Kashaneh Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Dec 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2023 | Completed final sign-off Jan 2024 | 2033 Hayes St | install hvac condensor or heat pump based on allowable dba or noise level, (on the ground, not visable from st) it is 37 dba location at lightwell. minor duct adjustable. on the g/f, not visible from street. to comply with article 29 noise requirment.Details
install hvac condensor or heat pump based on allowable dba or noise level, (on the ground, not visable from st) it is 37 dba location at lightwell. minor duct adjustable. on the g/f, not visible from street. to comply with article 29 noise requirment. | $800 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 407 Clipper St | interior exploratory openings at walls/ceiling to be observed by engineer, at local room locations, max 100 sq. ft. total, opening/patch back to original finishesDetails
interior exploratory openings at walls/ceiling to be observed by engineer, at local room locations, max 100 sq. ft. total, opening/patch back to original finishes | $4,000 |
| Apr 6, 2018 | Completed final sign-off Jan 2019 | 166 Geary St | 9th flr, suite 900 - office remodel - r&r (e) lighting. new layout 2 partner offices, 9 open space. new glass dorrs and wall. no change to (e) heatingDetails
9th flr, suite 900 - office remodel - r&r (e) lighting. new layout 2 partner offices, 9 open space. new glass dorrs and wall. no change to (e) heating | $41,000 |
| Apr 5, 2018 | Completed final sign-off May 2018 | 1603 Grove St | unit 1603 - close pantry in kitchen, open wall in bedroom to enlarge closet; install elec washer/dryer hookup (elec dryer & ventless). there is no fire alarm in bldgDetails
unit 1603 - close pantry in kitchen, open wall in bedroom to enlarge closet; install elec washer/dryer hookup (elec dryer & ventless). there is no fire alarm in bldg | $5,000 |
| Apr 3, 2018 | Completed final sign-off Jun 2019 | 1605 Grove St | unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorwayDetails
unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorway | $30,000 |
| Mar 6, 2018 | Completed final sign-off May 2018 | 1607 Grove St | to comply with complaint 201842291, remodel bathroom, legalize lightwell(see planning's note) as part of bathroom, move hot water heater & vent properlyDetails
to comply with complaint 201842291, remodel bathroom, legalize lightwell(see planning's note) as part of bathroom, move hot water heater & vent properly | $4,000 |
| Jun 26, 2017 | Completed final sign-off Jan 2018 | 2886 16th St | work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tileDetails
work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tile | $10,000 |
| Dec 20, 2016 | Completed final sign-off Sep 2018 | 143 San Jose Av | add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing.Details
add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing. | $250,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 800 Lyon St | interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage.Details
interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage. | $80,000 |
| Apr 2, 2015 | Completed final sign-off Feb 2016 | 806 Lyon St | interior renovation of kitchen and 1/2 bath. relocating (e) full bathDetails
interior renovation of kitchen and 1/2 bath. relocating (e) full bath | $50,000 |
| Sep 18, 2012 | Completed final sign-off Feb 2013 | 34 Mason St | install partions walls, doors, glass on 3rd and 4th floor office tenant improvement. walls have clearance from sprinkler heads of 18 inches- sprinklers require no changes- upgrade 2 (e) non-compliant toilet rooms to compliance. mep under separate permit.Details
install partions walls, doors, glass on 3rd and 4th floor office tenant improvement. walls have clearance from sprinkler heads of 18 inches- sprinklers require no changes- upgrade 2 (e) non-compliant toilet rooms to compliance. mep under separate permit. | $130,000 |
| Aug 31, 2012 | Completed final sign-off Jul 2013 | 34 Mason St | t.i. remodel extg bar/restaurant, electrical, plumbing, mechanical. and occupant load per new space configurationDetails
t.i. remodel extg bar/restaurant, electrical, plumbing, mechanical. and occupant load per new space configuration | $190,000 |
| Nov 10, 2010 | Completed final sign-off Dec 2010 | 53 Duncan St | reroofingDetails
reroofing | $6,000 |
| Nov 10, 2010 | Completed final sign-off Dec 2010 | 53 Duncan St | install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rearDetails
install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rear | $4,000 |