Kr White Construction
- Based in
- San Mateo
- On San Francisco permits
- Jul 2013 to Jun 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2015 | Completed final sign-off Aug 2015 | 385 Justin Dr | replace 4 windows visible from street with new wood clad windowsDetails
replace 4 windows visible from street with new wood clad windows | $3,200 |
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 760 Delano Av | 4 windows replaced size-4-size, 1 door replaced size-4-sizeDetails
4 windows replaced size-4-size, 1 door replaced size-4-size | $6,500 |
| Jul 23, 2013 | Completed final sign-off Jul 2013 | 711 04th Av | replace windows (inserts) size of for size visible from the street, 3 windows ttl face street, marvin grids to match existing grid with etc. no alterations comply with egress windowsDetails
replace windows (inserts) size of for size visible from the street, 3 windows ttl face street, marvin grids to match existing grid with etc. no alterations comply with egress windows | $3,600 |