Kr Johnston Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2025 to Oct 2026
- Last 24 months
- 18 permits filed
18 permits since 2000: 11 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 275 Battery St | first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department.Details
first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department. | $25,938 |
| Sep 29, 2026 | In progress issued Sep 2026 | 600 Townsend St | modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870Details
modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870 | $20,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 345 California St | 20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting.Details
20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting. | $750,000 |
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 301 Howard St | suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done.Details
suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done. | $5,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 275 Battery St | tenant improvment remodel of existing cafe at ground fl. minor millwork, flooring, and finish alterationsDetails
tenant improvment remodel of existing cafe at ground fl. minor millwork, flooring, and finish alterations | $25,938 |
| May 7, 2026 | In progress issued Aug 2026 | 600 Townsend St | project consists of modification of two (e) door swings, relocation of exterior door and installation of exterior steel stair. new millwork to be added in exterior courtyard mep will be deffered and provided by gc.Details
project consists of modification of two (e) door swings, relocation of exterior door and installation of exterior steel stair. new millwork to be added in exterior courtyard mep will be deffered and provided by gc. | $200,000 |
| May 7, 2026 | In progress issued Jun 2026 | 600 Townsend St | demolition of (e) non-structural partitions, non rated interior doors, and millwork to convert ste 100w and 105w into a new fitness room+ new offices. the renewed space will consist on non structural interior partitions, (n) finishes, new interior non rated doors, minimal millwork.Details
demolition of (e) non-structural partitions, non rated interior doors, and millwork to convert ste 100w and 105w into a new fitness room+ new offices. the renewed space will consist on non structural interior partitions, (n) finishes, new interior non rated doors, minimal millwork. | $1,400,000 |
| Apr 21, 2026 | In progress issued Jul 2026 | 600 Townsend St | scope of work includes restripe of existing violations to meet accessibility compliance under 2025 cbc 11b. minimal non structural storage reconfiguration to allow room for proper accessible parking stalls and aisles. no electrical or plumbing is expected in the scope.Details
scope of work includes restripe of existing violations to meet accessibility compliance under 2025 cbc 11b. minimal non structural storage reconfiguration to allow room for proper accessible parking stalls and aisles. no electrical or plumbing is expected in the scope. | $30,000 |
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 505 Howard St | 1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower roomsDetails
1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower rooms | $20,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 345 California St | 23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishesDetails
23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishes | $2,700,000 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | 1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996Details
1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996 | $40,000 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 760 Market St | 9/fl- structrual anchoring of 7 (e) phone booths all other elements are (e) to remain. no proposed changes.Details
9/fl- structrual anchoring of 7 (e) phone booths all other elements are (e) to remain. no proposed changes. | $17,500 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | minimal finish demo and construction of new non bearing partitions to create 2 new rooms within e suite 150. no change of use or occupncy proposed. mep to be design build and provided by gc. ab 107 suite is vacant with no interior ada upgrades, deferred until future tenant occupancy.no accessibleDetails
minimal finish demo and construction of new non bearing partitions to create 2 new rooms within e suite 150. no change of use or occupncy proposed. mep to be design build and provided by gc. ab 107 suite is vacant with no interior ada upgrades, deferred until future tenant occupancy.no accessible | $115,000 |
| Oct 31, 2025 | Completed final sign-off Jul 2026 | 301 Howard St | suite 120 1st fl: tenant improvement of empty shell for new low impact fitness studio including 2 new restrooms. change of use from office to fitness.Details
suite 120 1st fl: tenant improvement of empty shell for new low impact fitness studio including 2 new restrooms. change of use from office to fitness. | $565,000 |
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 275 Battery St | 7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area.Details
7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area. | $204,482 |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 275 Battery St | 7th/f ste 710: demo & construction of non strutural partitions, doors, & finishes, monor alterationsDetails
7th/f ste 710: demo & construction of non strutural partitions, doors, & finishes, monor alterations | $89,735 |
| Jan 24, 2025 | Completed final sign-off Mar 2025 | 275 Battery St | relocate lightening for 6 new offices, switches and receptacles. no new lightening. re-locate hvac 6 new offices, re-locate hvac for 6 new offices revision to pa#2025-0117-8539Details
relocate lightening for 6 new offices, switches and receptacles. no new lightening. re-locate hvac 6 new offices, re-locate hvac for 6 new offices revision to pa#2025-0117-8539 | |
| Jan 17, 2025 | Completed final sign-off Mar 2025 | 275 Battery St | 7 fl: interior tenant improvement. demo and construction of non structural partitions, doors, ceilings, glazing, and finishes. no change in occupancy,use, area. mep deferredDetails
7 fl: interior tenant improvement. demo and construction of non structural partitions, doors, ceilings, glazing, and finishes. no change in occupancy,use, area. mep deferred | $129,728 |