Kares Construction Inc
- Based in
- Livermore
- On San Francisco permits
- Apr 2003 to Dec 2010
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | t.i. commercial space include revised locations.relocated doors, glazing rev ceiling, new plumbing, new casework, finishes. revision to permit #201010293995. revision to electrical,mech,fire/life safty under seperate permitDetails
t.i. commercial space include revised locations.relocated doors, glazing rev ceiling, new plumbing, new casework, finishes. revision to permit #201010293995. revision to electrical,mech,fire/life safty under seperate permit | $15,000 |
| Nov 19, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | revised sht. index - revision to appl #201009221419 (t.i. org. pa #201008038021):revised glass finish & door hardware, removed alternate door detail, light fixture revision, exiting added.Details
revised sht. index - revision to appl #201009221419 (t.i. org. pa #201008038021):revised glass finish & door hardware, removed alternate door detail, light fixture revision, exiting added. | |
| Nov 16, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | (mep) for permit application 201010293995, 1st floor. lighting switching, receptacles, duct work alterations, add 2 sinksDetails
(mep) for permit application 201010293995, 1st floor. lighting switching, receptacles, duct work alterations, add 2 sinks | $179,000 |
| Nov 16, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | 1st floor-revision to 201010203409: demolition at stairwell and chain link fence at stair entranceDetails
1st floor-revision to 201010203409: demolition at stairwell and chain link fence at stair entrance | $2,000 |
| Oct 29, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | tenant improvment including new non load bearing walls, doors, glaz, ceiling grid, lighting, casework, finsihes. electrical, mech, plumbing under separate permit.Details
tenant improvment including new non load bearing walls, doors, glaz, ceiling grid, lighting, casework, finsihes. electrical, mech, plumbing under separate permit. | $325,000 |
| Oct 20, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | 1st floor & 2nd floor mezzanine - demolish interior non-load bearing walls to convert space to shell status.Details
1st floor & 2nd floor mezzanine - demolish interior non-load bearing walls to convert space to shell status. | $12,000 |
| Sep 24, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | mechanical and electrical permit. architectural ti under pa# 2010.08.03.8021 for referenceDetails
mechanical and electrical permit. architectural ti under pa# 2010.08.03.8021 for reference | $120,000 |
| Sep 22, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | revision to appl 2010-08-03-8021. change a front entry door, rating the doors some of interior wall configuration and changing door to sliding doors.Details
revision to appl 2010-08-03-8021. change a front entry door, rating the doors some of interior wall configuration and changing door to sliding doors. | |
| Aug 3, 2010 | Completed final sign-off Aug 2011 | 642 Harrison St | office ti on the 3rd floor including new partitions, rated assemblies and code required. mep and life safety measures under separate permitDetails
office ti on the 3rd floor including new partitions, rated assemblies and code required. mep and life safety measures under separate permit | $344,500 |
| Apr 22, 2003 | Completed final sign-off Jul 2003 | 300 Beale St | office expansion into adjacent shell space on 1st floor & 2nd floor, incl. single accomm. restrmDetails
office expansion into adjacent shell space on 1st floor & 2nd floor, incl. single accomm. restrm | $5,000 |