Lavu Concrete Construction
- Based in
- Millbrae
- On San Francisco permits
- Oct 2008 to Aug 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2022 | Completed final sign-off Sep 2022 | 3237 Wawona St | to legalize newly contructed driveway at front yard with concrete 12'x25'Details
to legalize newly contructed driveway at front yard with concrete 12'x25' | $2,700 |
| Aug 17, 2010 | Completed final sign-off Sep 2010 | 1315 Natoma St | remove & haul all existing concrete slab in garage 1600 sq.ft., compaction #4 rebar 14" o.c. each way, pour new concrete slab 5" thick, smooth finishingDetails
remove & haul all existing concrete slab in garage 1600 sq.ft., compaction #4 rebar 14" o.c. each way, pour new concrete slab 5" thick, smooth finishing | $15,000 |
| Oct 16, 2008 | Completed final sign-off Dec 2008 | 415 Mississippi St | remove existing retaining wall and rebuild per engineered drawingsDetails
remove existing retaining wall and rebuild per engineered drawings | $7,500 |