Kent Taylor Construction
- Based in
- Richmond
- On San Francisco permits
- Jun 2001 to Mar 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2017 | Completed final sign-off Feb 2018 | 2212 23rd St | rear bldg kitchen and bathroom remodel - replace fictures, appliances and finishes, same location, in kind. remove non structural fridge enclosure walls. remove ply/gyp non structural wall @ w/d add closet to 2 bedrooms.Details
rear bldg kitchen and bathroom remodel - replace fictures, appliances and finishes, same location, in kind. remove non structural fridge enclosure walls. remove ply/gyp non structural wall @ w/d add closet to 2 bedrooms. | $15,000 |
| Jun 22, 2001 | Completed final sign-off Nov 2001 | 1966 Pacific Av | remodel kitchen-no structural work to be doneDetails
remodel kitchen-no structural work to be done | $7,500 |