Permit GraphShortlistSan Francisco building permits since 2000

K Lui General Construction Co.

Contractor license
934201
State license record
Based in
Millbrae
On San Francisco permits
Sep 2009 to May 2025
Last 24 months
1 permit filed

97 permits since 2000: 88 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.

Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 2Kitchen remodel 5Bathroom remodel 5
FiledOutcomeAddressWork described on the permitDeclared cost
May 20, 2025Completed
final sign-off Jun 2025
210 Clement Staccesibilities upgrade at entrance. new handicap ramp (1"-12") auto door opener, pony wall, kick plate, offset handle and threshold
Details
Permit
202505206845
Status
complete
Filed
May 20, 2025
Permit issued
May 20, 2025
Final sign-off
Jun 18, 2025
Declared cost
$11,000
Address
210 Clement St

accesibilities upgrade at entrance. new handicap ramp (1"-12") auto door opener, pony wall, kick plate, offset handle and threshold

Open the permit page

$11,000
May 6, 2024In progress
filed May 2024, not yet issued
570 Munich Stremove (1) bar sink. remove (1) sink (1) toilet (1) bathtub (bathroom only)
Details
Permit
202405061437
Status
filed
Filed
May 6, 2024
Declared cost
$1,000
Address
570 Munich St

remove (1) bar sink. remove (1) sink (1) toilet (1) bathtub (bathroom only)

Open the permit page

$1,000
Nov 6, 2023Completed
final sign-off Dec 2023
308 Clement Staccessible business entrance program per ordinance 51-16, auto door opener, abe# 201806200719.
Details
Permit
202311060198
Status
complete
Filed
Nov 6, 2023
Permit issued
Nov 22, 2023
Final sign-off
Dec 27, 2023
Declared cost
$3,500
Address
308 Clement St

accessible business entrance program per ordinance 51-16, auto door opener, abe# 201806200719.

Open the permit page

$3,500
Oct 25, 2023Completed
final sign-off Apr 2024
306 Clement Stto comply w/accessible business entrance program/ordinance 51-16, abe#201806200718. auto door opener, handicap ramp (1-12 ft) & pony wall.
Details
Permit
202310259415
Status
complete
Filed
Oct 25, 2023
Permit issued
Nov 2, 2023
Final sign-off
Apr 24, 2024
Declared cost
$5,900
Address
306 Clement St

to comply w/accessible business entrance program/ordinance 51-16, abe#201806200718. auto door opener, handicap ramp (1-12 ft) & pony wall.

Open the permit page

$5,900
Oct 25, 2023Completed
final sign-off Dec 2023
304 Clement Stto comply w/accessible business entrance program/ordinance 51-16, abe#201806200720. auto door opener
Details
Permit
202310259418
Status
complete
Filed
Oct 25, 2023
Permit issued
Oct 25, 2023
Final sign-off
Dec 27, 2023
Declared cost
$3,500
Address
304 Clement St

to comply w/accessible business entrance program/ordinance 51-16, abe#201806200720. auto door opener

Open the permit page

$3,500
Oct 11, 2023Completed
final sign-off Nov 2023
1005 Bush Stto comply w/accessible business entrance program/ordinance 51-16, abe#201806200729, install auto door opener at front door
Details
Permit
202310118382
Status
complete
Filed
Oct 11, 2023
Permit issued
Oct 11, 2023
Final sign-off
Nov 7, 2023
Declared cost
$3,500
Address
1005 Bush St

to comply w/accessible business entrance program/ordinance 51-16, abe#201806200729, install auto door opener at front door

Open the permit page

$3,500
Oct 11, 2023Completed
final sign-off Nov 2023
1017 Bush Stto comply w/accessible business entrance program/ordinance 51-16, abe#201806200725, install auto door opener at front door
Details
Permit
202310118384
Status
complete
Filed
Oct 11, 2023
Permit issued
Oct 11, 2023
Final sign-off
Nov 7, 2023
Declared cost
$5,000
Address
1017 Bush St

to comply w/accessible business entrance program/ordinance 51-16, abe#201806200725, install auto door opener at front door

Open the permit page

$5,000
Oct 11, 2023Completed
final sign-off Nov 2023
1001 Bush Stto comply w/accessible business entrance program/ordinance 51-16, abe#201806200730, install auto door opener at front door
Details
Permit
202310118378
Status
complete
Filed
Oct 11, 2023
Permit issued
Oct 11, 2023
Final sign-off
Nov 7, 2023
Declared cost
$5,000
Address
1001 Bush St

to comply w/accessible business entrance program/ordinance 51-16, abe#201806200730, install auto door opener at front door

Open the permit page

$5,000
Jan 18, 2023Completed
final sign-off Jun 2023
1398 Grant Avto comply w/accessible business entrance program/ordinance 51-16. abe#202209304857. ramp & auto opener
Details
Permit
202301180303
Status
complete
Filed
Jan 18, 2023
Permit issued
Jan 18, 2023
Final sign-off
Jun 15, 2023
Declared cost
$8,000
Address
1398 Grant Av

to comply w/accessible business entrance program/ordinance 51-16. abe#202209304857. ramp & auto opener

Open the permit page

$8,000
Jan 18, 2023Completed
final sign-off Jun 2023
1350 Grant Avto comply w/accessible business entrance program/ordinance 51-16. abe#202209304859. ramp & auto opener, new iron gate.
Details
Permit
202301180301
Status
complete
Filed
Jan 18, 2023
Permit issued
Feb 23, 2023
Final sign-off
Jun 28, 2023
Declared cost
$9,000
Address
1350 Grant Av

to comply w/accessible business entrance program/ordinance 51-16. abe#202209304859. ramp & auto opener, new iron gate.

Open the permit page

$9,000
Dec 30, 2022Completed
final sign-off Jun 2023
2129 Taraval Stto comply with accessible business entrance program/ordinance 51-16. install power door operator per information sheet da-4/05 with extg sloped landing at exterior side of door. abe #202206211581
Details
Permit
202212309591
Status
complete
Filed
Dec 30, 2022
Permit issued
Apr 21, 2023
Final sign-off
Jun 1, 2023
Declared cost
$2,000
Address
2129 Taraval St

to comply with accessible business entrance program/ordinance 51-16. install power door operator per information sheet da-4/05 with extg sloped landing at exterior side of door. abe #202206211581

Open the permit page

$2,000
Oct 19, 2022Completed
final sign-off Nov 2022
459 Filbert Stto comply with complaint #202293894: provide handrail and guardrail at back stairway.
Details
Permit
202210194719
Status
complete
Filed
Oct 19, 2022
Permit issued
Oct 19, 2022
Final sign-off
Nov 22, 2022
Declared cost
$2,000
Address
459 Filbert St

to comply with complaint #202293894: provide handrail and guardrail at back stairway.

Open the permit page

$2,000
Aug 19, 2022Completed
final sign-off Mar 2023
1350 Grant Avcommercial: soft story retrofit per sfebc champt 5e national design method accessibilty compliance. (soft story)
Details
Permit
202208190894
Status
complete
Filed
Aug 19, 2022
Permit issued
Sep 2, 2022
Final sign-off
Mar 13, 2023
Declared cost
$13,000
Address
1350 Grant Av

commercial: soft story retrofit per sfebc champt 5e national design method accessibilty compliance. (soft story)

Open the permit page

$13,000
Aug 19, 2022Completed
final sign-off Mar 2023
1350 Grant Avresidential: soft story retrofit per sfebc chapt 5e national design method accessibilty compliance.
Details
Permit
202208190895
Status
complete
Filed
Aug 19, 2022
Permit issued
Sep 2, 2022
Final sign-off
Mar 13, 2023
Declared cost
$90,000
Address
1350 Grant Av

residential: soft story retrofit per sfebc chapt 5e national design method accessibilty compliance.

Open the permit page

$90,000
Feb 2, 2022Completed
final sign-off Feb 2023
301 Columbus Avcommercial. soft story retrofitting per sfebc chapter 5e national design method. accessiblity compliance (soft story)
Details
Permit
202202027166
Status
complete
Filed
Feb 2, 2022
Permit issued
Jun 22, 2022
Final sign-off
Feb 3, 2023
Declared cost
$15,000
Address
301 Columbus Av

commercial. soft story retrofitting per sfebc chapter 5e national design method. accessiblity compliance (soft story)

Open the permit page

$15,000
Feb 2, 2022Completed
final sign-off Feb 2023
301 Columbus Avresidential. soft story retrofitting per sfebc chapter 5e national design method.
Details
Permit
202202027171
Status
complete
Filed
Feb 2, 2022
Permit issued
Jun 22, 2022
Final sign-off
Feb 3, 2023
Declared cost
$125,000
Address
301 Columbus Av

residential. soft story retrofitting per sfebc chapter 5e national design method.

Open the permit page

$125,000
Feb 6, 2020Completed
final sign-off Jul 2020
2439 Larkin Strevise location of shear wall rev to pa 2019-1031-6079 (soft story)
Details
Permit
202002063747
Status
complete
Filed
Feb 6, 2020
Permit issued
Feb 7, 2020
Final sign-off
Jul 24, 2020
Address
2439 Larkin St

revise location of shear wall rev to pa 2019-1031-6079 (soft story)

Open the permit page

Oct 31, 2019Completed
final sign-off Jul 2020
2439 Larkin Stsoft story retrofitting per sfebc chapter 4d, other rational design method
Details
Permit
201910316079
Status
complete
Filed
Oct 31, 2019
Permit issued
Nov 1, 2019
Final sign-off
Jul 24, 2020
Declared cost
$120,000
Address
2439 Larkin St

soft story retrofitting per sfebc chapter 4d, other rational design method

Open the permit page

$120,000
Apr 5, 2019Completed
final sign-off Jun 2019
241 Cervantes Blsoft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.
Details
Permit
201904057209
Status
complete
Filed
Apr 5, 2019
Permit issued
Apr 8, 2019
Final sign-off
Jun 13, 2019
Declared cost
$28,000
Address
241 Cervantes Bl

soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.

Open the permit page

$28,000
Mar 27, 2019Completed
final sign-off Aug 2019
260 26th Avsoft storey retrofitting per sfbc chapter 4d national design method
Details
Permit
201903276353
Status
complete
Filed
Mar 27, 2019
Permit issued
Mar 29, 2019
Final sign-off
Aug 29, 2019
Declared cost
$70,000
Address
260 26th Av

soft storey retrofitting per sfbc chapter 4d national design method

Open the permit page

$70,000
Dec 13, 2018Completed
final sign-off Mar 2019
369 10th Avsoft story retrofit per sfbc chapter 4d national design method
Details
Permit
201812138197
Status
complete
Filed
Dec 13, 2018
Permit issued
Dec 14, 2018
Final sign-off
Mar 12, 2019
Declared cost
$75,000
Address
369 10th Av

soft story retrofit per sfbc chapter 4d national design method

Open the permit page

$75,000
Nov 29, 2018Completed
final sign-off Jul 2019
14 Clement Stsoft story retrofit per sfbc chapter 4d national design method, residential
Details
Permit
201811297004
Status
complete
Filed
Nov 29, 2018
Permit issued
Nov 30, 2018
Final sign-off
Jul 26, 2019
Declared cost
$65,000
Address
14 Clement St

soft story retrofit per sfbc chapter 4d national design method, residential

Open the permit page

$65,000
Nov 29, 2018Completed
final sign-off Jul 2019
14 Clement Stsoft story accessiblity compliance, commercial
Details
Permit
201811297006
Status
complete
Filed
Nov 29, 2018
Permit issued
Nov 30, 2018
Final sign-off
Jul 26, 2019
Declared cost
$40,000
Address
14 Clement St

soft story accessiblity compliance, commercial

Open the permit page

$40,000
Oct 3, 2018Completed
final sign-off Jan 2019
801 25th Avsoft story retrofitting per cfbc chapter 4d other rational design method.
Details
Permit
201810032110
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 5, 2018
Final sign-off
Jan 14, 2019
Declared cost
$90,000
Address
801 25th Av

soft story retrofitting per cfbc chapter 4d other rational design method.

Open the permit page

$90,000
Sep 7, 2018Completed
final sign-off Oct 2020
293 04th Avresidential soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079449-commercial
Details
Permit
201809079450
Status
complete
Filed
Sep 7, 2018
Permit issued
Sep 7, 2018
Final sign-off
Oct 20, 2020
Declared cost
$45,000
Address
293 04th Av

residential soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079449-commercial

Open the permit page

$45,000
Sep 7, 2018Completed
final sign-off Oct 2020
293 04th Avcommercial soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079450-residential
Details
Permit
201809079449
Status
complete
Filed
Sep 7, 2018
Permit issued
Sep 7, 2018
Final sign-off
Oct 20, 2020
Declared cost
$20,000
Address
293 04th Av

commercial soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079450-residential

Open the permit page

$20,000
Aug 31, 2018Completed
final sign-off Sep 2018
1847 Stockton Strevision of 201709148124 (soft story) new open wall location
Details
Permit
201808318889
Status
complete
Filed
Aug 31, 2018
Permit issued
Sep 4, 2018
Final sign-off
Sep 17, 2018
Declared cost
$4,000
Address
1847 Stockton St

revision of 201709148124 (soft story) new open wall location

Open the permit page

$4,000
Aug 20, 2018Completed
final sign-off Mar 2020
1400 Taraval St(residential)soft story retrofit sfebc chapter 4d: other rational design
Details
Permit
201808207813
Status
complete
Filed
Aug 20, 2018
Permit issued
Aug 24, 2018
Final sign-off
Mar 16, 2020
Declared cost
$63,000
Address
1400 Taraval St

(residential)soft story retrofit sfebc chapter 4d: other rational design

Open the permit page

$63,000
Aug 20, 2018Never finaled
issued Aug 2018, no final
1400 Taraval St(commercial)soft story retrofit sfebc chapter 4d: other rational design
Details
Permit
201808207811
Status
issued
Filed
Aug 20, 2018
Permit issued
Aug 24, 2018
Declared cost
$12,000
Address
1400 Taraval St

(commercial)soft story retrofit sfebc chapter 4d: other rational design

Open the permit page

$12,000
Aug 10, 2018Completed
final sign-off Dec 2018
300 Hill Stsoft story retrofit per sfbc chapter 4d, 2016 cebc appendix national design method
Details
Permit
201808107053
Status
complete
Filed
Aug 10, 2018
Permit issued
Aug 17, 2018
Final sign-off
Dec 12, 2018
Declared cost
$80,000
Address
300 Hill St

soft story retrofit per sfbc chapter 4d, 2016 cebc appendix national design method

Open the permit page

$80,000
Jun 29, 2018Completed
final sign-off Dec 2019
600 34th Avsoft story retrofitting per sfbc chapter 4d rational design method
Details
Permit
201806293346
Status
complete
Filed
Jun 29, 2018
Permit issued
Jun 29, 2018
Final sign-off
Dec 19, 2019
Declared cost
$80,000
Address
600 34th Av

soft story retrofitting per sfbc chapter 4d rational design method

Open the permit page

$80,000
Jun 11, 2018Completed
final sign-off Oct 2019
530 06th Avsoft story retrofit per sfebc chapter 4d engineering criteria: national design method.
Details
Permit
201806111471
Status
complete
Filed
Jun 11, 2018
Permit issued
Jun 18, 2018
Final sign-off
Oct 2, 2019
Declared cost
$80,000
Address
530 06th Av

soft story retrofit per sfebc chapter 4d engineering criteria: national design method.

Open the permit page

$80,000
Apr 13, 2018Completed
final sign-off Jun 2018
444 22nd Avsoft story retrofit per sfebc chapter 4d engineering criteria: other rational design method.
Details
Permit
201804136266
Status
complete
Filed
Apr 13, 2018
Permit issued
Apr 13, 2018
Final sign-off
Jun 19, 2018
Declared cost
$75,000
Address
444 22nd Av

soft story retrofit per sfebc chapter 4d engineering criteria: other rational design method.

Open the permit page

$75,000
Feb 21, 2018Completed
final sign-off Feb 2018
154 Cole Strevision to 201401236911, soft story retrofit per sfbc ch 4d national design method. clarify scope of work, building inrormation, applicable codes and drawing index as shown on a-1
Details
Permit
201802211808
Status
complete
Filed
Feb 21, 2018
Permit issued
Feb 23, 2018
Final sign-off
Feb 27, 2018
Address
154 Cole St

revision to 201401236911, soft story retrofit per sfbc ch 4d national design method. clarify scope of work, building inrormation, applicable codes and drawing index as shown on a-1

Open the permit page

Dec 4, 2017Never finaled
issued Dec 2017, no final
1691 47th Avto comply with nov 201717273: soft story retr0fitting per sfbc chapter 4d national design method
Details
Permit
201712045347
Status
issued
Filed
Dec 4, 2017
Permit issued
Dec 8, 2017
Declared cost
$28,000
Address
1691 47th Av

to comply with nov 201717273: soft story retr0fitting per sfbc chapter 4d national design method

Open the permit page

$28,000
Dec 1, 2017Completed
final sign-off May 2018
430 Warren Drsoft story retrofit per sfebc chapter 4d, other rational design
Details
Permit
201712015236
Status
complete
Filed
Dec 1, 2017
Permit issued
Dec 8, 2017
Final sign-off
May 15, 2018
Declared cost
$84,000
Address
430 Warren Dr

soft story retrofit per sfebc chapter 4d, other rational design

Open the permit page

$84,000
Nov 27, 2017Completed
final sign-off Jul 2020
86 Parker Avto comply with nov#201716251, soft story retrofit per sfebc chapter 4d, other rational design.
Details
Permit
201711274788
Status
complete
Filed
Nov 27, 2017
Permit issued
Dec 8, 2017
Final sign-off
Jul 27, 2020
Declared cost
$48,000
Address
86 Parker Av

to comply with nov#201716251, soft story retrofit per sfebc chapter 4d, other rational design.

Open the permit page

$48,000
Sep 28, 2017Completed
final sign-off Jan 2018
1436 48th Avsoft story retrofit per sfebc chapter 4d engineering criteria other rational design
Details
Permit
201709289843
Status
complete
Filed
Sep 28, 2017
Permit issued
Sep 29, 2017
Final sign-off
Jan 22, 2018
Declared cost
$85,000
Address
1436 48th Av

soft story retrofit per sfebc chapter 4d engineering criteria other rational design

Open the permit page

$85,000
Sep 14, 2017Completed
final sign-off Sep 2018
1847 Stockton Stfront bldg - soft story retrofitting epr sfebc chpater 4d engineering criteria rational method method.
Details
Permit
201709148124
Status
complete
Filed
Sep 14, 2017
Permit issued
Sep 15, 2017
Final sign-off
Sep 17, 2018
Declared cost
$49,000
Address
1847 Stockton St

front bldg - soft story retrofitting epr sfebc chpater 4d engineering criteria rational method method.

Open the permit page

$49,000
Sep 14, 2017Completed
final sign-off Sep 2021
4801 17th Stsoft story retrofitting per sfebc chpater 4d engineering criteria rational method method. 2016 cebc appendix a-4
Details
Permit
201709148113
Status
complete
Filed
Sep 14, 2017
Permit issued
Sep 15, 2017
Final sign-off
Sep 23, 2021
Declared cost
$47,000
Address
4801 17th St

soft story retrofitting per sfebc chpater 4d engineering criteria rational method method. 2016 cebc appendix a-4

Open the permit page

$47,000
Sep 8, 2017Completed
final sign-off Jun 2021
3720 Scott Stsoft story retrofit per sfebc chapter 4d rational design method. na for maher.
Details
Permit
201709087324
Status
complete
Filed
Sep 8, 2017
Permit issued
Sep 8, 2017
Final sign-off
Jun 21, 2021
Declared cost
$85,000
Address
3720 Scott St

soft story retrofit per sfebc chapter 4d rational design method. na for maher.

Open the permit page

$85,000
Sep 8, 2017Completed
final sign-off Mar 2021
1925 Chestnut Stsoft story retrofit per sfebc chapter 4d national design method.
Details
Permit
201709087322
Status
complete
Filed
Sep 8, 2017
Permit issued
Sep 8, 2017
Final sign-off
Mar 22, 2021
Declared cost
$85,000
Address
1925 Chestnut St

soft story retrofit per sfebc chapter 4d national design method.

Open the permit page

$85,000
Aug 24, 2017Completed
final sign-off Oct 2017
1400 26th Avsoft story retrofit per 2016 sfebc chapter 4d, other rational design method
Details
Permit
201708245750
Status
complete
Filed
Aug 24, 2017
Permit issued
Aug 25, 2017
Final sign-off
Oct 24, 2017
Declared cost
$48,000
Address
1400 26th Av

soft story retrofit per 2016 sfebc chapter 4d, other rational design method

Open the permit page

$48,000
Jul 20, 2017Completed
final sign-off Dec 2017
2411 23rd Avsoft story retrofitper sfbc chapter 4d, rational design method
Details
Permit
201707202494
Status
complete
Filed
Jul 20, 2017
Permit issued
Jul 21, 2017
Final sign-off
Dec 18, 2017
Declared cost
$65,000
Address
2411 23rd Av

soft story retrofitper sfbc chapter 4d, rational design method

Open the permit page

$65,000
Jun 30, 2017Expired or cancelled
cancelled Apr 2019
241 Cervantes Blsoft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher
Details
Permit
201706300821
Status
cancelled
Filed
Jun 30, 2017
Permit issued
Mar 5, 2019
Declared cost
$28,000
Address
241 Cervantes Bl

soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher

Open the permit page

$28,000
Jan 4, 2017Completed
final sign-off Jun 2017
241 10th Avsoft story retrofitting per sfbc chapter 34 b national design method
Details
Permit
201701046513
Status
complete
Filed
Jan 4, 2017
Permit issued
Jan 6, 2017
Final sign-off
Jun 12, 2017
Declared cost
$65,000
Address
241 10th Av

soft story retrofitting per sfbc chapter 34 b national design method

Open the permit page

$65,000
Jan 4, 2017Completed
final sign-off Feb 2017
1960 Clay Strevision to soft story 201609127356 shear wall instead of steel frame
Details
Permit
201701046514
Status
complete
Filed
Jan 4, 2017
Permit issued
Jan 6, 2017
Final sign-off
Feb 22, 2017
Address
1960 Clay St

revision to soft story 201609127356 shear wall instead of steel frame

Open the permit page

Dec 22, 2016Completed
final sign-off Jun 2017
1133 Dolores Stsoft story retrofit per sfbc chapter 34b engineering criteria for other rational design.
Details
Permit
201612225771
Status
complete
Filed
Dec 22, 2016
Permit issued
Dec 23, 2016
Final sign-off
Jun 12, 2017
Declared cost
$120,000
Address
1133 Dolores St

soft story retrofit per sfbc chapter 34b engineering criteria for other rational design.

Open the permit page

$120,000
Sep 12, 2016Completed
final sign-off Feb 2017
1960 Clay Stsoft story retrofit per sfbc chapter 34b engineering criteria other rational design
Details
Permit
201609127356
Status
complete
Filed
Sep 12, 2016
Permit issued
Sep 16, 2016
Final sign-off
Feb 22, 2017
Declared cost
$49,000
Address
1960 Clay St

soft story retrofit per sfbc chapter 34b engineering criteria other rational design

Open the permit page

$49,000
Aug 19, 2016Completed
final sign-off Nov 2016
1231 16th Avsoft story retrofitting per sfbc chapeter 34b rational design method.
Details
Permit
201608195469
Status
complete
Filed
Aug 19, 2016
Permit issued
Aug 19, 2016
Final sign-off
Nov 30, 2016
Declared cost
$42,000
Address
1231 16th Av

soft story retrofitting per sfbc chapeter 34b rational design method.

Open the permit page

$42,000
Aug 17, 2016Expired or cancelled
cancelled Aug 2018
300 Hill Stsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201608175195
Status
cancelled
Filed
Aug 17, 2016
Permit issued
Sep 9, 2016
Declared cost
$100,000
Address
300 Hill St

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$100,000
Jul 15, 2016Never finaled
issued Jul 2016, no final
2015 Stockton Strevision to pa #201605207985 (soft story retrofit) - relocation of new steel frame.
Details
Permit
201607152437
Status
issued
Filed
Jul 15, 2016
Permit issued
Jul 15, 2016
Address
2015 Stockton St

revision to pa #201605207985 (soft story retrofit) - relocation of new steel frame.

Open the permit page

Jul 15, 2016Completed
final sign-off Nov 2016
438 15th Avsoft story retrofit per sfbc chapter 34b, other rational design method.
Details
Permit
201607152434
Status
complete
Filed
Jul 15, 2016
Permit issued
Jul 15, 2016
Final sign-off
Nov 1, 2016
Declared cost
$59,000
Address
438 15th Av

soft story retrofit per sfbc chapter 34b, other rational design method.

Open the permit page

$59,000
May 20, 2016Completed
final sign-off Sep 2016
2015 Stockton Stsoft story retrofitting per sfbc chapter 34b other rational design.
Details
Permit
201605207985
Status
complete
Filed
May 20, 2016
Permit issued
May 20, 2016
Final sign-off
Sep 20, 2016
Declared cost
$42,000
Address
2015 Stockton St

soft story retrofitting per sfbc chapter 34b other rational design.

Open the permit page

$42,000
Apr 28, 2016Completed
final sign-off Jul 2016
1556 Taylor Stsoft story retrofit per national design method
Details
Permit
201604285975
Status
complete
Filed
Apr 28, 2016
Permit issued
Apr 29, 2016
Final sign-off
Jul 26, 2016
Declared cost
$42,000
Address
1556 Taylor St

soft story retrofit per national design method

Open the permit page

$42,000
Mar 14, 2016Completed
final sign-off Jul 2016
320 11th Avsf soft story seimic upgrade per ordinance 66-13, per sfbc, chapter 34b, 2012 iebc appendix a-4.
Details
Permit
201603141923
Status
complete
Filed
Mar 14, 2016
Permit issued
Jun 30, 2016
Final sign-off
Jul 25, 2016
Declared cost
$8,000
Address
320 11th Av

sf soft story seimic upgrade per ordinance 66-13, per sfbc, chapter 34b, 2012 iebc appendix a-4.

Open the permit page

$8,000
Feb 25, 2016Completed
final sign-off Jun 2016
3049 Sacramento Stsoft storey retrofit per natural dessign method maher na
Details
Permit
201602250458
Status
complete
Filed
Feb 25, 2016
Permit issued
Feb 26, 2016
Final sign-off
Jun 8, 2016
Declared cost
$32,000
Address
3049 Sacramento St

soft storey retrofit per natural dessign method maher na

Open the permit page

$32,000
Jan 26, 2016Completed
final sign-off Jul 2016
4153 20th Stsoft storey retrofit per sfbc chapter 34b per rational design
Details
Permit
201601267940
Status
complete
Filed
Jan 26, 2016
Permit issued
Jan 26, 2016
Final sign-off
Jul 5, 2016
Declared cost
$30,000
Address
4153 20th St

soft storey retrofit per sfbc chapter 34b per rational design

Open the permit page

$30,000
Dec 17, 2015Completed
final sign-off Aug 2016
1901 Beach Stsoft story retrofit per sfbc chapter 34b per other rational design. n/a maher ordinance
Details
Permit
201512175330
Status
complete
Filed
Dec 17, 2015
Permit issued
Dec 17, 2015
Final sign-off
Aug 16, 2016
Declared cost
$30,000
Address
1901 Beach St

soft story retrofit per sfbc chapter 34b per other rational design. n/a maher ordinance

Open the permit page

$30,000
Nov 24, 2015Never finaled
issued Nov 2015, no final
969 Valencia Stsoft story retrofit per sfbc chapter 34b engineering criteria other rational design. accessibility compliance triggered by soft story retrofit. install automatic door opener. maher na
Details
Permit
201511243454
Status
issued
Filed
Nov 24, 2015
Permit issued
Nov 25, 2015
Declared cost
$15,000
Address
969 Valencia St

soft story retrofit per sfbc chapter 34b engineering criteria other rational design. accessibility compliance triggered by soft story retrofit. install automatic door opener. maher na

Open the permit page

$15,000
Nov 24, 2015Completed
final sign-off Feb 2016
969 Valencia Stsoft story retrofit per sfbc chapter 34b engineering criteria other rational design. maher na
Details
Permit
201511243458
Status
complete
Filed
Nov 24, 2015
Permit issued
Nov 25, 2015
Final sign-off
Feb 26, 2016
Declared cost
$30,000
Address
969 Valencia St

soft story retrofit per sfbc chapter 34b engineering criteria other rational design. maher na

Open the permit page

$30,000
Nov 18, 2015Expired or cancelled
cancelled Nov 2018
801 25th Avsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201511182929
Status
cancelled
Filed
Nov 18, 2015
Permit issued
Sep 9, 2016
Declared cost
$28,000
Address
801 25th Av

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$28,000
Nov 18, 2015Completed
final sign-off Sep 2016
491 30th Avsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201511182931
Status
complete
Filed
Nov 18, 2015
Permit issued
Jul 19, 2016
Final sign-off
Sep 20, 2016
Declared cost
$18,000
Address
491 30th Av

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$18,000
Oct 19, 2015Completed
final sign-off Mar 2016
1529 Taylor Stsoft story retrofit per sfbc chapter 34b, other rational design.
Details
Permit
201510190033
Status
complete
Filed
Oct 19, 2015
Permit issued
Oct 20, 2015
Final sign-off
Mar 25, 2016
Declared cost
$28,000
Address
1529 Taylor St

soft story retrofit per sfbc chapter 34b, other rational design.

Open the permit page

$28,000
Oct 5, 2015Completed
final sign-off Jan 2016
2349 27th Avmandatory soft story seismic retrofit on ground floor per chapter 34b rational design method
Details
Permit
201510058809
Status
complete
Filed
Oct 5, 2015
Permit issued
Oct 6, 2015
Final sign-off
Jan 13, 2016
Declared cost
$30,000
Address
2349 27th Av

mandatory soft story seismic retrofit on ground floor per chapter 34b rational design method

Open the permit page

$30,000
Sep 16, 2015Completed
final sign-off Mar 2016
1245 Filbert Stsoft story retroffit per other rational method . n/a for maher
Details
Permit
201509167118
Status
complete
Filed
Sep 16, 2015
Permit issued
Sep 18, 2015
Final sign-off
Mar 22, 2016
Declared cost
$30,000
Address
1245 Filbert St

soft story retroffit per other rational method . n/a for maher

Open the permit page

$30,000
Jul 28, 2015Completed
final sign-off Apr 2016
1490 Chestnut Stsoft story retrofit per other rational design
Details
Permit
201507282597
Status
complete
Filed
Jul 28, 2015
Permit issued
Jul 28, 2015
Final sign-off
Apr 25, 2016
Declared cost
$35,000
Address
1490 Chestnut St

soft story retrofit per other rational design

Open the permit page

$35,000
Jun 1, 2015Completed
final sign-off Nov 2015
400 26th Avsoft story retrofit per rational method.
Details
Permit
201506017594
Status
complete
Filed
Jun 1, 2015
Permit issued
Jun 3, 2015
Final sign-off
Nov 23, 2015
Declared cost
$30,000
Address
400 26th Av

soft story retrofit per rational method.

Open the permit page

$30,000
Apr 28, 2015Completed
final sign-off Sep 2015
274 26th Avsoft story retrofit per sfbc chapter 34b per national method
Details
Permit
201504284759
Status
complete
Filed
Apr 28, 2015
Permit issued
Apr 28, 2015
Final sign-off
Sep 1, 2015
Declared cost
$30,000
Address
274 26th Av

soft story retrofit per sfbc chapter 34b per national method

Open the permit page

$30,000
Apr 7, 2015Completed
final sign-off Jul 2015
367 04th Avsoft story retrofit per sfbc chapter 34b, other rational design.
Details
Permit
201504072933
Status
complete
Filed
Apr 7, 2015
Permit issued
Apr 8, 2015
Final sign-off
Jul 9, 2015
Declared cost
$20,000
Address
367 04th Av

soft story retrofit per sfbc chapter 34b, other rational design.

Open the permit page

$20,000
Jan 29, 2015Completed
final sign-off Feb 2016
160 08th Stsoft story retrofit per sfbc chapter 34b other rational design. n/a ordiance #155-13
Details
Permit
201501296974
Status
complete
Filed
Jan 29, 2015
Permit issued
Jan 30, 2015
Final sign-off
Feb 26, 2016
Declared cost
$30,000
Address
160 08th St

soft story retrofit per sfbc chapter 34b other rational design. n/a ordiance #155-13

Open the permit page

$30,000
Dec 10, 2014Completed
final sign-off Apr 2015
367 Chestnut Stsoft story retrofitting per rational method.
Details
Permit
201412103457
Status
complete
Filed
Dec 10, 2014
Permit issued
Dec 11, 2014
Final sign-off
Apr 15, 2015
Declared cost
$30,000
Address
367 Chestnut St

soft story retrofitting per rational method.

Open the permit page

$30,000
Nov 20, 2014Completed
final sign-off Jul 2015
1560 Great Hysoft story retrofit per sfbc chapter 34b other rational design.
Details
Permit
201411202066
Status
complete
Filed
Nov 20, 2014
Permit issued
Nov 21, 2014
Final sign-off
Jul 8, 2015
Declared cost
$24,000
Address
1560 Great Hy

soft story retrofit per sfbc chapter 34b other rational design.

Open the permit page

$24,000
Nov 10, 2014Completed
final sign-off Feb 2015
523 05th Avsoft story retrofitting per rational design method.
Details
Permit
201411101078
Status
complete
Filed
Nov 10, 2014
Permit issued
Nov 10, 2014
Final sign-off
Feb 6, 2015
Declared cost
$28,000
Address
523 05th Av

soft story retrofitting per rational design method.

Open the permit page

$28,000
Oct 15, 2014Completed
final sign-off Dec 2014
280 Euclid Avsoft story retrofit per sfbc chapter 34b other rational design.
Details
Permit
201410158933
Status
complete
Filed
Oct 15, 2014
Permit issued
Oct 17, 2014
Final sign-off
Dec 16, 2014
Declared cost
$25,000
Address
280 Euclid Av

soft story retrofit per sfbc chapter 34b other rational design.

Open the permit page

$25,000
Sep 8, 2014Completed
final sign-off Mar 2015
305 02nd Avaccessibility compliance triggered by soft story retrofit. upgrade bathroom to full accessible. soft story building permit pa#201409085626
Details
Permit
201409085727
Status
complete
Filed
Sep 8, 2014
Permit issued
Sep 11, 2014
Final sign-off
Mar 10, 2015
Declared cost
$6,000
Address
305 02nd Av

accessibility compliance triggered by soft story retrofit. upgrade bathroom to full accessible. soft story building permit pa#201409085626

Open the permit page

$6,000
Sep 8, 2014Completed
final sign-off Mar 2015
305 02nd Avsoft story retrofit per national design method
Details
Permit
201409085626
Status
complete
Filed
Sep 8, 2014
Permit issued
Sep 8, 2014
Final sign-off
Mar 10, 2015
Declared cost
$20,000
Address
305 02nd Av

soft story retrofit per national design method

Open the permit page

$20,000
Aug 11, 2014Completed
final sign-off Dec 2014
1946 Washington Stsoft story retrofitting per national deisgn method soft story retrofit per sfbc ch 34b); maher n/a
Details
Permit
201408113545
Status
complete
Filed
Aug 11, 2014
Permit issued
Aug 12, 2014
Final sign-off
Dec 2, 2014
Declared cost
$18,000
Address
1946 Washington St

soft story retrofitting per national deisgn method soft story retrofit per sfbc ch 34b); maher n/a

Open the permit page

$18,000
Jul 8, 2014Completed
final sign-off Nov 2014
356 26th Avsoft story retrofitting per national design method. other rational design
Details
Permit
201407080719
Status
complete
Filed
Jul 8, 2014
Permit issued
Jul 10, 2014
Final sign-off
Nov 4, 2014
Declared cost
$17,000
Address
356 26th Av

soft story retrofitting per national design method. other rational design

Open the permit page

$17,000
Jun 16, 2014Completed
final sign-off Sep 2014
1215 Bay Stsoft story retrofit pe national design method.
Details
Permit
201406168416
Status
complete
Filed
Jun 16, 2014
Permit issued
Jun 18, 2014
Final sign-off
Sep 24, 2014
Declared cost
$14,000
Address
1215 Bay St

soft story retrofit pe national design method.

Open the permit page

$14,000
Jun 3, 2014Completed
final sign-off Aug 2014
300 02nd Avsoft story retrofitting per national design method. soft story retrofit per sfbc chapter 34b, other national design.
Details
Permit
201406037335
Status
complete
Filed
Jun 3, 2014
Permit issued
Jun 4, 2014
Final sign-off
Aug 21, 2014
Declared cost
$18,000
Address
300 02nd Av

soft story retrofitting per national design method. soft story retrofit per sfbc chapter 34b, other national design.

Open the permit page

$18,000
Feb 24, 2014Completed
final sign-off May 2014
154 Cole Strevision to pa 201401236911 to clarify the powered door operator control is to be mounted between 36" and 44" above teh finished floor with 30" x 48" adjacent clear floor verify in field existing slope at door not exceeding 1:12
Details
Permit
201402249096
Status
complete
Filed
Feb 24, 2014
Permit issued
Feb 24, 2014
Final sign-off
May 23, 2014
Address
154 Cole St

revision to pa 201401236911 to clarify the powered door operator control is to be mounted between 36" and 44" above teh finished floor with 30" x 48" adjacent clear floor verify in field existing slope at door not exceeding 1:12

Open the permit page

Jan 23, 2014Completed
final sign-off May 2014
154 Cole Stseismic upgrade. of first floor. ada door on separate permit. jjc
Details
Permit
201401236911
Status
complete
Filed
Jan 23, 2014
Permit issued
Jan 23, 2014
Final sign-off
May 23, 2014
Declared cost
$18,000
Address
154 Cole St

seismic upgrade. of first floor. ada door on separate permit. jjc

Open the permit page

$18,000
Dec 18, 2013Completed
final sign-off Jan 2014
1695 20th Avvoluntary install holdowns, anchor bolts and plywood on wall on 1/f only.
Details
Permit
201312184538
Status
complete
Filed
Dec 18, 2013
Permit issued
Dec 26, 2013
Final sign-off
Jan 15, 2014
Declared cost
$5,000
Address
1695 20th Av

voluntary install holdowns, anchor bolts and plywood on wall on 1/f only.

Open the permit page

$5,000
Oct 4, 2013Never finaled
issued Dec 2013, no final
2246 Jones St(1) proposed new retaining wall in front of existing concrete walll with no footing; (2) add 2-c/0205 to (e) 8x10
Details
Permit
201310048573
Status
issued
Filed
Oct 4, 2013
Permit issued
Dec 4, 2013
Declared cost
$8,000
Address
2246 Jones St

(1) proposed new retaining wall in front of existing concrete walll with no footing; (2) add 2-c/0205 to (e) 8x10

Open the permit page

$8,000
Oct 4, 2013Completed
final sign-off May 2014
2238 Jones St(1) proposed new retaining wall in front of existing concrete wall with no footing: (2) replacing (e) damaged 8 x 10 with steel beam.
Details
Permit
201310048570
Status
complete
Filed
Oct 4, 2013
Permit issued
Nov 4, 2013
Final sign-off
May 9, 2014
Declared cost
$8,000
Address
2238 Jones St

(1) proposed new retaining wall in front of existing concrete wall with no footing: (2) replacing (e) damaged 8 x 10 with steel beam.

Open the permit page

$8,000
May 9, 2012Completed
final sign-off May 2012
1410 32nd Avto comply with notice of violation # 201221641. disconnect and detached roof drain leader on west facing exterior wall. no structural work.
Details
Permit
201205090115
Status
complete
Filed
May 9, 2012
Permit issued
May 9, 2012
Final sign-off
May 23, 2012
Declared cost
$500
Address
1410 32nd Av

to comply with notice of violation # 201221641. disconnect and detached roof drain leader on west facing exterior wall. no structural work.

Open the permit page

$500
Nov 18, 2011Completed
final sign-off Dec 2011
1626 North Point Stunit # 101 - kitchen remodel: replace cabinet hood/fan. dgi outlet, count4er, faucet, sink, ceiling light, microwaves, ranges, dishwasher
Details
Permit
201111189220
Status
complete
Filed
Nov 18, 2011
Permit issued
Nov 18, 2011
Final sign-off
Dec 22, 2011
Declared cost
$9,000
Address
1626 North Point St

unit # 101 - kitchen remodel: replace cabinet hood/fan. dgi outlet, count4er, faucet, sink, ceiling light, microwaves, ranges, dishwasher

Open the permit page

$9,000
Aug 5, 2011Completed
final sign-off Dec 2011
525 Cole Stvoluntary structural strengthening at 1st floor
Details
Permit
201108051842
Status
complete
Filed
Aug 5, 2011
Permit issued
Aug 5, 2011
Final sign-off
Dec 21, 2011
Declared cost
$28,000
Address
525 Cole St

voluntary structural strengthening at 1st floor

Open the permit page

$28,000
May 5, 2011Completed
final sign-off Jun 2011
843 Clement Stto install new mens and womens handicapped restroom
Details
Permit
201105055397
Status
complete
Filed
May 5, 2011
Permit issued
May 9, 2011
Final sign-off
Jun 28, 2011
Declared cost
$15,000
Address
843 Clement St

to install new mens and womens handicapped restroom

Open the permit page

$15,000
Dec 3, 2010Completed
final sign-off Feb 2013
1731 15th Stumb strengthening
Details
Permit
201012036049
Status
complete
Filed
Dec 3, 2010
Permit issued
Dec 3, 2010
Final sign-off
Feb 21, 2013
Declared cost
$70,000
Address
1731 15th St

umb strengthening

Open the permit page

$70,000
Sep 28, 2010Completed
final sign-off Mar 2014
1731 15th Stlife safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52.
Details
Permit
201009281752
Status
complete
Filed
Sep 28, 2010
Permit issued
Apr 4, 2012
Final sign-off
Mar 5, 2014
Declared cost
$780,000
Address
1731 15th St

life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52.

Open the permit page

$780,000
Jul 7, 2010Completed
final sign-off Nov 2010
655 05th Avkitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit.
Details
Permit
201007076078
Status
complete
Filed
Jul 7, 2010
Permit issued
Jul 7, 2010
Final sign-off
Nov 1, 2010
Declared cost
$12,000
Address
655 05th Av

kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit.

Open the permit page

$12,000
May 3, 2010Completed
final sign-off Jul 2010
2361 28th Avkitchen remodel: replace cabinets, hood fan,outlet, switch, counter, hardwood floor, disposal, faucets, sink, dishwasher, cooktop, oven. lighting fixtures to comply with title energy codes.
Details
Permit
201005031572
Status
complete
Filed
May 3, 2010
Permit issued
May 3, 2010
Final sign-off
Jul 26, 2010
Declared cost
$9,239
Address
2361 28th Av

kitchen remodel: replace cabinets, hood fan,outlet, switch, counter, hardwood floor, disposal, faucets, sink, dishwasher, cooktop, oven. lighting fixtures to comply with title energy codes.

Open the permit page

$9,239
Nov 18, 2009Completed
final sign-off Jan 2010
217 Virginia Avkitchen: replace cabinet, sink, counter top, faucet, outlet(gfi) switch, light, dishwasher & stove. in-kind, non-structural.
Details
Permit
200911181500
Status
complete
Filed
Nov 18, 2009
Permit issued
Nov 18, 2009
Final sign-off
Jan 4, 2010
Declared cost
$10,800
Address
217 Virginia Av

kitchen: replace cabinet, sink, counter top, faucet, outlet(gfi) switch, light, dishwasher & stove. in-kind, non-structural.

Open the permit page

$10,800
Oct 5, 2009Completed
final sign-off Nov 2009
1616 16th Avnew sill anchor bolt on (e) wall footing
Details
Permit
200910058328
Status
complete
Filed
Oct 5, 2009
Permit issued
Oct 5, 2009
Final sign-off
Nov 9, 2009
Declared cost
$3,800
Address
1616 16th Av

new sill anchor bolt on (e) wall footing

Open the permit page

$3,800
Sep 14, 2009Completed
final sign-off Dec 2009
1850 Sacramento Stbathroom upgrade: replace toilet, sink, faucet ceiling light, switch. gfi outlet, towel bar tile.
Details
Permit
200909146720
Status
complete
Filed
Sep 14, 2009
Permit issued
Sep 14, 2009
Final sign-off
Dec 1, 2009
Declared cost
$4,500
Address
1850 Sacramento St

bathroom upgrade: replace toilet, sink, faucet ceiling light, switch. gfi outlet, towel bar tile.

Open the permit page

$4,500