Kong's Plumbing & Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- May 2000 to Aug 2023
- Last 24 months
- 0 permits filed
80 permits since 2000: 62 completed, 7 never finaled, 11 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2023 | Completed final sign-off Aug 2023 | 1702 Church St | to obtain final inspection for work approved under pa# 201709289813. all work is complete.Details
to obtain final inspection for work approved under pa# 201709289813. all work is complete. | |
| Jul 3, 2023 | Completed final sign-off Apr 2025 | 1958 47th Av | to obtain final inspection for work approved under pa#201211295161. all work is complete.Details
to obtain final inspection for work approved under pa#201211295161. all work is complete. | |
| Jul 3, 2023 | Completed final sign-off Aug 2023 | 1702 Church St | to obtain final inspection for work approved under pa#201411262594, 201611293671 & 201708104530. all work is complete.Details
to obtain final inspection for work approved under pa#201411262594, 201611293671 & 201708104530. all work is complete. | |
| Dec 16, 2022 | Completed final sign-off Jan 2023 | 27 Seville St | renewal permit# 2019-0826-9878: to obtain final inspection for work approved under pa# 2019-0826-9878: all work is completed.Details
renewal permit# 2019-0826-9878: to obtain final inspection for work approved under pa# 2019-0826-9878: all work is completed. | |
| Oct 5, 2022 | Completed final sign-off Jan 2023 | 27 Seville St | g/f: reconfigure bath, add kitchenette and non bearing partition wall. ref to pa#202201115764.Details
g/f: reconfigure bath, add kitchenette and non bearing partition wall. ref to pa#202201115764. | $3,000 |
| Jan 11, 2022 | Completed final sign-off Jan 2023 | 27 Seville St | add 2 bedrooms, 1 bath, 1 gym room, 1 media room @ ground floor; add 1 bath @ 2nd floorDetails
add 2 bedrooms, 1 bath, 1 gym room, 1 media room @ ground floor; add 1 bath @ 2nd floor | $50,888 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 1126 Stanyan St | repair & replace backstair way damage dryrot lumber & handrail. total repair not to exceed 50% of overall structure.Details
repair & replace backstair way damage dryrot lumber & handrail. total repair not to exceed 50% of overall structure. | $7,000 |
| Aug 26, 2019 | Completed final sign-off Jan 2023 | 27 Seville St | remodel bathroom & kitchen: fully demolish (e) bathroom, kitchen caibnets, and counter top, partial living ceiling dryall damgne by roof leak.Details
remodel bathroom & kitchen: fully demolish (e) bathroom, kitchen caibnets, and counter top, partial living ceiling dryall damgne by roof leak. | $6,000 |
| Dec 27, 2018 | Completed final sign-off Apr 2019 | 2600 Van Ness Av | #303: rehabilitate (e) bathroom. rehabilitate (e) kitchen. install washer/dryer.Details
#303: rehabilitate (e) bathroom. rehabilitate (e) kitchen. install washer/dryer. | $28,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2019 | 1660 Bay St | unit # 303 convert (e) dining/kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install w/dDetails
unit # 303 convert (e) dining/kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install w/d | $45,000 |
| Sep 19, 2018 | Completed final sign-off Jan 2019 | 1690 North Point St | #303- rehabilitate kitchen, rehabilitate (e) bathroom. install w/d maher naDetails
#303- rehabilitate kitchen, rehabilitate (e) bathroom. install w/d maher na | $38,000 |
| Sep 19, 2018 | Completed final sign-off Jan 2019 | 1690 North Point St | #202 -rehabilitate (e) kitchen, rehabilitate(e) bathroom. install w/d maher naDetails
#202 -rehabilitate (e) kitchen, rehabilitate(e) bathroom. install w/d maher na | $33,000 |
| Sep 7, 2018 | Completed final sign-off Feb 2019 | 2600 Van Ness Av | unit 202 - rehabilitate (e) bathroom and kitchen. install washer/dryerDetails
unit 202 - rehabilitate (e) bathroom and kitchen. install washer/dryer | $35,000 |
| Aug 3, 2018 | Completed final sign-off Dec 2018 | 1660 Bay St | unit 101 convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer dryer maher not reqDetails
unit 101 convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer dryer maher not req | $38,000 |
| Jul 9, 2018 | Completed final sign-off Nov 2018 | 2600 Van Ness Av | unit#403 rehabilitate (e) bathroom. inatall w/dDetails
unit#403 rehabilitate (e) bathroom. inatall w/d | $17,000 |
| Jul 9, 2018 | Completed final sign-off Oct 2018 | 2975 Van Ness Av | apt #9: rehabilitate (e) bathroom. install washer / dryer. maher n/a.Details
apt #9: rehabilitate (e) bathroom. install washer / dryer. maher n/a. | $18,000 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 1690 North Point St | unit 304 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 304 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $40,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 1690 North Point St | unit #102: 1)rehabilitate extg kitchen, 2) rehabilitate extg bathroom. 3)install washer/dryer.convert e dining rm into bedroom n/a for maherDetails
unit #102: 1)rehabilitate extg kitchen, 2) rehabilitate extg bathroom. 3)install washer/dryer.convert e dining rm into bedroom n/a for maher | $34,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 621 Stockton St | street spaceDetails
street space | |
| Jan 30, 2018 | Never finaled issued Jan 2018, no final | 1690 North Point St | #105: renew existing permit #201405165963 for continuation of work.Details
#105: renew existing permit #201405165963 for continuation of work. | $4,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 621 Stockton St | unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher naDetails
unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher na | $34,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 1329 Columbus Av | tile & paint walls in dining area and restrooms (floor tiles & toilet floors; no work in kitchen.Details
tile & paint walls in dining area and restrooms (floor tiles & toilet floors; no work in kitchen. | $5,900 |
| Jan 3, 2018 | Completed final sign-off Apr 2018 | 835 Pine St | #14 - rehabiliate (e) kitchen & bathroom. install w/d maher naDetails
#14 - rehabiliate (e) kitchen & bathroom. install w/d maher na | $27,000 |
| Nov 3, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | unit 403 rehabilitate existing kitchen, existing bath,install washer dryerDetails
unit 403 rehabilitate existing kitchen, existing bath,install washer dryer | $20,000 |
| Sep 28, 2017 | Expired or cancelled expired Aug 2023 | 1702 Church St | add kitchen to rear rooms, upgrade all finishes, create efficiency apartment. total 335 sq ft within existing evelope.no change to building footprint or evelope, no change to exterior.Details
add kitchen to rear rooms, upgrade all finishes, create efficiency apartment. total 335 sq ft within existing evelope.no change to building footprint or evelope, no change to exterior. | $18,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2021 | 948 South Van Ness Av | soft story retrofit per sfebc chapter 4dDetails
soft story retrofit per sfebc chapter 4d | $80,000 |
| Sep 5, 2017 | Completed final sign-off Dec 2018 | 1126 Stanyan St | soft story retrofitt per 2016 cebc appendix a-4Details
soft story retrofitt per 2016 cebc appendix a-4 | $15,000 |
| Sep 5, 2017 | Completed final sign-off Jul 2018 | 2620 Laguna St | 1 penthouse dormer to be demo'ed and replaced with new dormer and sliding door. n/a maherDetails
1 penthouse dormer to be demo'ed and replaced with new dormer and sliding door. n/a maher | $10,000 |
| Sep 5, 2017 | Completed final sign-off May 2018 | 621 Stockton St | add new window located on the 4th floor unit 301 at building front @ penthouse frontDetails
add new window located on the 4th floor unit 301 at building front @ penthouse front | $1,000 |
| Aug 30, 2017 | Completed final sign-off Apr 2018 | 328 Stanyan St | unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher naDetails
unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher na | $46,000 |
| Aug 10, 2017 | Expired or cancelled expired Aug 2023 | 1702 Church St | additional work for (e) bpa#201611293671, replace (22) wood window to match (e) 2/f onlyDetails
additional work for (e) bpa#201611293671, replace (22) wood window to match (e) 2/f only | $13,000 |
| Jul 24, 2017 | Completed final sign-off Dec 2017 | 50 Laguna St | #509: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. maher naDetails
#509: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. maher na | $36,000 |
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 1690 North Point St | unit 104 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer & dryerDetails
unit 104 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer & dryer | $40,000 |
| Mar 28, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher naDetails
revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher na | |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 332 Stanyan St | unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 322 Stanyan St | unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Nov 29, 2016 | Expired or cancelled expired Aug 2023 | 1702 Church St | to increase cost of estimated work by an additional $40,000 on pa#201411262594. the increased cost will reflect a total of $87,500 on entire project.Details
to increase cost of estimated work by an additional $40,000 on pa#201411262594. the increased cost will reflect a total of $87,500 on entire project. | $40,000 |
| Nov 9, 2016 | Completed final sign-off Apr 2017 | 50 Laguna St | unit #505, 6th floor - relcoate kitchen, convert existing dining room to bedroom, add washer & dryer. n/a maher ordinanceDetails
unit #505, 6th floor - relcoate kitchen, convert existing dining room to bedroom, add washer & dryer. n/a maher ordinance | $35,000 |
| Nov 3, 2016 | Completed final sign-off Apr 2017 | 50 Laguna St | unit #605 - 7th flr, remodel. relocate (e) kitchen. convert (e) dining to bedroom. add w/d mahaer naDetails
unit #605 - 7th flr, remodel. relocate (e) kitchen. convert (e) dining to bedroom. add w/d mahaer na | $35,000 |
| Nov 3, 2016 | Completed final sign-off Apr 2017 | 1690 North Point St | unit #203 - 3rd flr, remodel (e) bathroom w/exhaust fan. relocate (e) kitchen. convert (e) dining to bedroom. add w/dDetails
unit #203 - 3rd flr, remodel (e) bathroom w/exhaust fan. relocate (e) kitchen. convert (e) dining to bedroom. add w/d | $30,000 |
| Oct 11, 2016 | Completed final sign-off Mar 2017 | 1690 North Point St | unit 201, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) dining room to bedroom, add washer & dryerDetails
unit 201, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) dining room to bedroom, add washer & dryer | $25,000 |
| Oct 7, 2016 | Completed final sign-off Mar 2017 | 1690 North Point St | 3rd floor unit #205: remodel (e) kitchen, bathroom. convert (e) dining room to bedroom. add bathroom. add w/dDetails
3rd floor unit #205: remodel (e) kitchen, bathroom. convert (e) dining room to bedroom. add bathroom. add w/d | $50,000 |
| Aug 4, 2016 | Completed final sign-off Nov 2016 | 50 Laguna St | unit #307 on the 3rd floor - remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a maher ordinanceDetails
unit #307 on the 3rd floor - remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a maher ordinance | $20,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 140 Duboce Av | unit #203 at 3rd floor: remodel extg bathroom. remodel extg kitchen, and add washer and dryer.Details
unit #203 at 3rd floor: remodel extg bathroom. remodel extg kitchen, and add washer and dryer. | $25,000 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 50 Laguna St | remodel unit 208 @ 3rdfloor, remodel existing bathroom, relocated & remodel existing kitchen, convert existing kitchen into bedroom. add washer and dryer. maher naDetails
remodel unit 208 @ 3rdfloor, remodel existing bathroom, relocated & remodel existing kitchen, convert existing kitchen into bedroom. add washer and dryer. maher na | $30,000 |
| Oct 2, 2015 | Completed final sign-off Feb 2016 | 50 Laguna St | unit #104: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher naDetails
unit #104: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher na | $20,000 |
| Sep 4, 2015 | Completed final sign-off Feb 2016 | 50 Laguna St | unit #502 - 6th floor - remodel exisitng bathroom, relocate & remodel existing kitchen, add den, add washer & dryer.Details
unit #502 - 6th floor - remodel exisitng bathroom, relocate & remodel existing kitchen, add den, add washer & dryer. | $30,000 |
| Jul 15, 2015 | Completed final sign-off Oct 2016 | 1222 25th Av | revision to app#201408083419. relocate extg hall and master bath at 3rd floor. create new study at 3rd floor.Details
revision to app#201408083419. relocate extg hall and master bath at 3rd floor. create new study at 3rd floor. | $35,000 |
| Jun 5, 2015 | Completed final sign-off Nov 2015 | 2405 Anza St | remove (e) kitchen cabinet & counter tops. replace (n) kitchen cabinet & counter top. remove (e) bathroom tile, fixtures & faucet. replace (n) bathroom tilet, new fixtures & faucets. new electrical & plumbing. interior painting.Details
remove (e) kitchen cabinet & counter tops. replace (n) kitchen cabinet & counter top. remove (e) bathroom tile, fixtures & faucet. replace (n) bathroom tilet, new fixtures & faucets. new electrical & plumbing. interior painting. | $15,000 |
| Feb 13, 2015 | Completed final sign-off Jun 2015 | 325 09th Av | #1- remodel of kitchen, bathroom & add w/d.Details
#1- remodel of kitchen, bathroom & add w/d. | $30,000 |
| Feb 12, 2015 | Completed final sign-off Jul 2015 | 3809 20th St | #305- add washer & dryer, add dishwasher. n/a ordinance #155-13Details
#305- add washer & dryer, add dishwasher. n/a ordinance #155-13 | $10,000 |
| Dec 23, 2014 | Completed final sign-off Jul 2015 | 1750 Golden Gate Av | #4 - relocate kitchen & fixtures, plumbing & electricalDetails
#4 - relocate kitchen & fixtures, plumbing & electrical | $10,000 |
| Oct 21, 2014 | Completed final sign-off Mar 2015 | 3809 20th St | unit #303: remodel/relocating kitchen fixtures, add new w/d, new laundry outlet.Details
unit #303: remodel/relocating kitchen fixtures, add new w/d, new laundry outlet. | $10,000 |
| Oct 9, 2014 | Completed final sign-off Feb 2015 | 381 Turk St | #105: remove kitchen cabinet, bathroom fixture, tile & floor. install new kitchen cabinet, counter top & new bathroom fixture & tile, new electrical outlet, switches & light.Details
#105: remove kitchen cabinet, bathroom fixture, tile & floor. install new kitchen cabinet, counter top & new bathroom fixture & tile, new electrical outlet, switches & light. | $18,000 |
| Sep 16, 2014 | Completed final sign-off Jul 2015 | 1750 Golden Gate Av | remodel unit #7: add new bedroom and closet, relocate kitchen fixtures & cabinets. (add condensing dryer and outlet)Details
remodel unit #7: add new bedroom and closet, relocate kitchen fixtures & cabinets. (add condensing dryer and outlet) | $10,000 |
| Apr 23, 2014 | Completed final sign-off Oct 2014 | 1750 Golden Gate Av | 1)remodel unit #6: 2) add a new bedroom and 2 closets, new laundry outlet.3) relocating of kitchen fixture and cabinets. 4)remodeling of bathroom. 5)plumbing and electrical under seperate permit.Details
1)remodel unit #6: 2) add a new bedroom and 2 closets, new laundry outlet.3) relocating of kitchen fixture and cabinets. 4)remodeling of bathroom. 5)plumbing and electrical under seperate permit. | $20,000 |
| Apr 8, 2014 | Expired or cancelled cancelled Jan 2026 | 320 Hearst Av | revision to appl #2014.0318.0993: reconfigure 3rd floor bathroom.Details
revision to appl #2014.0318.0993: reconfigure 3rd floor bathroom. | |
| Mar 18, 2014 | Completed final sign-off Jun 2014 | 320 Hearst Av | demolish wall between office & family room. remodel & resize 3rd floor bathroom.Details
demolish wall between office & family room. remodel & resize 3rd floor bathroom. | $6,000 |
| Nov 29, 2012 | Expired or cancelled expired Apr 2025 | 1958 47th Av | rear addition for master bedroom, master bath, living room and study.Details
rear addition for master bedroom, master bath, living room and study. | $80,000 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 2722 Gough St | repair and replace back stair damaged step & handrail, less than 50%.Details
repair and replace back stair damaged step & handrail, less than 50%. | $800 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 650 Florida St | space "d" construct & install ada bathroom. ref pa #200509084197.Details
space "d" construct & install ada bathroom. ref pa #200509084197. | $8,000 |
| Dec 7, 2010 | Completed final sign-off May 2011 | 1000 Montgomery St | remodel of ground level men's and women's toilets rooms. signage at various locations. all work/barrier removalDetails
remodel of ground level men's and women's toilets rooms. signage at various locations. all work/barrier removal | $35,000 |
| Aug 2, 2010 | Completed final sign-off Jan 2011 | 650 Florida St | install accessible bathroom wall, fixture & demising wall. install wall to cover plumbing pipe, refernece pa #200509284197. for 3-bathrooms.Details
install accessible bathroom wall, fixture & demising wall. install wall to cover plumbing pipe, refernece pa #200509284197. for 3-bathrooms. | $12,000 |
| Jun 28, 2010 | Expired or cancelled cancelled Jan 2026 | 101 Campbell Av | revision to 201006073926: add new bathroom at bedroom 2 on 2nd floorDetails
revision to 201006073926: add new bathroom at bedroom 2 on 2nd floor | $6,500 |
| Jun 28, 2010 | Completed final sign-off Sep 2010 | 101 Campbell Av | reroofingDetails
reroofing | $2,000 |
| Jun 21, 2010 | Completed final sign-off Sep 2010 | 101 Campbell Av | repair some water damage joist and siding and part of roof wood damageDetails
repair some water damage joist and siding and part of roof wood damage | $1,500 |
| Jun 7, 2010 | Completed final sign-off Feb 2011 | 101 Campbell Av | remodel kitchen on ground floor. remodel study on basement floor. add full bath on basement floor. remodel bath on 2nd flDetails
remodel kitchen on ground floor. remodel study on basement floor. add full bath on basement floor. remodel bath on 2nd fl | $18,000 |
| Feb 3, 2010 | Completed final sign-off May 2010 | 2162 32nd Av | kitchen remodel: replace the new cabinets & new countertop. add some outlets and replace new sink and dishwasher. at least 50% high efficacy lighting (by wattage).Details
kitchen remodel: replace the new cabinets & new countertop. add some outlets and replace new sink and dishwasher. at least 50% high efficacy lighting (by wattage). | $8,000 |
| Dec 23, 2009 | Completed final sign-off Apr 2010 | 20 15th Av | revision to appl.#200911181588. second & third flr.: hall bath room change shower & vanity location, kitchen remove small wall. first flr.: change bedroom doorway & missed one window on the exterior wall as original house plans.Details
revision to appl.#200911181588. second & third flr.: hall bath room change shower & vanity location, kitchen remove small wall. first flr.: change bedroom doorway & missed one window on the exterior wall as original house plans. | |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 20 15th Av | remodel the 2/fl & 3/fl. kitchen & 2 bathroom. such as damage new cabinet, new tile, new painting etc. rebuilt new rooms and new bathroom on basement.Details
remodel the 2/fl & 3/fl. kitchen & 2 bathroom. such as damage new cabinet, new tile, new painting etc. rebuilt new rooms and new bathroom on basement. | $65,000 |
| Jul 27, 2009 | Completed final sign-off Oct 2009 | 5636 California St | remodel existing kitchen & bathroom, including new cabinets, toilet, wash basin, new bath tub and new recess, lighting in kitchen.Details
remodel existing kitchen & bathroom, including new cabinets, toilet, wash basin, new bath tub and new recess, lighting in kitchen. | $9,000 |
| Apr 14, 2009 | Never finaled issued Apr 2009, no final | 1323 17th Av | work @ unit# 1323 & unit# 1325. remove & replace existing bath-tub, 2 toilets, 2 wash basin, kitchen cabinet & counter. repair & replace damage landing, step & some hand rail at back stairway. no structural work for both units. provide h.e. lights per title 24. exterior or interior paint.Details
work @ unit# 1323 & unit# 1325. remove & replace existing bath-tub, 2 toilets, 2 wash basin, kitchen cabinet & counter. repair & replace damage landing, step & some hand rail at back stairway. no structural work for both units. provide h.e. lights per title 24. exterior or interior paint. | $42,000 |
| Jan 24, 2003 | Completed final sign-off Apr 2003 | 12 Vicksburg St | to comply with 3r physical inspection report 3-r 3726 (see attached report)Details
to comply with 3r physical inspection report 3-r 3726 (see attached report) | $2,000 |
| Aug 19, 2002 | Expired or cancelled expired Mar 2003 | 4123 Pacheco St | repair damaged stair to basement, remove bathroom wall & flr tile repair damaged dry rot & damged woDetails
repair damaged stair to basement, remove bathroom wall & flr tile repair damaged dry rot & damged wo | $4,500 |
| Feb 6, 2002 | Expired or cancelled expired Aug 2002 | 804 Euclid Av | remove existing damage & cracked plaster @ceiling hallway & kitchen area.no structural work.replaceDetails
remove existing damage & cracked plaster @ceiling hallway & kitchen area.no structural work.replace | $6,000 |
| Jan 22, 2002 | Completed final sign-off Apr 2002 | 2385 Alemany Bl | remove existing damage store stair, damage stucco at wall and in front of the bldng, install new stoDetails
remove existing damage store stair, damage stucco at wall and in front of the bldng, install new sto | $5,000 |
| Apr 9, 2001 | Expired or cancelled expired Aug 2001 | 1567 28th Av | remove damage dryrot & loose tile in basement shower. replace waterproof material & tile for shower.Details
remove damage dryrot & loose tile in basement shower. replace waterproof material & tile for shower. | $3,500 |
| Dec 28, 2000 | Expired or cancelled expired Apr 2001 | 115 Hazelwood Av | remove dry/damaged window sill for 3 bsmt wndw some damage stucco rmv/rplce floor in bsmt bathDetails
remove dry/damaged window sill for 3 bsmt wndw some damage stucco rmv/rplce floor in bsmt bath | $3,000 |
| May 9, 2000 | Expired or cancelled expired Sep 2000 | 1015 Folsom St | addition of voice evacuation system to existing fire alarm systemDetails
addition of voice evacuation system to existing fire alarm system | $2,000 |
| May 2, 2000 | Completed final sign-off Aug 2000 | 253 Kearny St | tenant improvement related work on fire alarm system, on 7th floor.Details
tenant improvement related work on fire alarm system, on 7th floor. | $300 |