Kolby Development
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jun 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2024 | Completed final sign-off Feb 2025 | 75 Justin Dr | 2nd fl interior remodel. master bath addition, some partial wall removal and some new partition wall. new master bath closet. remodel kitchen.Details
2nd fl interior remodel. master bath addition, some partial wall removal and some new partition wall. new master bath closet. remodel kitchen. | $25,000 |
| Sep 28, 2022 | Completed final sign-off Dec 2023 | 381 Mangels Av | remove & replace (e) 3' wood retaining wall with a new conc wall, replace the (e) sliding door at living roomDetails
remove & replace (e) 3' wood retaining wall with a new conc wall, replace the (e) sliding door at living room | $35,000 |
| Dec 3, 2021 | Completed final sign-off Feb 2022 | 2199 Divisadero St | foundation repair: remove brick stem walls & replace with reinforced concrete stem wall. volunyrrt partial foundation strengthening.Details
foundation repair: remove brick stem walls & replace with reinforced concrete stem wall. volunyrrt partial foundation strengthening. | $55,000 |
| Sep 2, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | remove center wall in office, replace 1 window and remove 1 in office (not visible from street) remove door in master bed for pocket door. move door & build a 3 ft wall in study. relocate wall bew storage and garage. rev.to 202106222971Details
remove center wall in office, replace 1 window and remove 1 in office (not visible from street) remove door in master bed for pocket door. move door & build a 3 ft wall in study. relocate wall bew storage and garage. rev.to 202106222971 | $9,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383.Details
kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383. | $45,000 |
| Jun 14, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. installing gas line. | $97,000 |
| Mar 3, 2021 | Completed final sign-off Apr 2022 | 3631 Santiago St | 1/f: in-fill under (e) 2/f habitable space. remodel family room. add 1 full bathroom & 2 bedrooms. 2/f: add deck & stairway at rear.Details
1/f: in-fill under (e) 2/f habitable space. remodel family room. add 1 full bathroom & 2 bedrooms. 2/f: add deck & stairway at rear. | $65,000 |
| Dec 19, 2019 | Completed final sign-off Sep 2020 | 400 Goettingen St | revision to app#201804025255. remodel of 1st floor: convert extg den to storage to new children multi purpose room for in home daycare (15 children or less). remodel extg bathroom, nw laundry room, replace extg rear yard patio and gravel with sod. remodel of 2nd floor: remodel extg kitchen new bathDetails
revision to app#201804025255. remodel of 1st floor: convert extg den to storage to new children multi purpose room for in home daycare (15 children or less). remodel extg bathroom, nw laundry room, replace extg rear yard patio and gravel with sod. remodel of 2nd floor: remodel extg kitchen new bath | |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 2 Pearl St | apt #2 - revision to 201909040592 install plm & ele for w/d vent. install four light in ceiling, block, install sheetrockDetails
apt #2 - revision to 201909040592 install plm & ele for w/d vent. install four light in ceiling, block, install sheetrock | $3,800 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 2 Pearl St | all work in apt # 2: remodel existing bathroom, no change in walls and opening layout: remove existing bathroom shower, toilet sink, tiles, replace with new pre-fab shower pan, toilet sink and tile. install new can lights in bathroom. (led)Details
all work in apt # 2: remodel existing bathroom, no change in walls and opening layout: remove existing bathroom shower, toilet sink, tiles, replace with new pre-fab shower pan, toilet sink and tile. install new can lights in bathroom. (led) | $12,500 |
| Oct 9, 2018 | Completed final sign-off Jan 2019 | 73 Sumner St | #202 - replace toilet, sink, bath tub, tile surround and floor , pokcket door.Details
#202 - replace toilet, sink, bath tub, tile surround and floor , pokcket door. | $19,000 |
| Apr 2, 2018 | Completed final sign-off Sep 2020 | 400 Goettingen St | conversion of first floor into childcare of 14 and less children, upgrades to second floor bathroom, (n) bathroom, kitchen and bedroom renovation, replacement of stair case, rear yard renovation.Details
conversion of first floor into childcare of 14 and less children, upgrades to second floor bathroom, (n) bathroom, kitchen and bedroom renovation, replacement of stair case, rear yard renovation. | $170,000 |
| Jul 28, 2017 | Completed final sign-off Feb 2018 | 73 Sumner St | make wall taller for 2nd closet. remodel e bath. new fixtures/shower maher not reqDetails
make wall taller for 2nd closet. remodel e bath. new fixtures/shower maher not req | $19,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2017 | 83 Scotia Av | remove dryrotted siding in various places (1x8 sliplap redwood). replace side door, & molding. replace dryrotted window molding. at rear of the house.Details
remove dryrotted siding in various places (1x8 sliplap redwood). replace side door, & molding. replace dryrotted window molding. at rear of the house. | $4,800 |
| Nov 7, 2016 | Completed final sign-off Dec 2016 | 445 Francisco St | partial bathroom remodel - remove tile and tub. install shower pan(pre fab), new shower valve and head. replace tile shower walls. tile bathroom floor. install led light fixture on ceiling.Details
partial bathroom remodel - remove tile and tub. install shower pan(pre fab), new shower valve and head. replace tile shower walls. tile bathroom floor. install led light fixture on ceiling. | $9,500 |
| Mar 9, 2016 | Completed final sign-off Apr 2016 | 445 Francisco St | build partition wall with pocket door, install 2 plugs and move heater. sprinkler permit to be seperate. n/a ordinance #155-13Details
build partition wall with pocket door, install 2 plugs and move heater. sprinkler permit to be seperate. n/a ordinance #155-13 | $4,200 |
| Mar 6, 2015 | Completed final sign-off Aug 2015 | 631 O'farrell St | unit #611: kitchen remodel include new cabinets, counter, tile floor, lighting, add new dishwasher and microwave hood. remove parting walls per plan. maher n/a.Details
unit #611: kitchen remodel include new cabinets, counter, tile floor, lighting, add new dishwasher and microwave hood. remove parting walls per plan. maher n/a. | $15,000 |
| May 20, 2014 | Completed final sign-off Aug 2014 | 60 Rausch St | remodel e bathroom and kitchen. extend e 1/2 bath to full bath. compliance with ordinance 155-13 not required.Details
remodel e bathroom and kitchen. extend e 1/2 bath to full bath. compliance with ordinance 155-13 not required. | $25,000 |
| Feb 14, 2014 | Completed final sign-off May 2014 | 838 Diamond St | exterior stair handrail remodel:cut down extg low conc. side walls and add new guard rail and hand rail. replace entry door, side lights and transom.Details
exterior stair handrail remodel:cut down extg low conc. side walls and add new guard rail and hand rail. replace entry door, side lights and transom. | $32,000 |
| May 24, 2013 | Completed final sign-off Sep 2013 | 85 Western Shore Ln | kitchen remodel - remove old cabinets, add lighting, countertop and update flooring. bathroom 1 - update flooring, install new vanity, new toilet and shower. bathroom 2 - remove rub, toilet, vanity and replace with new tub, shower vanity and toilet.Details
kitchen remodel - remove old cabinets, add lighting, countertop and update flooring. bathroom 1 - update flooring, install new vanity, new toilet and shower. bathroom 2 - remove rub, toilet, vanity and replace with new tub, shower vanity and toilet. | $60,000 |
| Mar 22, 2011 | Completed final sign-off Jul 2011 | 72 Elsie St | remodel kitchen & bathroom-finishes & fixtures, replace (e) single glazed windows with new dual glazed vinyl windows within (e) window opening. front windows replace with wood dual glazed double hung. upgrade electrical panel;front wins repl (e) wood with (n) wd dual glazed dble hungDetails
remodel kitchen & bathroom-finishes & fixtures, replace (e) single glazed windows with new dual glazed vinyl windows within (e) window opening. front windows replace with wood dual glazed double hung. upgrade electrical panel;front wins repl (e) wood with (n) wd dual glazed dble hung | $70,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 3435 24th St | unit #17-lath & plaster repair in apt #17 in living/bedroom closet.Details
unit #17-lath & plaster repair in apt #17 in living/bedroom closet. | $1,000 |
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 3435 24th St | to comply with nov# 201031425, instalation of frencg doors, jamb trim in existing framing on unit # 17 at 3rd floor.Details
to comply with nov# 201031425, instalation of frencg doors, jamb trim in existing framing on unit # 17 at 3rd floor. | $500 |
| Feb 2, 2009 | Completed final sign-off Mar 2009 | 67 Diamond St | cut attic access hole in ceiling of hallway 32"x36" opening at second floor. patch old access.Details
cut attic access hole in ceiling of hallway 32"x36" opening at second floor. patch old access. | $2,000 |