Permit GraphShortlistSan Francisco building permits since 2000

Ktm Construction Llc

Contractor license
1045468
State license record
Based in
Lincoln
On San Francisco permits
Mar 2026 to Apr 2026
Last 24 months
2 permits filed

2 permits since 2000: 1 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 30, 2026Completed
final sign-off May 2026
2030 Vallejo Stunit 204- connect (e) drain and water supply for ventless dryer, relocate electrical panel out of closet per code
Details
Permit
202604300415
Status
complete
Filed
Apr 30, 2026
Permit issued
Apr 30, 2026
Final sign-off
May 27, 2026
Declared cost
$6,000
Address
2030 Vallejo St

unit 204- connect (e) drain and water supply for ventless dryer, relocate electrical panel out of closet per code

Open the permit page

$6,000
Mar 4, 2026In progress
issued Mar 2026
2030 Vallejo Stunit 203 and 304- to include painting , flooring, and connect (e) drain and water supply for ventless dryer, relocate (e) subpanel to closet. no wall removal or layout change. replace countertop in each unit.
Details
Permit
202603046897
Status
issued
Filed
Mar 4, 2026
Permit issued
Mar 4, 2026
Declared cost
$16,000
Address
2030 Vallejo St

unit 203 and 304- to include painting , flooring, and connect (e) drain and water supply for ventless dryer, relocate (e) subpanel to closet. no wall removal or layout change. replace countertop in each unit.

Open the permit page

$16,000