K L Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Oct 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2012 | Completed final sign-off Oct 2012 | 308 Jessie St | replace 4" single detector check valve to 4" double check back flow preventer w/bypass meter for fire service. flush required.Details
replace 4" single detector check valve to 4" double check back flow preventer w/bypass meter for fire service. flush required. | $2,000 |
| Apr 25, 2012 | Completed final sign-off Jun 2012 | 740 Valencia St | as built drawings for fire sprinkler work under 201107261043, r1 front office and retail space sprinkler piping revised and added coverage for two new bathroomsDetails
as built drawings for fire sprinkler work under 201107261043, r1 front office and retail space sprinkler piping revised and added coverage for two new bathrooms | |
| Jul 26, 2011 | Completed final sign-off Oct 2012 | 740 Valencia St | install fire sprinkler systems for remodeled commercial spaces per nfpa-13. includes 4-inch underground fire service.Details
install fire sprinkler systems for remodeled commercial spaces per nfpa-13. includes 4-inch underground fire service. | $10,000 |