Permit GraphShortlistSan Francisco building permits since 2000

Klaus Stoermer Construction

Contractor license
905999
State license record
Based in
Novato
On San Francisco permits
Dec 2008 to Sep 2011
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllStairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 28, 2011Completed
final sign-off Oct 2011
2563 Gough Stsome dryrot on extg exterior rear stair system of the bldg needs to be repaired. the landings of the stairs need to have joists added to be 16" oc. replacing 16' 4x4 post, stairstringer, treads and joist of redwood structure. no alteration other than repair and treatment of dryrot and adding some
Details
Permit
201109285688
Status
complete
Filed
Sep 28, 2011
Permit issued
Sep 28, 2011
Final sign-off
Oct 5, 2011
Declared cost
$2,000
Address
2563 Gough St

some dryrot on extg exterior rear stair system of the bldg needs to be repaired. the landings of the stairs need to have joists added to be 16" oc. replacing 16' 4x4 post, stairstringer, treads and joist of redwood structure. no alteration other than repair and treatment of dryrot and adding some

Open the permit page

$2,000
Feb 18, 2009Completed
final sign-off Mar 2009
439 Lincoln Wyraise the foundation at the rear of west & east wall by 12" (foundation cap)
Details
Permit
200902182309
Status
complete
Filed
Feb 18, 2009
Permit issued
Feb 18, 2009
Final sign-off
Mar 27, 2009
Declared cost
$5,000
Address
439 Lincoln Wy

raise the foundation at the rear of west & east wall by 12" (foundation cap)

Open the permit page

$5,000
Dec 10, 2008Completed
final sign-off Apr 2009
439 Lincoln Wyremove lower level window on back wall of bldg, cap foundation 11 1/2" x 15' south wall, reframe as needed 2 x 6 plate, double rim joist 2 x 10 (add one), plywood inside, match existing siding outside.
Details
Permit
200812108235
Status
complete
Filed
Dec 10, 2008
Permit issued
Dec 11, 2008
Final sign-off
Apr 8, 2009
Declared cost
$6,000
Address
439 Lincoln Wy

remove lower level window on back wall of bldg, cap foundation 11 1/2" x 15' south wall, reframe as needed 2 x 6 plate, double rim joist 2 x 10 (add one), plywood inside, match existing siding outside.

Open the permit page

$6,000