Permit GraphShortlistSan Francisco building permits since 2000

K T Planning & Construction

Contractor license
729793
State license record
Based in
San Jose
On San Francisco permits
Nov 2004 to Aug 2007
Last 24 months
0 permits filed

8 permits since 2000: 7 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 2Kitchen remodel 3Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 28, 2007Never finaled
issued Aug 2007, no final
450 30th Stremodel existing 1st floor to add full bthroom, enlarge family room, replace (e) door with (n) window, replace (e) window with (n) door and (n) window on side elevations, add laundry closet at 2nd floor, and remodel exterior stair to access side yard.
Details
Permit
200708281080
Status
issued
Filed
Aug 28, 2007
Permit issued
Aug 28, 2007
Declared cost
$40,000
Address
450 30th St

remodel existing 1st floor to add full bthroom, enlarge family room, replace (e) door with (n) window, replace (e) window with (n) door and (n) window on side elevations, add laundry closet at 2nd floor, and remodel exterior stair to access side yard.

Open the permit page

$40,000
Jul 26, 2007Completed
final sign-off Aug 2007
2320 Bryant Stlegalize existing bathroom at the second story (attic).
Details
Permit
200707267904
Status
complete
Filed
Jul 26, 2007
Permit issued
Jul 27, 2007
Final sign-off
Aug 20, 2007
Declared cost
$8,000
Address
2320 Bryant St

legalize existing bathroom at the second story (attic).

Open the permit page

$8,000
May 21, 2007Completed
final sign-off Jul 2007
257 Theresa Strebuild dryrotted deck and staircase. comply with nov 200799520
Details
Permit
200705211867
Status
complete
Filed
May 21, 2007
Permit issued
May 21, 2007
Final sign-off
Jul 11, 2007
Declared cost
$10,000
Address
257 Theresa St

rebuild dryrotted deck and staircase. comply with nov 200799520

Open the permit page

$10,000
Nov 29, 2006Completed
final sign-off Mar 2007
2320 Bryant Stinterior remodel replace kitchen cabiinets new flooring new lighting, enlarge window, replace door iwht window, replace windwo with door, new closerts at front rooms repair replace deteriiorated exterior siding/windows, doors not visible form street.
Details
Permit
200611298674
Status
complete
Filed
Nov 29, 2006
Permit issued
Nov 29, 2006
Final sign-off
Mar 19, 2007
Declared cost
$30,000
Address
2320 Bryant St

interior remodel replace kitchen cabiinets new flooring new lighting, enlarge window, replace door iwht window, replace windwo with door, new closerts at front rooms repair replace deteriiorated exterior siding/windows, doors not visible form street.

Open the permit page

$30,000
Nov 29, 2006Completed
final sign-off Jun 2007
273 Duncan Stretiling shower walls. retiling floor. (e) fixtures to remain.
Details
Permit
200611298647
Status
complete
Filed
Nov 29, 2006
Permit issued
Nov 29, 2006
Final sign-off
Jun 22, 2007
Declared cost
$2,400
Address
273 Duncan St

retiling shower walls. retiling floor. (e) fixtures to remain.

Open the permit page

$2,400
Apr 6, 2006Completed
final sign-off Sep 2008
31 Robinson Drrear horizontal addition of a single family dwelling, 608 sf on g/f, 2nd fl. electrical, plumbing, mech separate permit
Details
Permit
200604068457
Status
complete
Filed
Apr 6, 2006
Permit issued
Mar 6, 2007
Final sign-off
Sep 3, 2008
Declared cost
$60,000
Address
31 Robinson Dr

rear horizontal addition of a single family dwelling, 608 sf on g/f, 2nd fl. electrical, plumbing, mech separate permit

Open the permit page

$60,000
Dec 15, 2004Completed
final sign-off Mar 2005
1979 21st Avremodel kitchen & bathroom on 2/f,replace new central heater,convert storage in g/f to living area
Details
Permit
200412151472
Status
complete
Filed
Dec 15, 2004
Permit issued
Dec 15, 2004
Final sign-off
Mar 3, 2005
Declared cost
$35,000
Address
1979 21st Av

remodel kitchen & bathroom on 2/f,replace new central heater,convert storage in g/f to living area

Open the permit page

$35,000
Nov 5, 2004Completed
final sign-off May 2005
2330 Filbert Streplace elec. service to 100 amp,replace new cabinet kitchen,non structural.replace new central heat
Details
Permit
200411058637
Status
complete
Filed
Nov 5, 2004
Permit issued
Nov 5, 2004
Final sign-off
May 6, 2005
Declared cost
$15,000
Address
2330 Filbert St

replace elec. service to 100 amp,replace new cabinet kitchen,non structural.replace new central heat

Open the permit page

$15,000