Lange, Andrew
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to Mar 2024
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2024 | In progress filed Mar 2024, not yet issued | 701 Post St | demoltion, sheetrock patch; paint; wood framing; install 3/4 conduit; device boxes (rough) (as needed) for t.v, telephone cat 6 and fire smoke detectors as needed.Details
demoltion, sheetrock patch; paint; wood framing; install 3/4 conduit; device boxes (rough) (as needed) for t.v, telephone cat 6 and fire smoke detectors as needed. | $20,000 |