Law Construction
- Based in
- San Rafael
- On San Francisco permits
- Jul 2001 to Oct 2010
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 12, 2010 | Completed final sign-off Jul 2011 | 1354 46th Av | comply with physical inspection report #cc-5480.Details
comply with physical inspection report #cc-5480. | $4,000 |
| Apr 8, 2008 | Completed final sign-off Apr 2008 | 1644 Great Hy | replace 2 windows (in kind) front of house .same size.Details
replace 2 windows (in kind) front of house .same size. | $3,500 |
| Feb 26, 2008 | Completed final sign-off Apr 2008 | 116 Downey St | remodel 1 bathroom to include: new tile, new shower valve, new pocket door frame and shower can light. replace 2 sky lights in kindDetails
remodel 1 bathroom to include: new tile, new shower valve, new pocket door frame and shower can light. replace 2 sky lights in kind | $10,000 |
| Jul 23, 2007 | Completed final sign-off Dec 2007 | 3207 Market St | remove 2 partitions walls move electtrical ou5l3w5, inw5qll 2 fire doors, 2 windows (wood) sheetrock ceiling /walls insulsate fixed cuble pane.Details
remove 2 partitions walls move electtrical ou5l3w5, inw5qll 2 fire doors, 2 windows (wood) sheetrock ceiling /walls insulsate fixed cuble pane. | $15,000 |
| Jun 29, 2006 | Completed final sign-off Mar 2007 | 1371 Dolores St | reconfigure g/f unit to add bathroom & living room, move kitchen, add master bathroom & replace kitchen cabinets at upper unit. no expansion of bldg envelope.Details
reconfigure g/f unit to add bathroom & living room, move kitchen, add master bathroom & replace kitchen cabinets at upper unit. no expansion of bldg envelope. | $49,000 |
| Mar 1, 2006 | Completed final sign-off Mar 2006 | 163 Moneta Wy | remove 15 windows. no structural (some in front).replace w/15 vinyl clad windows.Details
remove 15 windows. no structural (some in front).replace w/15 vinyl clad windows. | $6,000 |
| Feb 23, 2006 | Completed final sign-off May 2006 | 432 Oxford St | remodel bathrm & kitchen in kind on the second floorDetails
remodel bathrm & kitchen in kind on the second floor | $12,000 |
| Oct 12, 2005 | Completed final sign-off Mar 2006 | 163 Moneta Wy | remodel existing kitchen w new cabinets, appliances, cntrtop sink, tile floor. no structural. remodel exist bath w new tile, sink, toiletDetails
remodel existing kitchen w new cabinets, appliances, cntrtop sink, tile floor. no structural. remodel exist bath w new tile, sink, toilet | $14,000 |
| Sep 16, 2005 | Completed final sign-off Jul 2006 | 65 Noe St | per report of conditions with 3r-3420 dated 8/20/2001.Details
per report of conditions with 3r-3420 dated 8/20/2001. | $5,000 |
| Aug 8, 2005 | Expired or cancelled cancelled May 2006 | 65 Noe St | to correspond with 3r reportDetails
to correspond with 3r report | $5,000 |
| Jan 19, 2005 | Completed final sign-off Feb 2005 | 1274 Noe St | as built plans for app#200401224613.Details
as built plans for app#200401224613. | |
| Nov 24, 2004 | Completed final sign-off Feb 2005 | 138 Bronte St | remodel existing kitchen w/new cabs, countertop, sink, appliances & new flr, remodel existing bathrmDetails
remodel existing kitchen w/new cabs, countertop, sink, appliances & new flr, remodel existing bathrm | $35,000 |
| Aug 20, 2004 | Completed final sign-off Feb 2005 | 1274 Noe St | decorative trim and porch overhang at front exterior/new decorative guardrail at ext porchDetails
decorative trim and porch overhang at front exterior/new decorative guardrail at ext porch | $5,000 |
| May 13, 2004 | Completed final sign-off Jan 2005 | 1274 Noe St | extension (e) upper deck,enlargement of lower patioDetails
extension (e) upper deck,enlargement of lower patio | $8,000 |
| Jan 22, 2004 | Completed final sign-off Feb 2005 | 1274 Noe St | remodel kitchen and master bedroom and bath, new shear walls and holdowns per plansDetails
remodel kitchen and master bedroom and bath, new shear walls and holdowns per plans | $100,000 |
| Jul 31, 2003 | Completed final sign-off Oct 2003 | 924 Clayton St | convert exsting closet on 2nd fl to install a new bathroomDetails
convert exsting closet on 2nd fl to install a new bathroom | $25,500 |
| Jul 11, 2001 | Completed final sign-off Feb 2002 | 1126 Ashbury St | construct a new deck in the rear yard. remove two windows & install new doors & windowDetails
construct a new deck in the rear yard. remove two windows & install new doors & window | $12,500 |