Kelton Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Nov 2017
- Last 24 months
- 0 permits filed
138 permits since 2000: 115 completed, 12 never finaled, 11 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 138.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2017 | Completed final sign-off Dec 2017 | 155 Westwood Dr | voluntary cripple wall upgrade, install anchor bolts in (e) perimeter foudnation 5/8 threaded rod ,epoxy set (xp22) w/3" square washers @4 spacing & 7"min imbedment. install plywood stiffenix panels on accesible cripple walls panels to be 1/2 cdx str 1 ply edges blocked&nailed 10d @ 3" fld nld at 12Details
voluntary cripple wall upgrade, install anchor bolts in (e) perimeter foudnation 5/8 threaded rod ,epoxy set (xp22) w/3" square washers @4 spacing & 7"min imbedment. install plywood stiffenix panels on accesible cripple walls panels to be 1/2 cdx str 1 ply edges blocked&nailed 10d @ 3" fld nld at 12 | $10,000 |
| Oct 17, 2017 | Completed final sign-off Nov 2017 | 2531 Gough St | correct bsmnt water intrusion. cut and patch siding as needed along about 12 feet of left side wall at rear to remove debris from between houses, and regrade this space for better drainage to rear yard. not visible from street.Details
correct bsmnt water intrusion. cut and patch siding as needed along about 12 feet of left side wall at rear to remove debris from between houses, and regrade this space for better drainage to rear yard. not visible from street. | $2,500 |
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 731 Avalon Av | voluntary cripple-wall upgrade: install 5/8" anchor bolts at 4' spacing in e fndn: simpson set-epoxy-set with 8" min imbed and 4" square washers. install plywood stiffening panels at building corners: 1/2 cdx ply, edges blocked and nialed 10d common @ 4", 12" fieldDetails
voluntary cripple-wall upgrade: install 5/8" anchor bolts at 4' spacing in e fndn: simpson set-epoxy-set with 8" min imbed and 4" square washers. install plywood stiffening panels at building corners: 1/2 cdx ply, edges blocked and nialed 10d common @ 4", 12" field | $8,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2016 | 207 Bennington St | six wood double hung windows visible from street. repair existing or replace in-kind.Details
six wood double hung windows visible from street. repair existing or replace in-kind. | $1,000 |
| Apr 7, 2016 | Completed final sign-off Apr 2016 | 205 Bennington St | to obtian a final inspection for work approved under pa# 200701101421, all work is completeDetails
to obtian a final inspection for work approved under pa# 200701101421, all work is complete | |
| Nov 19, 2015 | Completed final sign-off Feb 2016 | 1139 Athens St | replace deteriorated shower stall in ground floor bath.Details
replace deteriorated shower stall in ground floor bath. | $2,500 |
| Sep 10, 2015 | Completed final sign-off Nov 2015 | 1869 California St | revision to pa 2015 0716 1699; revise underpinning. maher naDetails
revision to pa 2015 0716 1699; revise underpinning. maher na | |
| Jul 16, 2015 | Completed final sign-off Nov 2015 | 1869 California St | soft-story retrofit per the 2010 2012 iebc appendix a-4. compliance with maher ordinance no 155-13 not required.Details
soft-story retrofit per the 2010 2012 iebc appendix a-4. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Apr 16, 2015 | Completed final sign-off Aug 2015 | 1034 14th St | soft storey upgrade: seismic retrofit in accordance with 2013 cebc appendix xhapter a4 & to comply with sf ord. 66-13: mandatory seismic retrofit program for wood framed bldgs. as per plans by thor matteson dated 4/16/15Details
soft storey upgrade: seismic retrofit in accordance with 2013 cebc appendix xhapter a4 & to comply with sf ord. 66-13: mandatory seismic retrofit program for wood framed bldgs. as per plans by thor matteson dated 4/16/15 | $67,000 |
| Apr 13, 2015 | Never finaled filed Apr 2015, never issued | 1034 14th St | mandatory soft story upgrade per sf ord 66-13 per plans by thor matterson dated 4/10/15. 2012 iebc appendix a-4Details
mandatory soft story upgrade per sf ord 66-13 per plans by thor matterson dated 4/10/15. 2012 iebc appendix a-4 | $50,000 |
| Mar 3, 2015 | Completed final sign-off Mar 2015 | 431 Bosworth St | cripple wall retrofit. install epoxy-set anchor bolts in perimeter foundation at 4' spacing. 5/8" bolts w/ 3"x1/4" sq washers & 7"min. imbedment. install plywood stiffing panels on accessible bsmt walls. 1/2 cdx strl ply nailed 10d @ panel edges & 6" sds screws thru top plates into joists above.Details
cripple wall retrofit. install epoxy-set anchor bolts in perimeter foundation at 4' spacing. 5/8" bolts w/ 3"x1/4" sq washers & 7"min. imbedment. install plywood stiffing panels on accessible bsmt walls. 1/2 cdx strl ply nailed 10d @ panel edges & 6" sds screws thru top plates into joists above. | $10,000 |
| Feb 17, 2015 | Completed final sign-off May 2015 | 231 Divisadero St | replace front steps and retaining walls per plan. no architectural changesDetails
replace front steps and retaining walls per plan. no architectural changes | $25,000 |
| Sep 29, 2014 | Completed final sign-off Dec 2014 | 2045 Hayes St | soft story retrofit per sfbc chapter 34b, asce 7-10.Details
soft story retrofit per sfbc chapter 34b, asce 7-10. | $50,000 |
| Sep 11, 2014 | Completed final sign-off Apr 2015 | 293 Chenery St | remodel kitchen on the main floor, install new bath on the lower floor.Details
remodel kitchen on the main floor, install new bath on the lower floor. | $100,000 |
| Jul 10, 2014 | Completed final sign-off Aug 2014 | 618 12th Av | cripple wall retrofitDetails
cripple wall retrofit | $10,000 |
| Jun 6, 2014 | Completed final sign-off Aug 2014 | 30 Broadmoor Dr | voluntary strenthening per plans by thor matteson dated 2/12/14Details
voluntary strenthening per plans by thor matteson dated 2/12/14 | $50,000 |
| Mar 4, 2014 | Completed final sign-off Apr 2015 | 961 Church St | south property line wall above neighbor's roof. remove deteriorated wood shingle siding (150 sf); install 5/8" gyp sheath, tyvec wrap and wood rustic siding with flashing as needed.Details
south property line wall above neighbor's roof. remove deteriorated wood shingle siding (150 sf); install 5/8" gyp sheath, tyvec wrap and wood rustic siding with flashing as needed. | $7,500 |
| Mar 4, 2014 | Completed final sign-off Apr 2015 | 967 Church St | strap and anchor post and beam connections in garage and rear rooms with various simpson strong productsDetails
strap and anchor post and beam connections in garage and rear rooms with various simpson strong products | $5,000 |
| Jan 30, 2014 | Completed final sign-off Mar 2014 | 148 Laidley St | cripple - wall retrofit - total more or less lf. install 5/8" anchors w/ 8" min. embed. @4' opening. install 1/2" cdx stifening panels on front wall.Details
cripple - wall retrofit - total more or less lf. install 5/8" anchors w/ 8" min. embed. @4' opening. install 1/2" cdx stifening panels on front wall. | $4,200 |
| Jan 30, 2014 | Completed final sign-off Jun 2014 | 932 Page St | voluntary strengthening as per plan. compliance with ordinance #155-13 not required.Details
voluntary strengthening as per plan. compliance with ordinance #155-13 not required. | $19,500 |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 961 Church St | construct new dwelling unit in (e) basement space, about 600 sq. ft. with living room, one bedroom, and one bath, one kitchen and a small rear deck.Details
construct new dwelling unit in (e) basement space, about 600 sq. ft. with living room, one bedroom, and one bath, one kitchen and a small rear deck. | $150,000 |
| Oct 30, 2013 | Completed final sign-off Jan 2014 | 207 Bennington St | replace deteriorated existing back door in kind not visable from frontDetails
replace deteriorated existing back door in kind not visable from front | $500 |
| Apr 30, 2013 | Completed final sign-off Jul 2013 | 60 Central Av | replace one sections of brick foundation with reinfornced concrete foundatoin. replace rotten wood framing.cap and repair one section of extg brick foundation.Details
replace one sections of brick foundation with reinfornced concrete foundatoin. replace rotten wood framing.cap and repair one section of extg brick foundation. | $20,000 |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 60 Central Av | voluntary anchor bolt retrofit. install anchor bolts at 4' intervals in existing masonry perimeter foundation. anchors to be 5/8"x12" threadered rod with 3" square washers, epoxy set with 8" imbedment minimum. construct plywood stiffenings panels on existing basement walls. panels to be 1/2" cdxDetails
voluntary anchor bolt retrofit. install anchor bolts at 4' intervals in existing masonry perimeter foundation. anchors to be 5/8"x12" threadered rod with 3" square washers, epoxy set with 8" imbedment minimum. construct plywood stiffenings panels on existing basement walls. panels to be 1/2" cdx | $19,000 |
| Mar 25, 2013 | Completed final sign-off May 2013 | 330 Sanchez St | build concrete grade beam and install 2 simpson strong walls. install 4x8 wood beam connecting strong walls to extg joist. all voluntary work.Details
build concrete grade beam and install 2 simpson strong walls. install 4x8 wood beam connecting strong walls to extg joist. all voluntary work. | $10,000 |
| Feb 21, 2013 | Completed final sign-off Mar 2013 | 330 Sanchez St | retrofit- instlal anchor bolts @4" sparing in e. foundations, 5/8" thr. epoxy set 8" inbed w/3"x 1/2" washers install plywood stffeing panels on accessible bsmt walls 1/2 cdx stri edges blocked & nailed 10 @3" (all voluntary work)Details
retrofit- instlal anchor bolts @4" sparing in e. foundations, 5/8" thr. epoxy set 8" inbed w/3"x 1/2" washers install plywood stffeing panels on accessible bsmt walls 1/2 cdx stri edges blocked & nailed 10 @3" (all voluntary work) | $15,000 |
| Jun 29, 2012 | Completed final sign-off Nov 2012 | 1840 Green St | structural strengthening. install steel frame & plywood panel as shown on plan.Details
structural strengthening. install steel frame & plywood panel as shown on plan. | $50,000 |
| May 30, 2012 | Completed final sign-off Jun 2012 | 1495 Monterey Bl | anchor bolt retrofit, 5/8" threaded rod, epoxy-set @ 4' spacing, 7" min. imbedment, 3"x1/4" sq. washers.Details
anchor bolt retrofit, 5/8" threaded rod, epoxy-set @ 4' spacing, 7" min. imbedment, 3"x1/4" sq. washers. | $5,000 |
| Apr 17, 2012 | Completed final sign-off Apr 2012 | 467 Guerrero St | install anchorbolts at 4' intervals in (e) perimeter foundation. anchors to be 5/8" x 12" threaded rod with 3"x1/4" square washers, epoxy set with 7" embedment minimum. voluntary anchorbolt retrofit.Details
install anchorbolts at 4' intervals in (e) perimeter foundation. anchors to be 5/8" x 12" threaded rod with 3"x1/4" square washers, epoxy set with 7" embedment minimum. voluntary anchorbolt retrofit. | $3,200 |
| Apr 17, 2012 | Completed final sign-off Jun 2012 | 1869 California St | voluntary anchorbolt retrofit. install anchorbolts at 4' intervals in (e) perimeter foundation. anchors to be 5/8" x 12" threaded rod with 2" square washers, epoxy set with 7" embedment minimum. construct plywood stiffening panels on (e) basement walls. panels to be 1/2 cdx plywood, nailed 1od @Details
voluntary anchorbolt retrofit. install anchorbolts at 4' intervals in (e) perimeter foundation. anchors to be 5/8" x 12" threaded rod with 2" square washers, epoxy set with 7" embedment minimum. construct plywood stiffening panels on (e) basement walls. panels to be 1/2 cdx plywood, nailed 1od @ | $30,000 |
| Mar 30, 2012 | Completed final sign-off Apr 2012 | 1079 Church St | voluntary anchor bolt retrofit: install anchor bolts at 4' intervals in existing perimeter foundation. anchors to be 5/8"x12" thread rod with 3" sqaure washer, epoxy-set with 7" embedment minimum. construct plywood stiffening panels on accesbile basement walls. panel to be 1/2"cdxplywood. nailed 10Details
voluntary anchor bolt retrofit: install anchor bolts at 4' intervals in existing perimeter foundation. anchors to be 5/8"x12" thread rod with 3" sqaure washer, epoxy-set with 7" embedment minimum. construct plywood stiffening panels on accesbile basement walls. panel to be 1/2"cdxplywood. nailed 10 | $10,000 |
| Jan 19, 2012 | Never finaled issued Jan 2012, no final | 40 Laidley St | addition of bath to lower level.Details
addition of bath to lower level. | $15,000 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 40 Laidley St | remodel lower level by lowering rear half of floor. extend stairs new footings at rear half of building and new shearwalls on lower levelDetails
remodel lower level by lowering rear half of floor. extend stairs new footings at rear half of building and new shearwalls on lower level | $95,000 |
| Nov 14, 2011 | Completed final sign-off Nov 2011 | 274 Joost Av | voluntary anchorbolt retrofit. upgrade (e) 1/2" original anchor bolts with 3" square wsshers. install additional 5/8" epoxy-set anchor bolts as needed with 8" min. imbedment . construct plywood stiffening panels on three (e) basement walls.Details
voluntary anchorbolt retrofit. upgrade (e) 1/2" original anchor bolts with 3" square wsshers. install additional 5/8" epoxy-set anchor bolts as needed with 8" min. imbedment . construct plywood stiffening panels on three (e) basement walls. | $3,500 |
| Jun 13, 2011 | Completed final sign-off Jul 2011 | 3629 Vicente St | replace about 45' of right side and rear foundation (partial foundation replacement) as per plans.Details
replace about 45' of right side and rear foundation (partial foundation replacement) as per plans. | $15,000 |
| May 5, 2011 | Completed final sign-off Jul 2011 | 5428 Anza St | perform rot repairs to 3 front & side bay windows as per lingruen termit report #56920-s1 dated 3/25/11Details
perform rot repairs to 3 front & side bay windows as per lingruen termit report #56920-s1 dated 3/25/11 | $20,000 |
| May 5, 2011 | Completed final sign-off Jun 2011 | 5415 Anza St | install 5/8" epoxy-set anchor bolts in existing perimeter foundation with 8" min. imbedment & 3" square washers. install plywood stiffening panels on available basement walls, using 1/2" cdx with edges blocked & nailed 10d @4"Details
install 5/8" epoxy-set anchor bolts in existing perimeter foundation with 8" min. imbedment & 3" square washers. install plywood stiffening panels on available basement walls, using 1/2" cdx with edges blocked & nailed 10d @4" | $8,000 |
| Dec 27, 2010 | Completed final sign-off Jan 2011 | 147 Clipper St | install 5/8" epoxy set anchor bolts in extg perimeter foundation at 4' spacing. anchor to be 5/8x12" threaded pop with 3" square washers with 7" embedment minumum construct 5 plywood stiffening panels on extg basement wall framing. 1/2 cdx plywood, eddes blocked,nailed 10 d at 3"Details
install 5/8" epoxy set anchor bolts in extg perimeter foundation at 4' spacing. anchor to be 5/8x12" threaded pop with 3" square washers with 7" embedment minumum construct 5 plywood stiffening panels on extg basement wall framing. 1/2 cdx plywood, eddes blocked,nailed 10 d at 3" | $5,500 |
| Oct 8, 2010 | Completed final sign-off Jul 2013 | 507 Cole St | foundation replacement. removal of (e) foundation and cripple wall. installation of reinforced concrete foundation, grade beams, stru steel, plywood shear walls, and wood frame ext.wall.Details
foundation replacement. removal of (e) foundation and cripple wall. installation of reinforced concrete foundation, grade beams, stru steel, plywood shear walls, and wood frame ext.wall. | $110,000 |
| Aug 16, 2010 | Never finaled issued Aug 2010, no final | 975 Monterey Bl | install anchor bolts in accessible basement foundtaion, 5/8" x12" threaded rod, epoxy-set @ 4' spacing with 1/4"x3" square washer, install plywood stiffening panels on accessible basement walls 1/2" cdx with 108 @3"Details
install anchor bolts in accessible basement foundtaion, 5/8" x12" threaded rod, epoxy-set @ 4' spacing with 1/4"x3" square washer, install plywood stiffening panels on accessible basement walls 1/2" cdx with 108 @3" | $4,200 |
| Aug 3, 2010 | Completed final sign-off Aug 2010 | 1055 Shotwell St | optional anchor bolt retrofit, install 5/8x12" threaded rod epoxy set w/3" square wasers at 4' spacing in existing perimeter foundation, install plywood stiffening panels on all 4 basement walls, 1/2" cdx plywood w/10d edge nailing at 3" & 12" field nailing, 6" sds screws at 8" to joists above.Details
optional anchor bolt retrofit, install 5/8x12" threaded rod epoxy set w/3" square wasers at 4' spacing in existing perimeter foundation, install plywood stiffening panels on all 4 basement walls, 1/2" cdx plywood w/10d edge nailing at 3" & 12" field nailing, 6" sds screws at 8" to joists above. | $3,000 |
| Mar 3, 2010 | Completed final sign-off Jun 2010 | 2214 14th Av | seismic improvement to unreinforced masonry walls within garage.Details
seismic improvement to unreinforced masonry walls within garage. | $40,000 |
| Dec 18, 2009 | Completed final sign-off Jan 2010 | 123 Faith St | repair rear patio: replace sunroom rear footings & beam.Details
repair rear patio: replace sunroom rear footings & beam. | $8,000 |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 518 Oak St | replace existing post and peir support below rear roomDetails
replace existing post and peir support below rear room | $5,000 |
| Nov 17, 2009 | Expired or cancelled expired May 2013 | 518 Oak St | various exterior repairs as per termite reprt #54427 from lingruen assocaites dated 10-16-09Details
various exterior repairs as per termite reprt #54427 from lingruen assocaites dated 10-16-09 | $5,000 |
| Sep 10, 2009 | Completed final sign-off Jul 2010 | 70 Buena Vista Tr | temporary shoring for installation of new 2 car garage approved under pa# 2009.03.17.4295Details
temporary shoring for installation of new 2 car garage approved under pa# 2009.03.17.4295 | $20,000 |
| Sep 10, 2009 | Completed final sign-off Oct 2009 | 115 Mendosa Av | voluntary seismic upgrade on first floor and sub basement onlyDetails
voluntary seismic upgrade on first floor and sub basement only | $15,000 |
| Aug 18, 2009 | Completed final sign-off Aug 2009 | 1920 Filbert St | install anchor bolts at 4' intervals in (e) perimeter foundation. anchor to be 5/8" x 12" threaded-rod with 3"x1/4 square washers x 1/2" epoxyset with 10" minimun imbedment. building size 60'x30'. bolts are drilled &Details
install anchor bolts at 4' intervals in (e) perimeter foundation. anchor to be 5/8" x 12" threaded-rod with 3"x1/4 square washers x 1/2" epoxyset with 10" minimun imbedment. building size 60'x30'. bolts are drilled & | $3,500 |
| Jun 29, 2009 | Completed final sign-off Jul 2009 | 408 Roosevelt Wy | woluntair anchorbolt retrofit: install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x12" threaded or with 2" square washers, epoxy set with 7" embedment minumum. construct plywood stiffening panels on existing basment walls, panels to be 1/2 cdx plywood, nailedDetails
woluntair anchorbolt retrofit: install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x12" threaded or with 2" square washers, epoxy set with 7" embedment minumum. construct plywood stiffening panels on existing basment walls, panels to be 1/2 cdx plywood, nailed | $4,500 |
| May 6, 2009 | Never finaled issued May 2009, no final | 663 45th Av | replace 25' of rear 6' tall wood fence, including 24" high concrete bulk head. (not to exceed 4' high, including footing).Details
replace 25' of rear 6' tall wood fence, including 24" high concrete bulk head. (not to exceed 4' high, including footing). | $2,000 |
| Mar 17, 2009 | Completed final sign-off Jul 2010 | 70 Buena Vista Tr | new basement level 2 car garage in front yard; new roof deck. new curb cut.Details
new basement level 2 car garage in front yard; new roof deck. new curb cut. | $75,000 |
| Feb 17, 2009 | Completed final sign-off Mar 2009 | 662 46th Av | rot repair: remove about 80 sf stucco in right front corner, repair deteriorated corner framing, patch stucco.Details
rot repair: remove about 80 sf stucco in right front corner, repair deteriorated corner framing, patch stucco. | $4,000 |
| Jan 28, 2009 | Completed final sign-off Feb 2009 | 662 46th Av | install anchor bolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod with 2" square wasers epoxy set with 7" imbedment minimum. construct plywood stiffenino panels on existin basement walls. panels to be 1/2" cdx plywood, nailed 10 d @ 3" edge & 6" in fieldDetails
install anchor bolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod with 2" square wasers epoxy set with 7" imbedment minimum. construct plywood stiffenino panels on existin basement walls. panels to be 1/2" cdx plywood, nailed 10 d @ 3" edge & 6" in field | $9,000 |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 743 Baker St | upgrade basement center beam support system with new concrete footings and replacement of one beam. extg post locations to remainDetails
upgrade basement center beam support system with new concrete footings and replacement of one beam. extg post locations to remain | $15,000 |
| Nov 25, 2008 | Completed final sign-off Jan 2009 | 31 Winfield St | revision to pa# 208/11/12/6415. additional structural detail.Details
revision to pa# 208/11/12/6415. additional structural detail. | |
| Nov 12, 2008 | Completed final sign-off Jan 2009 | 31 Winfield St | revision to pa #200811035735, substitute new foundation for cap & repair.Details
revision to pa #200811035735, substitute new foundation for cap & repair. | $20,000 |
| Nov 3, 2008 | Completed final sign-off Jan 2009 | 31 Winfield St | correct faulty grades at side & rear by capping 60 linear feet of side and rear foundations, and replacing damaged framing using new pressure treated lumber & hd alvanized nails & hardward.Details
correct faulty grades at side & rear by capping 60 linear feet of side and rear foundations, and replacing damaged framing using new pressure treated lumber & hd alvanized nails & hardward. | $10,000 |
| Oct 31, 2008 | Expired or cancelled cancelled Aug 2022 | 31 Winfield St | to complete work at pa 200801172779Details
to complete work at pa 200801172779 | $2,000 |
| Sep 26, 2008 | Never finaled issued Sep 2008, no final | 2422 Fulton St | install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod with 3" square wasers epoxy. set with 7" imbedment minumum construct plywood stiffening panel on existing accesible basement walls. panels to be 1/2 cdx plywood, nailed 10d @ 3" with holdDetails
install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod with 3" square wasers epoxy. set with 7" imbedment minumum construct plywood stiffening panel on existing accesible basement walls. panels to be 1/2 cdx plywood, nailed 10d @ 3" with hold | $9,000 |
| Sep 22, 2008 | Completed final sign-off Nov 2008 | 489 44th Av | install anchorblots at 4' intervals in existing perimeter foundation. anchors to be 5/8"x12" threaded rod with 3" x 3/16 square washers, epoxy set with 7" embedment minimum.Details
install anchorblots at 4' intervals in existing perimeter foundation. anchors to be 5/8"x12" threaded rod with 3" x 3/16 square washers, epoxy set with 7" embedment minimum. | $5,000 |
| Aug 25, 2008 | Completed final sign-off Sep 2008 | 708 03rd Av | install anchor bolts at 4" intevals in existing perimeter foundation. anchors to be 5/8" x 12" threded rod with 2" square washers epoxy set with 7" embedment minimum. approx 35 to 40 anchors total.Details
install anchor bolts at 4" intevals in existing perimeter foundation. anchors to be 5/8" x 12" threded rod with 2" square washers epoxy set with 7" embedment minimum. approx 35 to 40 anchors total. | $1,500 |
| May 1, 2008 | Completed final sign-off Jul 2008 | 746 39th Av | voluntary structural strengthening upgrade. install anchor bolts, shear walls, 2 grade beams w/shear walls. relocate door opening.Details
voluntary structural strengthening upgrade. install anchor bolts, shear walls, 2 grade beams w/shear walls. relocate door opening. | $20,000 |
| Feb 12, 2008 | Completed final sign-off Feb 2008 | 2101 Anza St | install anchbolts in (e) perimeter foundation: 5/8x12" threaded rod anchors with 2"x1/4" sq washers epoxy set at 4' intervalsDetails
install anchbolts in (e) perimeter foundation: 5/8x12" threaded rod anchors with 2"x1/4" sq washers epoxy set at 4' intervals | $2,500 |
| Feb 12, 2008 | Completed final sign-off Feb 2008 | 1482 29th Av | install anchor bolts in (e) perimeter foundation: 5/8x12" threaded rod anchors with 3"x1/4" sq washers epoxy set at 4" intervalsDetails
install anchor bolts in (e) perimeter foundation: 5/8x12" threaded rod anchors with 3"x1/4" sq washers epoxy set at 4" intervals | $2,500 |
| Jan 29, 2008 | Completed final sign-off Feb 2008 | 174 Hancock St | install anchor bolts at 4' intervals in existing perimter foundation. anchors to be 5/8" x 12" threaded rod with 2" square washers, epoxy set with 7 " embedment min. construct plywood stiffening panels on existing basement walls. panels to be 1/2 " cdc plywood, nailed 10 d @3" on all edges.voluntaryDetails
install anchor bolts at 4' intervals in existing perimter foundation. anchors to be 5/8" x 12" threaded rod with 2" square washers, epoxy set with 7 " embedment min. construct plywood stiffening panels on existing basement walls. panels to be 1/2 " cdc plywood, nailed 10 d @3" on all edges.voluntary | $4,000 |
| Jan 29, 2008 | Completed final sign-off Apr 2008 | 1632 Fulton St | renew permit #200505313730 to comply work.Details
renew permit #200505313730 to comply work. | |
| Dec 27, 2007 | Completed final sign-off Apr 2008 | 215 27th St | isntall new wood double hung windows in bldg frontDetails
isntall new wood double hung windows in bldg front | $20,000 |
| Dec 19, 2007 | Completed final sign-off Apr 2008 | 1567 Francisco St | reinforce connections on existing beam to comply with 3r report itemes 5-6 only dated 7/9/07Details
reinforce connections on existing beam to comply with 3r report itemes 5-6 only dated 7/9/07 | $4,200 |
| Dec 19, 2007 | Completed final sign-off Mar 2008 | 1 Romain St | voluntary structural strengthening, adding plywood to existing wall at lower story, install anchor bolts, repair dry rot (small area), concrete footing (new). all work done within property line.Details
voluntary structural strengthening, adding plywood to existing wall at lower story, install anchor bolts, repair dry rot (small area), concrete footing (new). all work done within property line. | $28,000 |
| Nov 14, 2007 | Completed final sign-off Dec 2007 | 625 06th Av | install anchorbolts at 4'intervals in extg permeter foundation.anchores to be 5/8x12" threaded rod with 2" sq. apoxy set with 7" embedment min. constract plywood stiffening panel on extg basement walls. panels to be 1/2 cdx plywood nailed 10d at 3" on all edges. voluntary strenghthingDetails
install anchorbolts at 4'intervals in extg permeter foundation.anchores to be 5/8x12" threaded rod with 2" sq. apoxy set with 7" embedment min. constract plywood stiffening panel on extg basement walls. panels to be 1/2 cdx plywood nailed 10d at 3" on all edges. voluntary strenghthing | $10,000 |
| Sep 17, 2007 | Completed final sign-off Apr 2008 | 215 27th St | remodel upper apt kitchen and remove 2 walls (bearing). construct non stairs form upper apt to garage. close off lower apt. center vestible with 2 walls to block stair and garage access.Details
remodel upper apt kitchen and remove 2 walls (bearing). construct non stairs form upper apt to garage. close off lower apt. center vestible with 2 walls to block stair and garage access. | $75,000 |
| Sep 10, 2007 | Completed final sign-off Sep 2007 | 1278 23rd Av | voluntary anchorbolt retrofit. install anchorbots at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threded-rod with 2" square washers,, epoxy-set with 7" embedment mininum, construct plywood stiffening panels on exisiting basement walls. panels to be 1/2" cdx plywood, nailedDetails
voluntary anchorbolt retrofit. install anchorbots at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threded-rod with 2" square washers,, epoxy-set with 7" embedment mininum, construct plywood stiffening panels on exisiting basement walls. panels to be 1/2" cdx plywood, nailed | $12,000 |
| Aug 28, 2007 | Completed final sign-off Mar 2008 | 256 Waterville St | replace 48' long of deteriorated foundation in southwest rear portion of the building.Details
replace 48' long of deteriorated foundation in southwest rear portion of the building. | $30,000 |
| Aug 3, 2007 | Completed final sign-off Apr 2008 | 215 27th St | foundation upgrade as per plans dated 8/02/07, replace brick foundation and add shearwalls for structural upgrade.Details
foundation upgrade as per plans dated 8/02/07, replace brick foundation and add shearwalls for structural upgrade. | $90,000 |
| Aug 3, 2007 | Completed final sign-off Aug 2007 | 171 27th St | install anchor bolt at 4' intervals in (e) perimeter foundation, anchors to be threaded-rofd with 2" sq washers, epoxy set with 7" embedment min. construct plywood stiffing panels on (e) basement walls. panels to be 1/2 cdx plywood, nailedDetails
install anchor bolt at 4' intervals in (e) perimeter foundation, anchors to be threaded-rofd with 2" sq washers, epoxy set with 7" embedment min. construct plywood stiffing panels on (e) basement walls. panels to be 1/2 cdx plywood, nailed | $10,000 |
| Jul 30, 2007 | Never finaled issued Jul 2007, no final | 215 27th St | 100 year old brick kitchen chimney is no longer in use and is badly deteriorated at base. we will be temporarly opening walls to remove entire chimney and patching finishing as neededDetails
100 year old brick kitchen chimney is no longer in use and is badly deteriorated at base. we will be temporarly opening walls to remove entire chimney and patching finishing as needed | $2,500 |
| May 18, 2007 | Completed final sign-off Aug 2007 | 1215 York St | voluntary foundation upgrade, partial seismic upgrade groundfloor.Details
voluntary foundation upgrade, partial seismic upgrade groundfloor. | $40,000 |
| May 8, 2007 | Completed final sign-off May 2007 | 1655 Grove St | renewal pa 200209095986 to complete w/ 3-r report 3296. final inspection only.Details
renewal pa 200209095986 to complete w/ 3-r report 3296. final inspection only. | |
| Apr 2, 2007 | Completed final sign-off Apr 2007 | 1443 28th Av | voluntary anchor bolt retrofit, install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod w/ 2" square washers, expoxy set with 7" embedment minimum.Details
voluntary anchor bolt retrofit, install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x 12" threaded rod w/ 2" square washers, expoxy set with 7" embedment minimum. | $2,500 |
| Mar 7, 2007 | Completed final sign-off Jun 2007 | 133 Buchanan St | voluntary seismic improvements per plans drawn by coreen & associates. structural engineers dated 2/10/07, to provide 1 hr separation between garage & habitable areas and betwwen units & between common area & units.Details
voluntary seismic improvements per plans drawn by coreen & associates. structural engineers dated 2/10/07, to provide 1 hr separation between garage & habitable areas and betwwen units & between common area & units. | $65,000 |
| Feb 28, 2007 | Completed final sign-off May 2007 | 1655 Grove St | constuct lower level structural modifications:steel support beams and seismic retrofit as per engineered plans to comply with correction notice of 3/8/2005 and add dbi report of physical inspection #3r-3296, 3/13/01 item #3 garage post and beamDetails
constuct lower level structural modifications:steel support beams and seismic retrofit as per engineered plans to comply with correction notice of 3/8/2005 and add dbi report of physical inspection #3r-3296, 3/13/01 item #3 garage post and beam | $25,000 |
| Jan 12, 2007 | Completed final sign-off Jan 2007 | 64 Moneta Wy | install anchorbolts at 4' intervals in existing perimeter foundatin, anchors to be 5/8" x 12" threared-rod with square washers, epoxy set with 7" embedment minimumDetails
install anchorbolts at 4' intervals in existing perimeter foundatin, anchors to be 5/8" x 12" threared-rod with square washers, epoxy set with 7" embedment minimum | $2,500 |
| Jan 10, 2007 | Expired or cancelled expired Feb 2013 | 205 Bennington St | optional voluntary anchorbolt retrofit. install anchorbolts at 4" intervals in existing perimeter foundation. anchors to be 5/8 x12" threaded rod with 2' square washers, epoxy set with 7" embedment. construct plywood stiffening panels on existing basement walls.panels to be 1/2 cdx plywood, nailedDetails
optional voluntary anchorbolt retrofit. install anchorbolts at 4" intervals in existing perimeter foundation. anchors to be 5/8 x12" threaded rod with 2' square washers, epoxy set with 7" embedment. construct plywood stiffening panels on existing basement walls.panels to be 1/2 cdx plywood, nailed | $2,000 |
| Dec 12, 2006 | Completed final sign-off Dec 2006 | 2040 Grove St | optional voluntary anchorbolt retrofit: instal anchorbolts at 4' intervals in (e) perimeter foundation: anchors to be 5/8" x12" threaded rod with 2" square washers, epoxy set. install plywood stiffening panels on (e) walls. 1/2"cdx nailed 10d at 3".Details
optional voluntary anchorbolt retrofit: instal anchorbolts at 4' intervals in (e) perimeter foundation: anchors to be 5/8" x12" threaded rod with 2" square washers, epoxy set. install plywood stiffening panels on (e) walls. 1/2"cdx nailed 10d at 3". | $8,000 |
| Nov 27, 2006 | Completed final sign-off Dec 2006 | 520 45th Av | voluntary retrofit of garage / basement. install 5/8" anchor bolts at 4' spacing in (e) perimeter foundation, epoxy set with 7+" imbed & 2" square washers. install plywood stiffening panels on (e) framing of front, rear & side walls 1/2" cdx nailed 10d at 3".Details
voluntary retrofit of garage / basement. install 5/8" anchor bolts at 4' spacing in (e) perimeter foundation, epoxy set with 7+" imbed & 2" square washers. install plywood stiffening panels on (e) framing of front, rear & side walls 1/2" cdx nailed 10d at 3". | $9,500 |
| Oct 31, 2006 | Never finaled issued Oct 2006, no final | 2690 46th Av | repair two water damaged wood-frame awnings at unit#16 & #19 as per structural pest report by arnest termite control dated 11/30/06. work will involue no changes in building appearrance.Details
repair two water damaged wood-frame awnings at unit#16 & #19 as per structural pest report by arnest termite control dated 11/30/06. work will involue no changes in building appearrance. | $10,000 |
| Oct 27, 2006 | Completed final sign-off Mar 2007 | 66 Walter St | various repairs as itemized in dbi housing report #3r-3477 dated 7/26/06.Details
various repairs as itemized in dbi housing report #3r-3477 dated 7/26/06. | $5,000 |
| Sep 5, 2006 | Completed final sign-off Sep 2006 | 8 Montezuma St | voluntary anchorbolt retrofit. install anchorbolts at 4' intervals in exist perimeter fndtn. anchors to be 5/8" threaded rod with 2" square washers, epoxy set with 7" imbedment min. construct plywood stiffening panes on existing basement walls. panels to be 1/2 " cdx plywood, nailed 10 d @ 3" on allDetails
voluntary anchorbolt retrofit. install anchorbolts at 4' intervals in exist perimeter fndtn. anchors to be 5/8" threaded rod with 2" square washers, epoxy set with 7" imbedment min. construct plywood stiffening panes on existing basement walls. panels to be 1/2 " cdx plywood, nailed 10 d @ 3" on all | $7,000 |
| Aug 23, 2006 | Completed final sign-off Aug 2006 | 16 Lexington St | voluntary anchorbolt retrofit. install anchorbolts at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threaded rod with 2" square washers, epoxy set 7" min.embedment no work visible from exterior. no engineer no special inspection-voluntary work.Details
voluntary anchorbolt retrofit. install anchorbolts at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threaded rod with 2" square washers, epoxy set 7" min.embedment no work visible from exterior. no engineer no special inspection-voluntary work. | $4,000 |
| Aug 17, 2006 | Completed final sign-off Aug 2006 | 672 02nd Av | voluntary anchor bolt retrofit: install anchorbolts @ 4' intervals in (e) perimeter foundation anchors to be 5/8 x 12" threaded w/2" washers, epoxy set. 2 construct plywood stiffening panles on four (e) basement walls, panels to be 1/2 cox plywood, nailed 10d @ 3", with hold down hardware @ corners.Details
voluntary anchor bolt retrofit: install anchorbolts @ 4' intervals in (e) perimeter foundation anchors to be 5/8 x 12" threaded w/2" washers, epoxy set. 2 construct plywood stiffening panles on four (e) basement walls, panels to be 1/2 cox plywood, nailed 10d @ 3", with hold down hardware @ corners. | $9,500 |
| Jul 10, 2006 | Never finaled issued Jul 2006, no final | 367 30th Av | replace (e) footing approx 15 lf of north side foundation as per plans. replacement in kind.Details
replace (e) footing approx 15 lf of north side foundation as per plans. replacement in kind. | $7,500 |
| Jul 10, 2006 | Never finaled issued Jul 2006, no final | 868 Union St | repair deteriorated post based on rear stairs as per item #2 of markoff struct. pest report #051072, 9/21/05. repair less than 50% of structure.Details
repair deteriorated post based on rear stairs as per item #2 of markoff struct. pest report #051072, 9/21/05. repair less than 50% of structure. | $1,200 |
| Jun 16, 2006 | Completed final sign-off Jun 2006 | 20 Woodhaven Ct | installing plywood stiffening panels optional retrofit. work in garage onlyDetails
installing plywood stiffening panels optional retrofit. work in garage only | $5,000 |
| Jun 5, 2006 | Completed final sign-off Jun 2006 | 117 Caselli Av | optional bsmt retrofit.install 5/8" anchor bolts at 4' spacing in exist perimeter foundation.epoxy set with 7+" imbed & 2" square washers.install plywood stiffening panels on front &side bsmt walls.panels to be 1/2" cdx plywood edge nailed 10d@3" w/ phds holdown hardware in corners,width depends onDetails
optional bsmt retrofit.install 5/8" anchor bolts at 4' spacing in exist perimeter foundation.epoxy set with 7+" imbed & 2" square washers.install plywood stiffening panels on front &side bsmt walls.panels to be 1/2" cdx plywood edge nailed 10d@3" w/ phds holdown hardware in corners,width depends on | $4,500 |
| May 3, 2006 | Completed final sign-off Jun 2006 | 146 Granville Wy | optional retrofit. install anchorbolts in existing perimeter foundation. 5/8 x 12" threaded rod with 2" square washers epoxy set at 4' spacing. install plywood stiffening panels on accessible secions of existing basement wall framing, 1/2 " cdx panels nailed 10 d at 3" no plans, calcs, spec instructDetails
optional retrofit. install anchorbolts in existing perimeter foundation. 5/8 x 12" threaded rod with 2" square washers epoxy set at 4' spacing. install plywood stiffening panels on accessible secions of existing basement wall framing, 1/2 " cdx panels nailed 10 d at 3" no plans, calcs, spec instruct | $13,000 |
| Apr 26, 2006 | Expired or cancelled expired Dec 2007 | 65 Levant St | repair deck girder as perm item 4 of termite report markoff stuctural pest control report #06560 4/7/2006Details
repair deck girder as perm item 4 of termite report markoff stuctural pest control report #06560 4/7/2006 | $1,000 |
| Mar 15, 2006 | Completed final sign-off Mar 2006 | 279 31st Av | optional anchor bolt retrofit, 5/8" by 12" threaded rod anchros epoxy set at 4' spacing in existing perimeter foundationDetails
optional anchor bolt retrofit, 5/8" by 12" threaded rod anchros epoxy set at 4' spacing in existing perimeter foundation | $1,000 |
| Jan 24, 2006 | Completed final sign-off Feb 2006 | 57 Vicksburg St | optional retrofit of garage / basement. install 5/8" anchor bolts at 4' spacing in (e) perimeter foundation, epoxy set with 7+" imbed. & 2" square washers. install plywood stiffening penels on (e) side & rear basement wall framing, 5 panels 8' long, 1/2" cdx nailed i od at 3".Details
optional retrofit of garage / basement. install 5/8" anchor bolts at 4' spacing in (e) perimeter foundation, epoxy set with 7+" imbed. & 2" square washers. install plywood stiffening penels on (e) side & rear basement wall framing, 5 panels 8' long, 1/2" cdx nailed i od at 3". | $5,800 |
| Nov 10, 2005 | Completed final sign-off Dec 2005 | 3574 22nd St | install anchor bolts in exist perimeter foundation 5/8 x 12 thr rod w/2" sq washers, epoxy set at 4'spacing. install plywood stiffenting panels on all 4 bsmt walls 1/2 "cdx nailed 10 d at 3" walls to be unfinishedDetails
install anchor bolts in exist perimeter foundation 5/8 x 12 thr rod w/2" sq washers, epoxy set at 4'spacing. install plywood stiffenting panels on all 4 bsmt walls 1/2 "cdx nailed 10 d at 3" walls to be unfinished | $3,000 |
| Aug 22, 2005 | Completed final sign-off Aug 2005 | 387 Pacheco St | optional retrofit of garage/basement, install 5/8" anchor bolts at 4' spacing in accesible portion oDetails
optional retrofit of garage/basement, install 5/8" anchor bolts at 4' spacing in accesible portion o | $2,000 |