Kin Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Mar 2017
- Last 24 months
- 0 permits filed
12 permits since 2000: 11 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2017 | Completed final sign-off May 2017 | 745 08th Av | make bathrooms more accessible for a physically handicapped person. add a bathroom w/shower in (e) bedroom closet. replace (e) tall jacuzzi with short bathtub & repair bathroomDetails
make bathrooms more accessible for a physically handicapped person. add a bathroom w/shower in (e) bedroom closet. replace (e) tall jacuzzi with short bathtub & repair bathroom | $5,000 |
| Sep 4, 2015 | Completed final sign-off Nov 2015 | 165 Meadowbrook Dr | remodel kitchen/floor tils/countertop/ sink/replace windows not visible from street, u factor 0.32 max. no change to layout. no structural work.Details
remodel kitchen/floor tils/countertop/ sink/replace windows not visible from street, u factor 0.32 max. no change to layout. no structural work. | $15,000 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 1670 Bay St | kitchen remodel, change floor tiles, change countertop, sink, windows(x2), bath remodel, tile, shower remodel, change toilet and sinkDetails
kitchen remodel, change floor tiles, change countertop, sink, windows(x2), bath remodel, tile, shower remodel, change toilet and sink | $9,500 |
| Jan 4, 2012 | Completed final sign-off Aug 2012 | 1406 24th Av | 1st fl: improvement of existing space to have family room, bathroom, storage, furnaces in garage. 2nd fl: remodel kitchen and bath. 1/f wall in light well.Details
1st fl: improvement of existing space to have family room, bathroom, storage, furnaces in garage. 2nd fl: remodel kitchen and bath. 1/f wall in light well. | $53,000 |
| Jan 8, 2010 | Completed final sign-off Jul 2010 | 1434 16th Av | remodel kitchen & 1 bathroom on the top floor-kitchen: counter top, cabinets replacement. bathroom: replace plumbing fixtures & retile floors & walls, exhausts. min 50% kitchen light wattage must be of high efficiency lights. no adding or moving wallDetails
remodel kitchen & 1 bathroom on the top floor-kitchen: counter top, cabinets replacement. bathroom: replace plumbing fixtures & retile floors & walls, exhausts. min 50% kitchen light wattage must be of high efficiency lights. no adding or moving wall | $11,000 |
| Oct 28, 2009 | Completed final sign-off Feb 2010 | 546 20th Av | 1st floor-remove (e) furnaces & replace with new furnaces for bathroom units on 2nd floor. 2nd floor-remodel kitchn, bathroom, powder & laundry room. 3rd floor-no work to be doneDetails
1st floor-remove (e) furnaces & replace with new furnaces for bathroom units on 2nd floor. 2nd floor-remodel kitchn, bathroom, powder & laundry room. 3rd floor-no work to be done | $38,000 |
| Nov 17, 2008 | Completed final sign-off Feb 2009 | 501 29th Av | repair backdoor stair for existing residential building: repair stairway landing. total less 50% of stairway.Details
repair backdoor stair for existing residential building: repair stairway landing. total less 50% of stairway. | $2,800 |
| Nov 10, 2008 | Completed final sign-off Mar 2009 | 1260 46th Av | remove and replace tiles in bathroom/surround shower.Details
remove and replace tiles in bathroom/surround shower. | $2,000 |
| Jul 23, 2008 | Completed final sign-off Sep 2008 | 223 Maynard St | remove drywall on both side of the wall adjacent to the property line. install insulation & cover with new sheet rock. 2 bedroom, 1 living room. 100 sq. ft. of area to be replace.Details
remove drywall on both side of the wall adjacent to the property line. install insulation & cover with new sheet rock. 2 bedroom, 1 living room. 100 sq. ft. of area to be replace. | $3,000 |
| Nov 5, 2003 | Expired or cancelled expired Apr 2007 | 1253 Alemany Bl | insulation upper floor of house, ceiling r-30, wall r-13Details
insulation upper floor of house, ceiling r-30, wall r-13 | $1,000 |
| Sep 29, 2003 | Completed final sign-off Jan 2004 | 1253 Alemany Bl | replace the interior walls & ceilings with sheetrock & remodel the kitchen. sheetrock work to beDetails
replace the interior walls & ceilings with sheetrock & remodel the kitchen. sheetrock work to be | $18,000 |
| Sep 16, 2002 | Completed final sign-off Jun 2003 | 1982 43rd Av | add bedroom and bathroom on first floor.Details
add bedroom and bathroom on first floor. | $13,000 |