Kitchen Fantastic
- Based in
- Livermore
- On San Francisco permits
- May 2018 to Jun 2026
- Last 24 months
- 4 permits filed
22 permits since 2000: 14 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jun 2026 | 56 Merced Av | kitchen remodel & bathroom remodel x2, replace cabinets, counters, appliances, upgrade sub-panel, upgrade plumbing & electrical as needed for remodel. like for like remodel. kitchen approximately 191sf, bathroom 1 58sf, bathroom 2 40sfDetails
kitchen remodel & bathroom remodel x2, replace cabinets, counters, appliances, upgrade sub-panel, upgrade plumbing & electrical as needed for remodel. like for like remodel. kitchen approximately 191sf, bathroom 1 58sf, bathroom 2 40sf | $55,000 |
| Jan 26, 2026 | Completed final sign-off Jul 2026 | 1413 38th Av | demo and replace cabinets floors, countertops. kitchen remodel in kind. replace window like for like. install tamper resist. plugs. install dedicated circuit for appliances. install qled can lights. install earthquake shut off valve. relocate gas line.Details
demo and replace cabinets floors, countertops. kitchen remodel in kind. replace window like for like. install tamper resist. plugs. install dedicated circuit for appliances. install qled can lights. install earthquake shut off valve. relocate gas line. | $65,000 |
| Mar 25, 2025 | Completed final sign-off Aug 2025 | 2450 17th Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $40,000 |
| Dec 30, 2024 | Completed final sign-off Apr 2025 | 1047 Shrader St | bathroom remodel project inlcluding new radiant heat floors. no wall demolition or construction. no change in plumbing fixture count. replace cabinets, counters, fixtures. hoop up plumbing for vanity sink faucet, toilet and shower. install led can lights.Details
bathroom remodel project inlcluding new radiant heat floors. no wall demolition or construction. no change in plumbing fixture count. replace cabinets, counters, fixtures. hoop up plumbing for vanity sink faucet, toilet and shower. install led can lights. | $45,000 |
| Feb 22, 2024 | Completed final sign-off Jun 2024 | 1215 28th Av | (r) cabinets, countertops, & appliances. hook up plumbing sink faucet, disposal fridge&laundry. install title 24 compliant led can lights (17). ded. all appliance circutry as needed, install tamper resist plugs. 11ov/204 gfci splashcircut, install under cab lights. refresh vent exhaust hoodDetails
(r) cabinets, countertops, & appliances. hook up plumbing sink faucet, disposal fridge&laundry. install title 24 compliant led can lights (17). ded. all appliance circutry as needed, install tamper resist plugs. 11ov/204 gfci splashcircut, install under cab lights. refresh vent exhaust hood | $30,000 |
| Oct 19, 2023 | Completed final sign-off Jan 2024 | 1483 Funston Av | kitchen remodel- cabinets, counters, appliances, relocate plmg for sink, faucet, & disposal & fridge. install title 24 complient can lights, dedicate all appliances, circuits gfci splash. install under cab lght, install toe kick ltg, refresh ventilatio as needed for exhausthood, no removal of wallsDetails
kitchen remodel- cabinets, counters, appliances, relocate plmg for sink, faucet, & disposal & fridge. install title 24 complient can lights, dedicate all appliances, circuits gfci splash. install under cab lght, install toe kick ltg, refresh ventilatio as needed for exhausthood, no removal of walls | $35,000 |
| Oct 19, 2023 | Completed final sign-off Jan 2024 | 735 Mansell St | like for like kitchen. replace cabs, countertop appliances. hook up plmg for sink and faucet. dedicate all appliance circuit. refresh ventilation as needed. update extg sub panel for electrical breakers. no walll removalDetails
like for like kitchen. replace cabs, countertop appliances. hook up plmg for sink and faucet. dedicate all appliance circuit. refresh ventilation as needed. update extg sub panel for electrical breakers. no walll removal | $30,000 |
| Aug 30, 2023 | Completed final sign-off Oct 2023 | 180 Merced Av | kitchen remodel like for like no wall /window.door altrations, new cabinetsd counters appliances add outlets as needed to codeDetails
kitchen remodel like for like no wall /window.door altrations, new cabinetsd counters appliances add outlets as needed to code | $28,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 839 Sunnydale Av | kitchen remodel: replace cabinets, countertops, backsplash, and flooring in kitchen. refresh electrical, plumbing, and ventilation to code requirements.Details
kitchen remodel: replace cabinets, countertops, backsplash, and flooring in kitchen. refresh electrical, plumbing, and ventilation to code requirements. | $40,000 |
| May 19, 2022 | Completed final sign-off May 2023 | 885 Noriega St | kitchen remodel: replace cabinets, countertop, backsplash, and flooring. refresh electrical, plumbing, and ventilation to current ca state code.Details
kitchen remodel: replace cabinets, countertop, backsplash, and flooring. refresh electrical, plumbing, and ventilation to current ca state code. | $60,000 |
| Dec 1, 2021 | Never finaled issued Dec 2021, no final | 2128 North Point St | one kitchen remodel: install new cabinets, countertops, backsplash, laminate flooring. refresh plumbing, ventilation, dedicate circuitry as needed.Details
one kitchen remodel: install new cabinets, countertops, backsplash, laminate flooring. refresh plumbing, ventilation, dedicate circuitry as needed. | $35,000 |
| Dec 3, 2020 | Completed final sign-off Jun 2025 | 9 Las Villas Ct | kitchen remodel like for like. 5 led can lights, up date electrical, replace cabinets-counters-sink-appliancesDetails
kitchen remodel like for like. 5 led can lights, up date electrical, replace cabinets-counters-sink-appliances | $40,000 |
| Oct 6, 2020 | Never finaled issued Oct 2020, no final | 10 Talbert St | like for like kitchen remodel. new cabinets, counters, udate elec, plumb, mech as needed for current ca code. new led can lights and under cab lightsDetails
like for like kitchen remodel. new cabinets, counters, udate elec, plumb, mech as needed for current ca code. new led can lights and under cab lights | $35,000 |
| Sep 14, 2020 | Never finaled issued Sep 2020, no final | 1800 Washington St | like for like kitchen remodel non structural no window or door changes replace cabinets counters sink and udate elecDetails
like for like kitchen remodel non structural no window or door changes replace cabinets counters sink and udate elec | $18,000 |
| May 27, 2020 | Completed final sign-off Nov 2020 | 720 Chenery St | remove and replace all current cabinets and countertops. update electrical, plumbing, and mechanical as needed. replace cabinets and countertops with appliances staying in existing locations, new led can lights, new led undercabinet light. kitchen remodel in-kind.Details
remove and replace all current cabinets and countertops. update electrical, plumbing, and mechanical as needed. replace cabinets and countertops with appliances staying in existing locations, new led can lights, new led undercabinet light. kitchen remodel in-kind. | $45,000 |
| Mar 9, 2020 | Completed final sign-off Jul 2020 | 2133 San Jose Av | kitchen remodel in kind, everything in same locaiton.Details
kitchen remodel in kind, everything in same locaiton. | $22,000 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 2327 Turk Bl | remodel kitchen in kind. update electrical add 4 can lights, install new cabinets counter and flooring.Details
remodel kitchen in kind. update electrical add 4 can lights, install new cabinets counter and flooring. | $28,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 655 03rd St | work done in g/f common areas. replace cabinets in kitchenette, replace appliances w/dedicated circuits, refresh sink plumbing, install led can lights, replace toilets, refresh plumbing at bathrm sink, install led can lights in bathrm tile floors, wall tile in bathrm. no change of layout or stuctureDetails
work done in g/f common areas. replace cabinets in kitchenette, replace appliances w/dedicated circuits, refresh sink plumbing, install led can lights, replace toilets, refresh plumbing at bathrm sink, install led can lights in bathrm tile floors, wall tile in bathrm. no change of layout or stucture | $43,000 |
| Oct 15, 2019 | Expired or cancelled expired Jun 2024 | 1678 43rd Av | kitchen remodel - update elect5rical, hook up plumbing, install drywall, cabinets, counter, back splash appliancesDetails
kitchen remodel - update elect5rical, hook up plumbing, install drywall, cabinets, counter, back splash appliances | $30,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 74 Del Monte St | kitchen remodel - remove and replace cabinets, counters, appliances and flooring. update electrical to code, install title 24 can lights. only relocating refrigeratorDetails
kitchen remodel - remove and replace cabinets, counters, appliances and flooring. update electrical to code, install title 24 can lights. only relocating refrigerator | $35,000 |
| Oct 16, 2018 | Completed final sign-off Mar 2019 | 78 Chenery St | kitchen remodel - like, update electrical, run new gas line refresh plumbing, refresh, ventilation new hood connect existing duct. ass led lights highDetails
kitchen remodel - like, update electrical, run new gas line refresh plumbing, refresh, ventilation new hood connect existing duct. ass led lights high | $50,000 |
| May 24, 2018 | Never finaled issued May 2018, no final | 536 Ellsworth St | like for like kitchen remodel. replace cabinets, counters, appliances, flooring, title 24 can lighting update elecDetails
like for like kitchen remodel. replace cabinets, counters, appliances, flooring, title 24 can lighting update elec | $40,000 |