Lavan Construction
- Based in
- San Jose
- On San Francisco permits
- May 2021 to Dec 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2022 | Completed final sign-off Aug 2023 | 2 Vulcan Sw | in-kind replacement of siding for window and door installation on two sides of the house in an existing addition in the backyard. about 400-450 sf siding. window and french door under separation permit #202106222901 & #202105039687. siding not visible from street.Details
in-kind replacement of siding for window and door installation on two sides of the house in an existing addition in the backyard. about 400-450 sf siding. window and french door under separation permit #202106222901 & #202105039687. siding not visible from street. | $500 |
| May 10, 2022 | Completed final sign-off Aug 2023 | 2 Vulcan Sw | revision to pa# 2021-0503-9687: reflect field conditions replace interior stairs in kind & framing changes per planDetails
revision to pa# 2021-0503-9687: reflect field conditions replace interior stairs in kind & framing changes per plan | |
| Nov 9, 2021 | Completed final sign-off Aug 2023 | 2 Vulcan Sw | rev to pa 202105039687 to replace foundation in one portion of the house.Details
rev to pa 202105039687 to replace foundation in one portion of the house. | $8,000 |
| Jun 22, 2021 | Completed final sign-off Dec 2022 | 2 Vulcan Sw | replacement of 24 windows throughout house with retrofit windows. some facing street. same size & location. windows on ord ct ord street and vulcan stairway will be wood aluminum clad windows.Details
replacement of 24 windows throughout house with retrofit windows. some facing street. same size & location. windows on ord ct ord street and vulcan stairway will be wood aluminum clad windows. | $23,000 |
| May 3, 2021 | Completed final sign-off Aug 2023 | 2 Vulcan Sw | reconfigure (e) kitchen & 2 baths. add 2 (n) baths. open walls at (e) living space. 4 (n) windows not visible from street.Details
reconfigure (e) kitchen & 2 baths. add 2 (n) baths. open walls at (e) living space. 4 (n) windows not visible from street. | $175,000 |