Kgpco Services Llc
- Based in
- Faribault
- On San Francisco permits
- Nov 2023 to Nov 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2023 | Completed final sign-off Jul 2024 | 333 Ofarrell St | t-mobile: removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans.Details
t-mobile: removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans. | $18,000 |
| Nov 28, 2023 | Completed final sign-off Oct 2024 | 100 Powell St | removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on ellis st. a traffic control plan is included in the plans.Details
removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on ellis st. a traffic control plan is included in the plans. | $18,000 |
| Nov 28, 2023 | Completed final sign-off Jun 2024 | 1580 Valencia St | removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans.Details
removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans. | $18,000 |