Karl Marcrae Consulting
- Based in
- Oakland
- On San Francisco permits
- Aug 2010 to Mar 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2022 | Never finaled issued Apr 2022, no final | 426 Fillmore St | to comply with nov# 202184635(4). build stairs to (e) patio. rebuild (e) guard rail to make code compliant (200lbs lateral).Details
to comply with nov# 202184635(4). build stairs to (e) patio. rebuild (e) guard rail to make code compliant (200lbs lateral). | $12,000 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 2855 25th St | engineered voluntary seismic strengthening w/ holddowns, plywood shear walls, diagonal brace & simpson strong wall.Details
engineered voluntary seismic strengthening w/ holddowns, plywood shear walls, diagonal brace & simpson strong wall. | $12,500 |
| Mar 29, 2016 | Completed final sign-off Aug 2017 | 1339 Oak St | remodel of upper flat, remodel kitchen move sink, new counters, cabinets, new lighting. new bath with new plumbing for toilet, shower, sink. engineered alterations of walls, new lighting, 2 gas heating units to replace existing.Details
remodel of upper flat, remodel kitchen move sink, new counters, cabinets, new lighting. new bath with new plumbing for toilet, shower, sink. engineered alterations of walls, new lighting, 2 gas heating units to replace existing. | $60,000 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 3016 Jackson St | 1)voluntary installation of structural shear wall in basement. 2) ada improvement to entry railingsDetails
1)voluntary installation of structural shear wall in basement. 2) ada improvement to entry railings | $13,000 |
| Aug 12, 2010 | Completed final sign-off Aug 2011 | 518 Valencia St | renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room,Details
renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room, | $78,000 |