22 permits since 2000: 20 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Feb 2019 | 774 10th Av | horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan.Details
horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan. | $175,000 |
| Sep 25, 2014 | Completed final sign-off Dec 2014 | 4207 Geary Bl | new chocolate retail shop - addition of 3 compartment sink, hand wash station, mop sink, water heater, new retail counter, handicapped accessible door opener, new retail lighting & additional duplexes. no change of use.Details
new chocolate retail shop - addition of 3 compartment sink, hand wash station, mop sink, water heater, new retail counter, handicapped accessible door opener, new retail lighting & additional duplexes. no change of use. | $18,000 |
| Mar 21, 2014 | Completed final sign-off May 2014 | 91 States St | 3rd floor master bedroom bathroom 3 x 3 corner shower dry rot repair. this requires the removal of the shower and tile floor to gain access to the affected area. this will allow the necessary repair along with the subsequent reinstallation of the shower and replacement of the tile floor.Details
3rd floor master bedroom bathroom 3 x 3 corner shower dry rot repair. this requires the removal of the shower and tile floor to gain access to the affected area. this will allow the necessary repair along with the subsequent reinstallation of the shower and replacement of the tile floor. | $10,000 |
| Aug 20, 2013 | Completed final sign-off Aug 2013 | 1081 Haight St | repair ceiling water leak in the bedroom at 1081 haight st.Details
repair ceiling water leak in the bedroom at 1081 haight st. | $3,000 |
| Jul 24, 2012 | Completed final sign-off Sep 2012 | 210 Post St | 7th floor ste 705 - build 2nd ceiling to lower elevations with 2 translucent access panels for lighting on (e) ceiling fire inspector to field verify if sprinklers and/or fire alarm work is triggered by this permit.Details
7th floor ste 705 - build 2nd ceiling to lower elevations with 2 translucent access panels for lighting on (e) ceiling fire inspector to field verify if sprinklers and/or fire alarm work is triggered by this permit. | $4,500 |
| May 11, 2012 | Completed final sign-off Jun 2012 | 137 Vasquez Av | replacing three front windows for marvin wooden windows with double pane low e glass with argon, dimensions of the new windows will be exactly this same as existing windows.Details
replacing three front windows for marvin wooden windows with double pane low e glass with argon, dimensions of the new windows will be exactly this same as existing windows. | $4,000 |
| Dec 5, 2011 | Completed final sign-off Jan 2012 | 1949 Webster St | dry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacementDetails
dry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacement | $2,500 |
| Mar 19, 2010 | Completed final sign-off May 2010 | 3575 Clay St | on a small 2 level structure adjacent & attached to the rear side of main bldg both roof membrane above top level & deck membrane at intermediate level are being changed. there may be dry rot beneath the existing membranes w/c must be repaired as welDetails
on a small 2 level structure adjacent & attached to the rear side of main bldg both roof membrane above top level & deck membrane at intermediate level are being changed. there may be dry rot beneath the existing membranes w/c must be repaired as wel | $7,000 |
| Nov 6, 2009 | Completed final sign-off Dec 2009 | 667 London St | addition to 200910300205, new supporting structures of df are slightly modified to provide a uniform thred width. aluminum wood siding replaced with wood siding as needed.Details
addition to 200910300205, new supporting structures of df are slightly modified to provide a uniform thred width. aluminum wood siding replaced with wood siding as needed. | $1,500 |
| Oct 30, 2009 | Completed final sign-off Dec 2009 | 667 London St | replace 13 out of 15 wood threads and risers due to damage caused by age. remaining 2 steps are concrete witch will not be changed in any way. top wooden landing will also not be disturbed. stringers and side walls wil remain. handrail on 1 side will be modifiedDetails
replace 13 out of 15 wood threads and risers due to damage caused by age. remaining 2 steps are concrete witch will not be changed in any way. top wooden landing will also not be disturbed. stringers and side walls wil remain. handrail on 1 side will be modified | $3,000 |
| Feb 21, 2007 | Completed final sign-off Apr 2007 | 3059 Franklin St | replace 10 wooden front windows, min u factor 0.67Details
replace 10 wooden front windows, min u factor 0.67 | $3,500 |
| Feb 7, 2007 | Completed final sign-off May 2007 | 2927 Pierce St | field revision to 200503288486. change open rail at south side of deck to solid. add 2 windows at south wall of addition . u-factor.42 or less. remove kitchen remodel from scope of work.Details
field revision to 200503288486. change open rail at south side of deck to solid. add 2 windows at south wall of addition . u-factor.42 or less. remove kitchen remodel from scope of work. | $1,000 |
| Mar 14, 2006 | Completed final sign-off May 2006 | 1596 Fulton St | small fire damage to main entryDetails
small fire damage to main entry | $4,000 |
| Jan 5, 2006 | Completed final sign-off Apr 2006 | 1596 Fulton St | revision 200410086305 to increase valuation per field insp correction noticeDetails
revision 200410086305 to increase valuation per field insp correction notice | $25,000 |
| Sep 15, 2005 | Completed final sign-off Nov 2005 | 265 21st Av | repair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repairDetails
repair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repair | $3,000 |
| Mar 28, 2005 | Completed final sign-off Nov 2007 | 2927 Pierce St | 1st floor addition @ rear yard (283 sf) 3rd floor infill @ rear building (21 sf) interiror kitchen remodel.Details
1st floor addition @ rear yard (283 sf) 3rd floor infill @ rear building (21 sf) interiror kitchen remodel. | $38,000 |
| Oct 7, 2004 | Completed final sign-off Dec 2004 | 1360 05th Av | new kchn cabinets and kchn countertopDetails
new kchn cabinets and kchn countertop | $5,200 |
| Jul 26, 2004 | Expired or cancelled cancelled Jan 2006 | 1596 Fulton St | rot beam replacement on deckDetails
rot beam replacement on deck | $6,000 |
| Mar 24, 2004 | Completed final sign-off May 2004 | 162 Beverly St | in kind repair of dry rot at right front corner of building per report #863392, inspected 12/15/03-Details
in kind repair of dry rot at right front corner of building per report #863392, inspected 12/15/03- | $3,000 |
| May 14, 2003 | Completed final sign-off Jul 2003 | 54 Carmelita St | dryrot repair of root above guest room. (100sq ft) at 2nd fl. replace exterior alum door to kidsrm.Details
dryrot repair of root above guest room. (100sq ft) at 2nd fl. replace exterior alum door to kidsrm. | $8,000 |
| Dec 31, 2001 | Completed final sign-off Jul 2002 | 54 Carmelita St | renew for 200009110229Details
renew for 200009110229 | $5,000 |
| Sep 13, 2001 | Expired or cancelled expired May 2003 | 78 Carmelita St | bathroom renovation/enlarge extg dormerDetails