo existing cabinets/countertops. no alterations to existing cabinet layout. upgrade appliances, remove existing tube lighting and repalce with energy efficient can lights. quartz countertops. | $28,891 |
| Sep 18, 2025 | In progress issued Oct 2025 | 1 Warren Dr | install insullation, drywall, paint, cabinets, countertop, and flooring and minor electrical wiring. repatch any opening with 5/8" type x sheetrock.Details
install insullation, drywall, paint, cabinets, countertop, and flooring and minor electrical wiring. repatch any opening with 5/8" type x sheetrock. | $20,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 2591 California St | replace insulation r-19, wall r-38 attic, repair plaster w/drywall, reinstall lights/other outlets, replace flooring in (2) rooms. no change to room layouts. work on the upper two floors only.Details
replace insulation r-19, wall r-38 attic, repair plaster w/drywall, reinstall lights/other outlets, replace flooring in (2) rooms. no change to room layouts. work on the upper two floors only. | $39,702 |