Landmark Construction & Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Sep 2021
- Last 24 months
- 0 permits filed
46 permits since 2000: 43 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2021 | Completed final sign-off May 2022 | 427 27th Av | revision to pa #202010287624: re-arrange bathroom, replace partial rotten wood at 2nd floor. remove/replace (e) concrete slab w/ new, replace partial rotten wood at g/f. remove/replace (e) stucco w/ new at front (approx. 250 sq ft).Details
revision to pa #202010287624: re-arrange bathroom, replace partial rotten wood at 2nd floor. remove/replace (e) concrete slab w/ new, replace partial rotten wood at g/f. remove/replace (e) stucco w/ new at front (approx. 250 sq ft). | $48,000 |
| Nov 16, 2020 | Completed final sign-off May 2021 | 710 London St | convert (e) bedroom into 2 bedroom. construct 2 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2nd floor. construct new deck w/ staircase at rear of building (approx. 8'-4" x 7').Details
convert (e) bedroom into 2 bedroom. construct 2 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2nd floor. construct new deck w/ staircase at rear of building (approx. 8'-4" x 7'). | $120,000 |
| Oct 28, 2020 | Completed final sign-off May 2022 | 427 27th Av | construct 2 bedrooms, 2 full bath & family room at ground floor. remodel (e) kitchen, bathroom. add 1 new bathroom & replace (e) sheet rock w/ new at 2nd floor. infill under (e) sun room for new bedroom at ground floor.Details
construct 2 bedrooms, 2 full bath & family room at ground floor. remodel (e) kitchen, bathroom. add 1 new bathroom & replace (e) sheet rock w/ new at 2nd floor. infill under (e) sun room for new bedroom at ground floor. | $120,000 |
| Dec 9, 2019 | Completed final sign-off Sep 2020 | 581 Arch St | structural revision to bpa #201907186289.Details
structural revision to bpa #201907186289. | $2,000 |
| Jul 18, 2019 | Completed final sign-off Sep 2020 | 581 Arch St | 1st fl - infill at rear; 2nd floor - remodel kitchen and bath, add 2 bathsDetails
1st fl - infill at rear; 2nd floor - remodel kitchen and bath, add 2 baths | $45,000 |
| Jun 27, 2019 | Completed final sign-off Oct 2019 | 750 23rd Av | remove and replace approx. 800 sq ft of stucco at front façade - texture to remain the same. at rear, remove and replace approx. 1,000 sq ft of siding. no other work under this permit.Details
remove and replace approx. 800 sq ft of stucco at front façade - texture to remain the same. at rear, remove and replace approx. 1,000 sq ft of siding. no other work under this permit. | $20,000 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 610 Moraga St | divide one bed room to two bed room, all work at 3rd floorDetails
divide one bed room to two bed room, all work at 3rd floor | $15,000 |
| Mar 12, 2019 | Completed final sign-off Oct 2019 | 750 23rd Av | construct new deck w/staircase at rear yard (size approx 15'x12'); construct 1 bedrm, 1 full bath rm & media rm @ ground floor; remodel (e) kitchen, relocate half bath rm & re-built (e) interior stairvase down to ground fl & replace sheet rock w/new at 2nd fl; remodel 3 bedrooms, 1 bath rm, add 1Details
construct new deck w/staircase at rear yard (size approx 15'x12'); construct 1 bedrm, 1 full bath rm & media rm @ ground floor; remodel (e) kitchen, relocate half bath rm & re-built (e) interior stairvase down to ground fl & replace sheet rock w/new at 2nd fl; remodel 3 bedrooms, 1 bath rm, add 1 | $138,000 |
| Oct 19, 2018 | Completed final sign-off Apr 2019 | 1601 Irving St | interior tenant improvement for market ready. adding non-load bearing wall and new door. separate one retail into two retail spaces. change from mtl stud to wood stud and wood ceiling joist, new restroom, new layout re-arrangement, no change of (e) restroom, omit hallwlayDetails
interior tenant improvement for market ready. adding non-load bearing wall and new door. separate one retail into two retail spaces. change from mtl stud to wood stud and wood ceiling joist, new restroom, new layout re-arrangement, no change of (e) restroom, omit hallwlay | $25,000 |
| Aug 28, 2018 | Completed final sign-off Aug 2018 | 326 Flood Av | comply with complaint #2018011336 enf front yard paving. comply with 50% permiability and no % landscaping area. (permeable area to be small rock.)Details
comply with complaint #2018011336 enf front yard paving. comply with 50% permiability and no % landscaping area. (permeable area to be small rock.) | $8,000 |
| Apr 17, 2018 | Completed final sign-off Aug 2018 | 326 Flood Av | revision to p a 2018-0126-9606 add new tie beam in garage area & re built retaining wall in rear yardDetails
revision to p a 2018-0126-9606 add new tie beam in garage area & re built retaining wall in rear yard | $28,000 |
| Jan 26, 2018 | Completed final sign-off Sep 2018 | 326 Flood Av | construct two bedroom 2 full bath & media rm @ ground floor. remodel (e) kitchen, bath room. construct one new bath room. re-built interior stair, upgrade partial ceiling framing. construct two skylight @ 2nd fl. construct new deck with staircase at rear of bldg (size 16-16"x12'-0)Details
construct two bedroom 2 full bath & media rm @ ground floor. remodel (e) kitchen, bath room. construct one new bath room. re-built interior stair, upgrade partial ceiling framing. construct two skylight @ 2nd fl. construct new deck with staircase at rear of bldg (size 16-16"x12'-0) | $80,000 |
| Oct 5, 2017 | Completed final sign-off Apr 2018 | 1906 22nd Av | remodel kitchen and bathroom at upper level. reducing the scope of work to be performed application permit # 201707141908. please remove "replace four front windows" from the scope of the original application.Details
remodel kitchen and bathroom at upper level. reducing the scope of work to be performed application permit # 201707141908. please remove "replace four front windows" from the scope of the original application. | |
| Aug 23, 2017 | Completed final sign-off Sep 2017 | 414 15th Av | replace damaged siding facing back yard.Details
replace damaged siding facing back yard. | $4,500 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 622 Jackson St | to show public assembly (floor area) require by fire department.Details
to show public assembly (floor area) require by fire department. | $5,000 |
| Jul 14, 2017 | Completed final sign-off Apr 2018 | 1906 22nd Av | remodel kitchen and bathroom at upper level. replace four front windows with wood sash. u factor not > .32Details
remodel kitchen and bathroom at upper level. replace four front windows with wood sash. u factor not > .32 | $16,000 |
| Apr 24, 2017 | Completed final sign-off Nov 2017 | 1460 Monterey Bl | renew permit under pa# 201504163774Details
renew permit under pa# 201504163774 | $25,000 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 558 27th Av | revision to pa#201701137112 - construct one 4'x5'-6" skylight & re-arrange one bathroom plumbing fixture at 2nd floor. relocate laundry to garage & change one door to window at ground floor. replace (e) stucco w/new approx 150 sq ft at front. n/a maher ordinanceDetails
revision to pa#201701137112 - construct one 4'x5'-6" skylight & re-arrange one bathroom plumbing fixture at 2nd floor. relocate laundry to garage & change one door to window at ground floor. replace (e) stucco w/new approx 150 sq ft at front. n/a maher ordinance | $20,000 |
| Jan 13, 2017 | Completed final sign-off Jul 2017 | 558 27th Av | relocate (e) bathroom, remodel (e) kitchen, add one new bath room at 2/f, construct 2 bedrooms, one in-fill under (e) living room, family room, laundry area & one full bathroom at g/f, rebuilt interior staircase from 2/f down to g/f, construct new deck, size approx. 15'x8'. n/a ordinance #155-13Details
relocate (e) bathroom, remodel (e) kitchen, add one new bath room at 2/f, construct 2 bedrooms, one in-fill under (e) living room, family room, laundry area & one full bathroom at g/f, rebuilt interior staircase from 2/f down to g/f, construct new deck, size approx. 15'x8'. n/a ordinance #155-13 | $82,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2017 | 739 32nd Av | remodel (e) bath room @ 3rd floor. remodel (e) kitchen @ 2nd floor. construct two bedrooms, storage room & 1 full bath room @ ground floor & family roomDetails
remodel (e) bath room @ 3rd floor. remodel (e) kitchen @ 2nd floor. construct two bedrooms, storage room & 1 full bath room @ ground floor & family room | $62,000 |
| Jan 22, 2016 | Completed final sign-off Feb 2016 | 1915 22nd Av | revision under pa#201509217487, relocate kitchen washer & dryer at ground floor, enlarge bath room & add one closet at 2/f.Details
revision under pa#201509217487, relocate kitchen washer & dryer at ground floor, enlarge bath room & add one closet at 2/f. | $1,000 |
| Sep 23, 2015 | Completed final sign-off Nov 2015 | 172 Jordan Av | remodel master bathroom at 2/f.Details
remodel master bathroom at 2/f. | $7,500 |
| Sep 21, 2015 | Completed final sign-off Feb 2016 | 1915 22nd Av | convert 1 (e) bathroom into 2 (n) full bath room. convert (e) kitchen into ofice & dining room into bedroom. relocate (e) kitchen to ground floor & re-wire electrical, lighting at 2nd floor; construct 9n) kitchen, half bath room & remodel (e) family room at ground floorDetails
convert 1 (e) bathroom into 2 (n) full bath room. convert (e) kitchen into ofice & dining room into bedroom. relocate (e) kitchen to ground floor & re-wire electrical, lighting at 2nd floor; construct 9n) kitchen, half bath room & remodel (e) family room at ground floor | $60,000 |
| Jun 25, 2015 | Completed final sign-off Oct 2015 | 1539 33rd Av | remodel (e) bathroom at second flor with laundry hookup, run new 1" copper pipe from main water shut off valve to meter. upgrade (e) electrical panel to 100 amp.Details
remodel (e) bathroom at second flor with laundry hookup, run new 1" copper pipe from main water shut off valve to meter. upgrade (e) electrical panel to 100 amp. | $10,000 |
| May 22, 2015 | Expired or cancelled cancelled Jan 2026 | 2114 28th Av | install bamboo siding at front of bldg. (appox 100 sq ft)Details
install bamboo siding at front of bldg. (appox 100 sq ft) | $2,000 |
| May 19, 2015 | Completed final sign-off May 2015 | 2114 28th Av | comply w/complaint #201532674 - keep 20% of landscape in front building.Details
comply w/complaint #201532674 - keep 20% of landscape in front building. | $3,000 |
| May 1, 2015 | Completed final sign-off Jul 2015 | 326 21st Av | replace total of 15 windows for two units. 7 front windows to be wood or wood aluminum clad windows. single or double hung.Details
replace total of 15 windows for two units. 7 front windows to be wood or wood aluminum clad windows. single or double hung. | $4,000 |
| Apr 16, 2015 | Expired or cancelled expired Nov 2017 | 1460 Monterey Bl | comply w/complaint #201530001, 201532033, & 201539571 - convert (e) family into bedroom, home office & convert (e) laundry rm into bedroom. all work at ground floor.Details
comply w/complaint #201530001, 201532033, & 201539571 - convert (e) family into bedroom, home office & convert (e) laundry rm into bedroom. all work at ground floor. | $25,000 |
| Jan 20, 2015 | Completed final sign-off May 2015 | 2114 28th Av | construct one new bathroom at 2nd flr, legalize (e) bedroom, bathroom, construct one new bedroom and one full bathroom at ground floor.Details
construct one new bathroom at 2nd flr, legalize (e) bedroom, bathroom, construct one new bedroom and one full bathroom at ground floor. | $46,000 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 220 Morningside Dr | remodel 2 full bathrooms. (one on ground, one on 2nd fl)Details
remodel 2 full bathrooms. (one on ground, one on 2nd fl) | $14,000 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 220 Morningside Dr | remove a bearing wall (e) breakfast room & laundry rm, relocated (n) laundry rm at garage level, relocated water heater at garage area.Details
remove a bearing wall (e) breakfast room & laundry rm, relocated (n) laundry rm at garage level, relocated water heater at garage area. | $15,000 |
| Oct 17, 2014 | Completed final sign-off Oct 2015 | 172 Jordan Av | remodel bathroom at 2nd floorDetails
remodel bathroom at 2nd floor | $7,000 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 378 27th Av | remodel (e) kitchen & bathroom at 2nd floor. (no wall to be removed).Details
remodel (e) kitchen & bathroom at 2nd floor. (no wall to be removed). | $13,500 |
| Sep 13, 2013 | Completed final sign-off Dec 2013 | 1644 Clement St | remodel (e) kitchen & bathroom, no windows & no doors (except bathroom) on this permitDetails
remodel (e) kitchen & bathroom, no windows & no doors (except bathroom) on this permit | $20,000 |
| Sep 12, 2013 | Completed final sign-off Oct 2013 | 172 Jordan Av | remodel extg kitchen. replace countertop, install kitchen appliances, kitchen plumbing fixtures, lighting, outlet, new flooring.Details
remodel extg kitchen. replace countertop, install kitchen appliances, kitchen plumbing fixtures, lighting, outlet, new flooring. | $12,000 |
| Dec 13, 2012 | Completed final sign-off Jun 2013 | 148 28th Av | construct a new study room, bathroom & remove/replace (e) conc. stair w/new. all work at ground floor.Details
construct a new study room, bathroom & remove/replace (e) conc. stair w/new. all work at ground floor. | $32,000 |
| Nov 21, 2011 | Completed final sign-off Mar 2012 | 1520 Monterey Bl | remodel 2 existing bathrooms (guest bath @ 1st flr & kid bathrm @ 2nd flr)Details
remodel 2 existing bathrooms (guest bath @ 1st flr & kid bathrm @ 2nd flr) | $7,500 |
| Nov 17, 2011 | Completed final sign-off Nov 2011 | 1520 Monterey Bl | to obtain final inspection for work approved under pa# 200510054878. all work is complete.Details
to obtain final inspection for work approved under pa# 200510054878. all work is complete. | |
| Jun 29, 2009 | Completed final sign-off Feb 2010 | 2020 Kirkham St | remodel (e) bathroom at 3rd floor; remodel kitchen, bathroom & add one new bathroom & den. all work at 2nd floor; construct one bedroom, one full bathroom & storage room. all work at ground floor.Details
remodel (e) bathroom at 3rd floor; remodel kitchen, bathroom & add one new bathroom & den. all work at 2nd floor; construct one bedroom, one full bathroom & storage room. all work at ground floor. | $63,000 |
| May 14, 2009 | Completed final sign-off Aug 2009 | 419 22nd Av | remodel 1 kitchen, 1 bathroom,1 furnace at unit#419. install 1 main service & 2 panels.Details
remodel 1 kitchen, 1 bathroom,1 furnace at unit#419. install 1 main service & 2 panels. | $20,000 |
| Aug 29, 2008 | Completed final sign-off May 2009 | 1001 Greenwich St | installation of sprinkler system, 72-heads. nfpa-13Details
installation of sprinkler system, 72-heads. nfpa-13 | $15,000 |
| Mar 24, 2008 | Completed final sign-off Jul 2008 | 1654 30th Av | remodel (e) kitchen and bathroom and add one new bathroom at first fl. construct one bed/storage room, laundry area, 2 bathrooms and remodel one (e) bedroom on the ground floor.Details
remodel (e) kitchen and bathroom and add one new bathroom at first fl. construct one bed/storage room, laundry area, 2 bathrooms and remodel one (e) bedroom on the ground floor. | $78,000 |
| Dec 18, 2007 | Completed final sign-off Mar 2008 | 500 Sutter St | relocate 4 sprinkler heads at break room. (9th floor)Details
relocate 4 sprinkler heads at break room. (9th floor) | $800 |
| Nov 14, 2007 | Completed final sign-off Dec 2007 | 2434 16th Av | remodel 1 bathroom at upstair level. replace (e) fixtures with new fixtures (toilet, sink, & shower).Details
remodel 1 bathroom at upstair level. replace (e) fixtures with new fixtures (toilet, sink, & shower). | $7,000 |
| Jul 16, 2007 | Completed final sign-off Aug 2007 | 4431 Cabrillo St | kitchen and bathroom remodel. 50% lighting will be flourscentDetails
kitchen and bathroom remodel. 50% lighting will be flourscent | $20,000 |
| Mar 26, 2007 | Completed final sign-off Apr 2007 | 40 Boardman Pl | new 2x4 partition wall and new sheetrock. furring out from existing long wall) ref drawing 200607055687Details
new 2x4 partition wall and new sheetrock. furring out from existing long wall) ref drawing 200607055687 | $4,500 |