Kevin Cronin
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Apr 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2012 | Completed final sign-off Aug 2012 | 2670 44th Av | demo interior or bathroom to studs. replace existing concrete floor and underground plumbing with new concrete. move plumbing and elec. new drywall and tile. new shower, sinks, toilet, trim and paint. new radiant floor heatDetails
demo interior or bathroom to studs. replace existing concrete floor and underground plumbing with new concrete. move plumbing and elec. new drywall and tile. new shower, sinks, toilet, trim and paint. new radiant floor heat | $15,325 |
| Jun 10, 2010 | Completed final sign-off Jun 2010 | 2670 44th Av | replace 3 existing windows, 2 windows at front and 1 at rearDetails
replace 3 existing windows, 2 windows at front and 1 at rear | $3,500 |