Feb 2010 to Jan 2018
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllKitchen remodel 1Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 18, 2018Never finaled
issued Jan 2018, no final
44 Venus Streplace existing wood sash in rear and aluminum window with aluminum dual pane insulated windows at front. replace windows in rear. number of windows 13
Details
Permit
201801188917
Status
issued
Filed
Jan 18, 2018
Permit issued
Jan 18, 2018
Declared cost
$8,000
Address
44 Venus St

replace existing wood sash in rear and aluminum window with aluminum dual pane insulated windows at front. replace windows in rear. number of windows 13

Open the permit page

$8,000
Jan 16, 2018Completed
final sign-off Aug 2018
44 Venus Stkitchen & bathroom remodel. kitchen ceiling and walls exposed to stud framing w/exterior walls insulated and 1 window eliminated (not visible from st) from kitchen with reapirs. sheetrock kitchen and (1) pocket door for bathroom and seal off 2nd door to bath from closet. shower stall to
Details
Permit
201801168686
Status
complete
Filed
Jan 16, 2018
Permit issued
Jan 18, 2018
Final sign-off
Aug 6, 2018
Declared cost
$65,000
Address
44 Venus St

kitchen & bathroom remodel. kitchen ceiling and walls exposed to stud framing w/exterior walls insulated and 1 window eliminated (not visible from st) from kitchen with reapirs. sheetrock kitchen and (1) pocket door for bathroom and seal off 2nd door to bath from closet. shower stall to

Open the permit page

$65,000
Nov 30, 2010Completed
final sign-off Jan 2011
233 Tingley Stbath remodel- tear out tile walls/floor, tub to remain, plumb in new fixture, relocate outlet plug & install gfic receptacle. install exhaust fan, new light fixture. hang sheetrock on walls & concete board around tub surround, new toilet,vanity cabinet with top & fixture, tile walls surround & floor
Details
Permit
201011305778
Status
complete
Filed
Nov 30, 2010
Permit issued
Nov 30, 2010
Final sign-off
Jan 27, 2011
Declared cost
$9,850
Address
233 Tingley St

bath remodel- tear out tile walls/floor, tub to remain, plumb in new fixture, relocate outlet plug & install gfic receptacle. install exhaust fan, new light fixture. hang sheetrock on walls & concete board around tub surround, new toilet,vanity cabinet with top & fixture, tile walls surround & floor

Open the permit page

$9,850
Feb 17, 2010Completed
final sign-off Mar 2010
172 Louisburg Stto comply with bid nov 201033587. replace centre cloum in garage. replace garage door in kind.replace 2 studs on one wall and repair stucco on exterior. area= 10 sq ft
Details
Permit
201002176651
Status
complete
Filed
Feb 17, 2010
Permit issued
Feb 17, 2010
Final sign-off
Mar 8, 2010
Declared cost
$4,600
Address
172 Louisburg St

to comply with bid nov 201033587. replace centre cloum in garage. replace garage door in kind.replace 2 studs on one wall and repair stucco on exterior. area= 10 sq ft

Open the permit page