Kroll Construction
- Based in
- Novato
- On San Francisco permits
- Oct 2011 to Aug 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 779 Elizabeth St | light bath remodel in existing bath, plumbing, electrical, tile.Details
light bath remodel in existing bath, plumbing, electrical, tile. | $5,500 |
| Oct 5, 2011 | Completed final sign-off Mar 2012 | 779 Elizabeth St | remodel bath on 2nd flr-no wall relocation,change plumbing, fixtures,elec upgrades. remodel kitchen on main floor. replace floor,change cabinets and plumbing fixtures. remove non bearing partitions. replacement of 2 bedroom windows on 2nd flr to comply with egress standards,not visible from street.Details
remodel bath on 2nd flr-no wall relocation,change plumbing, fixtures,elec upgrades. remodel kitchen on main floor. replace floor,change cabinets and plumbing fixtures. remove non bearing partitions. replacement of 2 bedroom windows on 2nd flr to comply with egress standards,not visible from street. | $20,000 |