Kamran Ehsanipour
- Based in
- Burlingame
- On San Francisco permits
- Mar 2007 to Aug 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2009 | Completed final sign-off Nov 2009 | 743 Clayton St | repair/trim & paint at front elevation stucco & windows.Details
repair/trim & paint at front elevation stucco & windows. | $15,000 |
| Mar 14, 2007 | Completed final sign-off Jun 2007 | 2760 Octavia St | remove(e)interior finishes.reloc 2 compartment&hand sink.install empty glass drs,work counters,cabinetry,coil drapery within ceiling track sys.composite wood panels&wall paneling. light fixtures&slip resistant ceramic flooring.lighting seperate permits.(entry glass door&flooring for disable access).Details
remove(e)interior finishes.reloc 2 compartment&hand sink.install empty glass drs,work counters,cabinetry,coil drapery within ceiling track sys.composite wood panels&wall paneling. light fixtures&slip resistant ceramic flooring.lighting seperate permits.(entry glass door&flooring for disable access). | $33,400 |