Kulchin-Condon Assoc Inc
- Based in
- Oakland
- On San Francisco permits
- Oct 2013 to May 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2022 | Never finaled issued May 2023, no final | 355 Avocet Wy | 100% afordable housing project.tiebacks from adjacent shoring sytems at 351 friedell st. reference bpa#201910083919-s2Details
100% afordable housing project.tiebacks from adjacent shoring sytems at 351 friedell st. reference bpa#201910083919-s2 | |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 150 Van Ness Av | temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a **Details
temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a ** | $750,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 55 Polk St | temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a **Details
temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a ** | $190,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2018 | 401 Van Ness Av | shoring and excavation and backfill for the construction of a pg&e electerical vault and generator vault 17' cut below existing grade using soldier piles, wood lagging and external steel bracingDetails
shoring and excavation and backfill for the construction of a pg&e electerical vault and generator vault 17' cut below existing grade using soldier piles, wood lagging and external steel bracing | $125,000 |