Kelly Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Jul 2012
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1a - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations & stucco over to match in-kind. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1a - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations & stucco over to match in-kind. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1c - to comply with ab-094. structural strengthening to mitigate soft story of bldg. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1c - to comply with ab-094. structural strengthening to mitigate soft story of bldg. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1e - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match (e) building & wood sheetng.Details
unit #1e - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match (e) building & wood sheetng. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1f - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at front of bldg with new concrete foundations.Details
unit #1f - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at front of bldg with new concrete foundations. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1b - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1b - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #2d - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match bldg. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #2d - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match bldg. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | unit #1g - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at east face of bldg with new concrete foundations. provide stucco over steel to match bldg. 2 new monment frame along north face of building with concrete foundations.Details
unit #1g - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at east face of bldg with new concrete foundations. provide stucco over steel to match bldg. 2 new monment frame along north face of building with concrete foundations. | $30,000 |
| Feb 16, 2010 | Completed final sign-off Aug 2010 | 55 Pierce St | create bedroom & install bathroom at 1st floor. rebuild stair (interior) 2nd to 1st floor, seismic upgrade at 1st floor, remove e concrete adjacent to d/w, add concrete stair, 1st floor to rearDetails
create bedroom & install bathroom at 1st floor. rebuild stair (interior) 2nd to 1st floor, seismic upgrade at 1st floor, remove e concrete adjacent to d/w, add concrete stair, 1st floor to rear | $75,000 |
| Jun 6, 2005 | Completed final sign-off Jul 2005 | 25 Edna St | remove exist concrete slab porch which is dryrotted, replace w new tile porch approx 25x6, repair drDetails
remove exist concrete slab porch which is dryrotted, replace w new tile porch approx 25x6, repair dr | $13,500 |
| May 13, 2002 | Completed final sign-off May 2002 | 2409 26th Av | dry rot repair to stucco mouldings on front windowsDetails
dry rot repair to stucco mouldings on front windows | $500 |
| Oct 24, 2000 | Completed final sign-off Nov 2000 | 363 Park St | remove 4 posts under structural beam & replace w/ new posts support new concrete footings.drainage..Details
remove 4 posts under structural beam & replace w/ new posts support new concrete footings.drainage.. | $4,000 |