Permit GraphShortlistSan Francisco building permits since 2000

Kris Jost-Building And Design

Contractor license
630971
State license record
Based in
San Francisco
On San Francisco permits
May 2023 to May 2023
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
May 26, 2023Completed
final sign-off Jan 2024
875 La Playaunit #281: replace bathtub, replace tub/shower. tile with new backerboard and tiles, replace floor tile. replace vanity & sink. replace ceiling fan, rewire ceiling lights and vanity light. patch sheetrock as needed. paint. install new shower diverter control & drain pipes as needed.
Details
Permit
202305268754
Status
complete
Filed
May 26, 2023
Permit issued
May 31, 2023
Final sign-off
Jan 16, 2024
Declared cost
$5,000
Address
875 La Playa

unit #281: replace bathtub, replace tub/shower. tile with new backerboard and tiles, replace floor tile. replace vanity & sink. replace ceiling fan, rewire ceiling lights and vanity light. patch sheetrock as needed. paint. install new shower diverter control & drain pipes as needed.

Open the permit page

$5,000