Kyvos Construction Inc
- Based in
- Pittsburg
- On San Francisco permits
- May 2019 to Mar 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Oct 2025 | 278 Niagara Av | kitchen remodel including new cabinets, appliances, counters, lighting, & finishes.Details
kitchen remodel including new cabinets, appliances, counters, lighting, & finishes. | $70,000 |
| Aug 28, 2023 | Never finaled issued Aug 2023, no final | 855 Folsom St | unit# 322: convert (e) tub to shower in same locaiton in (e) bath. repatch with tiling.Details
unit# 322: convert (e) tub to shower in same locaiton in (e) bath. repatch with tiling. | $8,000 |
| Apr 27, 2022 | Completed final sign-off Dec 2022 | 255 Berry St | unit 317: change all the outlets: move the bathroom vanity 3 feet. bathroom to retain all cbc chapter 11a features.Details
unit 317: change all the outlets: move the bathroom vanity 3 feet. bathroom to retain all cbc chapter 11a features. | $5,300 |
| Aug 11, 2021 | Completed final sign-off Feb 2022 | 149 Wool St | bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories.Details
bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories. | $20,000 |
| May 12, 2021 | Completed final sign-off Jun 2021 | 19 Burlwood Dr | kitchen cabinet (only 2 cabinets reinstallation) new back splash new counter. flooring.Details
kitchen cabinet (only 2 cabinets reinstallation) new back splash new counter. flooring. | $7,000 |
| Jan 20, 2021 | Completed final sign-off Apr 2021 | 1263 Oak St | unit 2: bathroom remodeling.Details
unit 2: bathroom remodeling. | $8,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 875 Vermont St | unit 202: kitchen and laundry remodel. upgrade. no structural work. plumbing and elec onlyDetails
unit 202: kitchen and laundry remodel. upgrade. no structural work. plumbing and elec only | $10,000 |
| Jan 20, 2021 | Completed final sign-off Jul 2021 | 1306 Hyde St | kitchen and laundry remodel. adding washer and dryer.Details
kitchen and laundry remodel. adding washer and dryer. | $30,000 |
| Jan 8, 2021 | Completed final sign-off Apr 2021 | 1263 Oak St | #2: kitchen remodeling. no change in wall & opening, layout. maintain 1-hr separation between units at area of work.Details
#2: kitchen remodeling. no change in wall & opening, layout. maintain 1-hr separation between units at area of work. | $8,000 |
| Nov 13, 2020 | Completed final sign-off Sep 2021 | 541 Dellbrook Av | 1/f: 2 new bedrooms, 2 new closets, (e) bathroom remodel and expansion. 2/f: no work at this level. only for referenceDetails
1/f: 2 new bedrooms, 2 new closets, (e) bathroom remodel and expansion. 2/f: no work at this level. only for reference | $25,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2021 | 1304 Hyde St | 1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work.Details
1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work. | $30,000 |
| Aug 24, 2020 | Completed final sign-off Feb 2022 | 69 Piedmont St | structural strengthening of front 25' of structure. revision to pa 2020 0210 3950- structural work only. no exterior work.Details
structural strengthening of front 25' of structure. revision to pa 2020 0210 3950- structural work only. no exterior work. | $32,000 |
| Jul 17, 2020 | Completed final sign-off Nov 2020 | 1033 Pacific Av | remove and replace upper & lower cabinets. adding washer and dryerDetails
remove and replace upper & lower cabinets. adding washer and dryer | $4,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 69 Piedmont St | kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1Details
kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1 | $180,000 |
| Oct 1, 2019 | Never finaled issued Oct 2019, no final | 2 Bonview St | relocate wet bar to outside patioDetails
relocate wet bar to outside patio | $6,800 |
| Aug 12, 2019 | Completed final sign-off Oct 2019 | 1141 Cole St | rehab. extg bath to replace extg shower with new bath tub. no walls to be removed. no change on extg structural. 2nd fl.Details
rehab. extg bath to replace extg shower with new bath tub. no walls to be removed. no change on extg structural. 2nd fl. | $16,000 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 2340 29th Av | rehab fireplace, add gas connection, add outlets.Details
rehab fireplace, add gas connection, add outlets. | $18,000 |
| May 13, 2019 | Expired or cancelled expired Jun 2025 | 1 Rausch St | interior remodel of unit a on ground flr. add glass panel & wall on mezzanine level. remodel kitchen fixtures and add new office on ground floor. no change to exterior or structuralDetails
interior remodel of unit a on ground flr. add glass panel & wall on mezzanine level. remodel kitchen fixtures and add new office on ground floor. no change to exterior or structural | $15,000 |