Kl Construction Group
- Based in
- Daly City
- On San Francisco permits
- May 2013 to Sep 2026
- Last 24 months
- 9 permits filed
120 permits since 2000: 101 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 120.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | Completed final sign-off Sep 2026 | 149 Goethe St | refer to the complaint # 202658345 item #2. permit to check stove hood in kitchen.Details
refer to the complaint # 202658345 item #2. permit to check stove hood in kitchen. | $500 |
| Apr 20, 2026 | Completed final sign-off May 2026 | 2558 24th Av | repair at the front, replace some broken wood trims, install hardie board siding to cover the old siding at rear building. approx 1500sqft siding. apprx 2000 sqft of stuccoDetails
repair at the front, replace some broken wood trims, install hardie board siding to cover the old siding at rear building. approx 1500sqft siding. apprx 2000 sqft of stucco | $8,000 |
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 1615 20th St | change of use to: install appliances with new pre-manufactured electrical sauna.Details
change of use to: install appliances with new pre-manufactured electrical sauna. | $3,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 2130 Harrison St | recommencement and completion of work approved under pa#202010015693Details
recommencement and completion of work approved under pa#202010015693 | $25,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1563 43rd Av | revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures.Details
revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures. | $1,000 |
| Jun 6, 2025 | Completed final sign-off Feb 2026 | 1218 26th Av | units #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind.Details
units #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind. | $45,000 |
| Nov 15, 2024 | Completed final sign-off Oct 2025 | 123 Forest View Dr | revision to the permit#: 202206307440. relocation of laundry space and sink.Details
revision to the permit#: 202206307440. relocation of laundry space and sink. | |
| Oct 15, 2024 | Completed final sign-off Oct 2025 | 1563 43rd Av | remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs.Details
remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs. | $200,000 |
| Oct 9, 2024 | Completed final sign-off Oct 2025 | 1563 43rd Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Jul 17, 2024 | Completed final sign-off Feb 2025 | 489 18th Av | replace (8) windows in the front of the building (ebony clad outside). (aluminum clad wood, sh and fixed at the middle) . replace (2) windows at rear of the building. (vinyl windows)Details
replace (8) windows in the front of the building (ebony clad outside). (aluminum clad wood, sh and fixed at the middle) . replace (2) windows at rear of the building. (vinyl windows) | $9,000 |
| Jul 17, 2024 | Completed final sign-off Jul 2024 | 240 Cotter St | replace (6) windows at rear side. repair sheetrock and replacing interior. refinish hardwood floor.Details
replace (6) windows at rear side. repair sheetrock and replacing interior. refinish hardwood floor. | $10,000 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 736 Delano Av | comply with nov #202423957 repair front facade due to car damage. footing, put back steel column. replace 20 sq ft of stucco. replace garage door in kind. reconnect water pipeDetails
comply with nov #202423957 repair front facade due to car damage. footing, put back steel column. replace 20 sq ft of stucco. replace garage door in kind. reconnect water pipe | $32,000 |
| May 15, 2024 | Completed final sign-off Feb 2025 | 5522 California St | replace four windows at the back of the building (second floor) repaint insode and replace all hardwood floor.Details
replace four windows at the back of the building (second floor) repaint insode and replace all hardwood floor. | $10,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 215 Detroit St | to obtain final inspection for work approved under pa#: 9714787, 9810855, 200510276720. all work is completeDetails
to obtain final inspection for work approved under pa#: 9714787, 9810855, 200510276720. all work is complete | $5,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 215 Detroit St | to comply with physical inspection: cc- 8624Details
to comply with physical inspection: cc- 8624 | $5,000 |
| Oct 11, 2023 | Completed final sign-off Jun 2024 | 3515 20th St | remodel (e) service area at (e) restaurant at ground floor as per plan.Details
remodel (e) service area at (e) restaurant at ground floor as per plan. | $25,000 |
| Sep 6, 2023 | Completed final sign-off Feb 2024 | 3030 21st Av | replace some stucco (about 800 sq ft in kind) and repaint whole outside wall.Details
replace some stucco (about 800 sq ft in kind) and repaint whole outside wall. | $6,000 |
| Oct 19, 2022 | In progress issued Mar 2026 | 330 08th Av | two new accessory dwelling in 2nd floor, per ordinance 162-16Details
two new accessory dwelling in 2nd floor, per ordinance 162-16 | $100,000 |
| Sep 14, 2022 | Completed final sign-off Aug 2023 | 3025 21st Av | revision to 202110221022. add elevator and minor floor plan layout changeDetails
revision to 202110221022. add elevator and minor floor plan layout change | $30,000 |
| Jun 30, 2022 | Completed final sign-off Oct 2025 | 123 Forest View Dr | interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade.Details
interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade. | $80,000 |
| Apr 8, 2022 | Completed final sign-off Aug 2022 | 134 Parker Av | replace all windows in front. same size, use wood aluminum clad.Details
replace all windows in front. same size, use wood aluminum clad. | $5,000 |
| Apr 8, 2022 | Completed final sign-off Aug 2023 | 3025 21st Av | replace all stucco since leaking (replace in kind) for whole house.Details
replace all stucco since leaking (replace in kind) for whole house. | $20,000 |
| Jan 20, 2022 | Completed final sign-off Nov 2022 | 761 39th Av | 1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck.Details
1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck. | $120,000 |
| Nov 22, 2021 | Completed final sign-off Aug 2022 | 134 Parker Av | replace siding at rear of the building and repair dry rot roof at rear side. approx 600 sq ft area.Details
replace siding at rear of the building and repair dry rot roof at rear side. approx 600 sq ft area. | $10,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2022 | 446 Diamond St | convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.Details
convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route. | $20,000 |
| Oct 22, 2021 | Completed final sign-off Aug 2023 | 3025 21st Av | ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/woodDetails
ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/wood | $200,000 |
| Sep 16, 2021 | Expired or cancelled cancelled Dec 2023 | 901 Edinburgh St | replace all windows in front in kind. same size. 15pcs- repair leaking at rear wall. stucco (about 300sqft) aluminum to aluminum or wood aluminum clad within the existing openings - at the rear facade other products are allowed.Details
replace all windows in front in kind. same size. 15pcs- repair leaking at rear wall. stucco (about 300sqft) aluminum to aluminum or wood aluminum clad within the existing openings - at the rear facade other products are allowed. | $20,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of workDetails
revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of work | |
| Jun 17, 2021 | Completed final sign-off Oct 2021 | 1767 43rd Av | revision to app#201908290273: 1 new skylight. 2nd floor: reconfigure layout per plans. new powder room. 1st floor:reconfigure layout per plans. new wet bar.Details
revision to app#201908290273: 1 new skylight. 2nd floor: reconfigure layout per plans. new powder room. 1st floor:reconfigure layout per plans. new wet bar. | $5,000 |
| Apr 5, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | 2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding doorDetails
2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding door | $48,000 |
| Apr 1, 2021 | Completed final sign-off Nov 2021 | 33 Lee Av | new deck at rear and 1 sliding door. remove storage at rear.Details
new deck at rear and 1 sliding door. remove storage at rear. | $3,000 |
| Mar 19, 2021 | Completed final sign-off Apr 2021 | 1767 40th Av | 1st floor: replace insulation and sheetrock. new sheetrock in garage- 5/8 type "x" gyp bd. throughout ceiling and walls. r-19 ceiling insulation. nailing to be 10dc b oc edge nailing 1od@ 12" oc field. perimeter walls and ceiling,Details
1st floor: replace insulation and sheetrock. new sheetrock in garage- 5/8 type "x" gyp bd. throughout ceiling and walls. r-19 ceiling insulation. nailing to be 10dc b oc edge nailing 1od@ 12" oc field. perimeter walls and ceiling, | $3,000 |
| Mar 2, 2021 | Completed final sign-off Apr 2021 | 1767 40th Av | remodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout.Details
remodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout. | $18,000 |
| Feb 26, 2021 | Never finaled issued Feb 2021, no final | 2315 Divisadero St | remodel one full bathroom, one half bath (no removing walls)Details
remodel one full bathroom, one half bath (no removing walls) | $12,000 |
| Sep 12, 2020 | Completed final sign-off Feb 2021 | 3025 Ulloa St | replace interior staircaseDetails
replace interior staircase | $10,000 |
| Aug 25, 2020 | Completed final sign-off Aug 2022 | 134 Parker Av | construct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8').Details
construct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8'). | $180,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 3144 Clay St | remodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind.Details
remodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind. | $10,000 |
| Jun 10, 2020 | Completed final sign-off Jan 2021 | 33 Lee Av | replace existing siding (about 400 sq ft). repair leaking roof. all work in-kind.Details
replace existing siding (about 400 sq ft). repair leaking roof. all work in-kind. | $5,000 |
| Mar 16, 2020 | Completed final sign-off May 2020 | 638 26th Av | revision under pa #201907297167, 1. re-arrange plumbing fixtures for one bathrm, at 2nd fl. 2. arrange plumbing fixture for two bathrms at ground fl. 3. construct staircase to (e) deck at rear of building.Details
revision under pa #201907297167, 1. re-arrange plumbing fixtures for one bathrm, at 2nd fl. 2. arrange plumbing fixture for two bathrms at ground fl. 3. construct staircase to (e) deck at rear of building. | $2,500 |
| Feb 10, 2020 | Completed final sign-off Apr 2020 | 638 26th Av | reroofing in ref to pa#201907297167, other improvement related.Details
reroofing in ref to pa#201907297167, other improvement related. | $8,000 |
| Aug 26, 2019 | Expired or cancelled cancelled Nov 2019 | 216 Funston Av | repair damage siding on the side (about 100 sqft). less than 50% of facade.Details
repair damage siding on the side (about 100 sqft). less than 50% of facade. | $2,500 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 1991 21st Av | revisiojn to 201903185462. rearrange bathrm location at ground flr. rearrange kitchen, bathrm location & add 1 toilet rm at 2nd flrDetails
revisiojn to 201903185462. rearrange bathrm location at ground flr. rearrange kitchen, bathrm location & add 1 toilet rm at 2nd flr | $8,000 |
| Jul 29, 2019 | Completed final sign-off Apr 2020 | 638 26th Av | relocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/newDetails
relocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/new | $128,000 |
| May 14, 2019 | Completed final sign-off May 2019 | 849 26th Av | administrative permit to correct the descriptive for permit #201904026920. revision for the correct permit number #201810183602.Details
administrative permit to correct the descriptive for permit #201904026920. revision for the correct permit number #201810183602. | |
| Apr 2, 2019 | Completed final sign-off May 2019 | 849 26th Av | revision to app#201809190809. reconfigure layout per plans new windows at rear.Details
revision to app#201809190809. reconfigure layout per plans new windows at rear. | $600 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 1991 21st Av | construct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl.Details
construct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl. | $92,000 |
| Nov 2, 2018 | Completed final sign-off May 2019 | 1050 North Point St | unit 806: replace (e) kitchen cabinet, countertop & appliancesDetails
unit 806: replace (e) kitchen cabinet, countertop & appliances | $8,000 |
| Oct 18, 2018 | Completed final sign-off May 2019 | 849 26th Av | 1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs.Details
1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs. | $95,000 |
| Jun 26, 2018 | Completed final sign-off Jan 2021 | 1250 Eucalyptus Dr | demo permit to remove some sheetrock in bsmt. ref#201805250225 for renovation permit.Details
demo permit to remove some sheetrock in bsmt. ref#201805250225 for renovation permit. | $2,000 |
| Jun 26, 2018 | Completed final sign-off Sep 2018 | 674 10th Av | repair work for complain compliant #201866721.Details
repair work for complain compliant #201866721. | $2,500 |
| May 25, 2018 | Completed final sign-off Jan 2021 | 1250 Eucalyptus Dr | excavate below (e) west side of home to create nw living space (living rm, bedrm & bathrm); add (n) laundry rm adjacent to garage, (n) interior stairs from 1st to (n) basement floor level; replace (e) heating w/new hydronic in floor system. remove (e) masonry fireplace, replace w/gas fireplaceDetails
excavate below (e) west side of home to create nw living space (living rm, bedrm & bathrm); add (n) laundry rm adjacent to garage, (n) interior stairs from 1st to (n) basement floor level; replace (e) heating w/new hydronic in floor system. remove (e) masonry fireplace, replace w/gas fireplace | $150,000 |
| May 17, 2018 | Completed final sign-off May 2018 | 3535 Anza St | as built floor plans to approved application #201707263024. comply with complant #201713709Details
as built floor plans to approved application #201707263024. comply with complant #201713709 | |
| Apr 30, 2018 | Never finaled filed Apr 2018, never issued | 676 10th Av | addition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl.Details
addition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl. | $54,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 676 10th Av | relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl.Details
relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl. | $58,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 674 10th Av | relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl.Details
relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl. | $58,000 |
| Feb 14, 2018 | Completed final sign-off Mar 2018 | 676 10th Av | to comply with nov. #201723061 #2, #4, repair stair, touch up paint (less than 50%)Details
to comply with nov. #201723061 #2, #4, repair stair, touch up paint (less than 50%) | $1,000 |
| Feb 8, 2018 | Expired or cancelled cancelled Sep 2018 | 1506 39th Av | replace existing counter top and cabinet in the kitchen with new ones, same layout.Details
replace existing counter top and cabinet in the kitchen with new ones, same layout. | $5,000 |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 446 Diamond St | widen garage door 6" on each side maxDetails
widen garage door 6" on each side max | $6,000 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 754 20th Av | work on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundryDetails
work on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundry | $60,000 |
| Oct 3, 2017 | Completed final sign-off May 2019 | 754 20th Av | at 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14Details
at 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14 | $58,000 |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 1791 Green St | repair siding in lightwell about 200 sq ft and paint east wallDetails
repair siding in lightwell about 200 sq ft and paint east wall | $4,000 |
| Aug 30, 2017 | Completed final sign-off May 2018 | 2754 38th Av | 1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms.Details
1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms. | $60,000 |
| Jul 26, 2017 | Completed final sign-off May 2018 | 3535 Anza St | to comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be woodDetails
to comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be wood | $150,000 |
| Jul 14, 2017 | Completed final sign-off Sep 2018 | 1950 Gough St | remodel kitchen in kind. no walls moved, removed added or infilled. all existing layout to remain. all existing fire rated assemblies to be maintained.Details
remodel kitchen in kind. no walls moved, removed added or infilled. all existing layout to remain. all existing fire rated assemblies to be maintained. | $18,000 |
| Jul 14, 2017 | Completed final sign-off Sep 2017 | 491 Lakeshore Dr | replace some dryrot wood for the front deck. less than 40%.Details
replace some dryrot wood for the front deck. less than 40%. | $1,500 |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 42 Lakeview Av | remove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/fDetails
remove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/f | $58,000 |
| May 10, 2017 | Completed final sign-off May 2017 | 27 Roanoke St | install fence in back yard. notice of enforcement #2017-002372 (enf)Details
install fence in back yard. notice of enforcement #2017-002372 (enf) | $2,000 |
| May 5, 2017 | Completed final sign-off Jul 2017 | 3717 Webster St | revision to 201704133880 replace deck joistsDetails
revision to 201704133880 replace deck joists | $2,000 |
| May 1, 2017 | Completed final sign-off Apr 2019 | 124 Moffitt St | extend (e) bedroom & construct new 1 full bathroom. all work at ground floorDetails
extend (e) bedroom & construct new 1 full bathroom. all work at ground floor | $28,000 |
| Apr 13, 2017 | Completed final sign-off Jul 2017 | 3717 Webster St | remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace deckingDetails
remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace decking | $9,000 |
| Apr 7, 2017 | Completed final sign-off Mar 2019 | 3121 Ulloa St | unit legalization ordinance 43-14. legalization of unit installed without permit. legalize kitchen @ ground flr.Details
unit legalization ordinance 43-14. legalization of unit installed without permit. legalize kitchen @ ground flr. | $10,000 |
| Mar 22, 2017 | Completed final sign-off May 2018 | 3535 Anza St | repair some broken siding at rear side, approx 200 sf. replace in kind.Details
repair some broken siding at rear side, approx 200 sf. replace in kind. | $3,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2018 | 42 Lakeview Av | remodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout.Details
remodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout. | $18,000 |
| Oct 14, 2016 | Completed final sign-off Jul 2023 | 2272 Union St | partial foundation replacement at rear building approx. 60'-0".Details
partial foundation replacement at rear building approx. 60'-0". | $10,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2017 | 601 Van Ness Av | remodel one bathroom no structural workDetails
remodel one bathroom no structural work | $800 |
| Sep 16, 2016 | Completed final sign-off May 2017 | 1775 Green St | revision to app#201603162173 to reframe ceiling.Details
revision to app#201603162173 to reframe ceiling. | $2,000 |
| Sep 6, 2016 | Completed final sign-off Feb 2017 | 1884 Bush St | relocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count.Details
relocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count. | $20,000 |
| Sep 2, 2016 | Completed final sign-off Oct 2016 | 754 Monterey Bl | install plywood at garage wall. add one new post w/footing & replace one (e) 8x6 beam w/new in kind. all work at ground floor. (volunteer upgrade existing building).Details
install plywood at garage wall. add one new post w/footing & replace one (e) 8x6 beam w/new in kind. all work at ground floor. (volunteer upgrade existing building). | $9,000 |
| Jul 11, 2016 | Completed final sign-off Jul 2016 | 471 23rd Av | to comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1Details
to comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1 | $30,000 |
| May 26, 2016 | Completed final sign-off Sep 2016 | 27 Roanoke St | comply with complaint 201610011. minor revision to pa 2015-1030-1304 & strengthening/replaced (e) retaining wall at rear yard per plan.Details
comply with complaint 201610011. minor revision to pa 2015-1030-1304 & strengthening/replaced (e) retaining wall at rear yard per plan. | $5,000 |
| May 20, 2016 | Completed final sign-off Mar 2017 | 232 Guerrero St | revision to 2014 0721 1683: add skylight and change 2 windows to bay windows at rear of buildingDetails
revision to 2014 0721 1683: add skylight and change 2 windows to bay windows at rear of building | $6,000 |
| Apr 19, 2016 | Completed final sign-off Dec 2016 | 1421 Masonic Av | install shear wall plywood & moment frame, soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc, appendix a-4.Details
install shear wall plywood & moment frame, soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc, appendix a-4. | $59,000 |
| Mar 16, 2016 | Completed final sign-off May 2017 | 1775 Green St | revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure.Details
revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure. | $50,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 1177 California St | remodel (2) bathrooms, (1) laundry room; replace countertop.Details
remodel (2) bathrooms, (1) laundry room; replace countertop. | $18,000 |
| Mar 14, 2016 | Expired or cancelled cancelled Mar 2017 | 2240 Jackson St | replace cabinets & countertop for kitchen. compliance with maher ordinance no 155-13 not required.Details
replace cabinets & countertop for kitchen. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%)Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%) | $30,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | soft story retrofit per sfbc chapter 34b engineering criteria other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. | $60,000 |
| Nov 25, 2015 | Completed final sign-off Mar 2016 | 2 Fallon Pl | kitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer.Details
kitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer. | $10,000 |
| Oct 30, 2015 | Completed final sign-off Sep 2016 | 27 Roanoke St | 1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan.Details
1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan. | $86,300 |
| Oct 16, 2015 | Completed final sign-off Feb 2017 | 1773 Green St | revision to ref pa 201509086319: add powder room, remove walls at kitchenDetails
revision to ref pa 201509086319: add powder room, remove walls at kitchen | $25,000 |
| Sep 8, 2015 | Completed final sign-off Feb 2017 | 1773 Green St | remodel (e) kitchen & 2 bathrooms.Details
remodel (e) kitchen & 2 bathrooms. | $25,000 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 1727 34th Av | remodel kitchen and two bathrooms. no structural workDetails
remodel kitchen and two bathrooms. no structural work | $28,000 |
| Jul 15, 2015 | Completed final sign-off Sep 2015 | 1265 Jackson St | work refer to complaint 20153622,201555211,repair windows, paint front room & outside, fix lights at common area, fix broken plumbing pipes, all fire rated assembly shall be maintained.Details
work refer to complaint 20153622,201555211,repair windows, paint front room & outside, fix lights at common area, fix broken plumbing pipes, all fire rated assembly shall be maintained. | $4,000 |
| Jun 11, 2015 | Expired or cancelled cancelled Aug 2016 | 99 Merced Av | remodel one bathroom at second floor (no structural work). all work in-kind.Details
remodel one bathroom at second floor (no structural work). all work in-kind. | $9,000 |
| Jun 1, 2015 | Completed final sign-off Apr 2016 | 44 Parker Av | remodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgradesDetails
remodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgrades | $57,314 |
| Jun 1, 2015 | Expired or cancelled cancelled Jan 2017 | 46 Cook St | remodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basementDetails
remodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basement | $35,717 |
| Apr 27, 2015 | Completed final sign-off Aug 2015 | 446 Diamond St | revision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room.Details
revision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room. | |
| Apr 20, 2015 | Completed final sign-off Jul 2015 | 1047 Filbert St | remodel 2 bathrooms and one laundry room. no structure work.Details
remodel 2 bathrooms and one laundry room. no structure work. | $20,000 |
| Feb 18, 2015 | Expired or cancelled revoked May 2015 | 754 20th Av | removal of illegal unit in garage.Details
removal of illegal unit in garage. | $3,000 |
| Feb 10, 2015 | Completed final sign-off Feb 2017 | 1774 09th Av | work refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2.Details
work refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2. | $2,000 |