K L Construction Inc./Pls Check Id./Note
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Aug 2013
- Last 24 months
- 0 permits filed
87 permits since 2000: 82 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2013 | Expired or cancelled expired Jan 2015 | 2750 Union St | remove and replace non-load bearing wall as you enter the foyer and walk in thru the garage on the left. revision: to permit # 201205079895. (1) divide (e) hall into 2 spaces (n) hall & (n) foyer. (2) shift window #1 (3) add closet (4) add radiant (5) add lightingDetails
remove and replace non-load bearing wall as you enter the foyer and walk in thru the garage on the left. revision: to permit # 201205079895. (1) divide (e) hall into 2 spaces (n) hall & (n) foyer. (2) shift window #1 (3) add closet (4) add radiant (5) add lighting | $5,000 |
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 136 Whitney St | remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes.Details
remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes. | $18,277 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 726 23rd Av | remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flrDetails
remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flr | $15,000 |
| Jan 23, 2013 | Completed final sign-off May 2013 | 218 Molimo Dr | remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house.Details
remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house. | $16,000 |
| Dec 17, 2012 | Completed final sign-off Sep 2013 | 3101 Harrison St | change 3 windows ( enlarge 2 for escape, replace one in kind for escape.) replace security gates (openable from interior at 1st floor). change 4 windows at 2nd floor in kindDetails
change 3 windows ( enlarge 2 for escape, replace one in kind for escape.) replace security gates (openable from interior at 1st floor). change 4 windows at 2nd floor in kind | $5,000 |
| Dec 12, 2012 | Completed final sign-off Sep 2013 | 3101 Harrison St | remodel bathroom & laundry for the unit, lighting shall comply w/title 24.Details
remodel bathroom & laundry for the unit, lighting shall comply w/title 24. | $9,000 |
| Dec 3, 2012 | Completed final sign-off Sep 2013 | 3101 Harrison St | remodel 3 bathrooms @ #3101a, 3103, 3103a. repair some stucco, about 200 sq.ft. in front, install r-19 for ceiling.Details
remodel 3 bathrooms @ #3101a, 3103, 3103a. repair some stucco, about 200 sq.ft. in front, install r-19 for ceiling. | $25,000 |
| Aug 28, 2012 | Completed final sign-off Oct 2012 | 630 06th Av | change cabinets and upgrade for the kitchen.Details
change cabinets and upgrade for the kitchen. | $9,000 |
| Aug 6, 2012 | Completed final sign-off Nov 2012 | 286 Bella Vista Wy | remodel kitchen & laundry room. replace 1 window & door at rear wall. (window and door are not visible on the street).Details
remodel kitchen & laundry room. replace 1 window & door at rear wall. (window and door are not visible on the street). | $9,000 |
| Aug 1, 2012 | Completed final sign-off Nov 2012 | 208 Clement St | relocate e toilet to become a handicap accessible toilet. add a mop sink and a handsink in kitchen areaDetails
relocate e toilet to become a handicap accessible toilet. add a mop sink and a handsink in kitchen area | $10,000 |
| Jun 22, 2012 | Completed final sign-off Sep 2012 | 1386 40th Av | remodel gr floor. add bedroom, family room, full bath, and storage roomDetails
remodel gr floor. add bedroom, family room, full bath, and storage room | $40,000 |
| Jun 19, 2012 | Completed final sign-off Aug 2012 | 515 21st Av | all work to comply with inspection report #cc-7082Details
all work to comply with inspection report #cc-7082 | $2,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 249 Richland Av | replace 5 windows in front of the house in kind, wood windowsDetails
replace 5 windows in front of the house in kind, wood windows | $3,200 |
| Mar 21, 2012 | Completed final sign-off Apr 2012 | 348 17th Av | replace some broken deck wood at rear yard. less 50%, about 50 sq. ft. redwood.Details
replace some broken deck wood at rear yard. less 50%, about 50 sq. ft. redwood. | $2,500 |
| Jan 30, 2012 | Completed final sign-off Apr 2012 | 882 North Point St | revision to pa #201110046050 - relcoate sink/equipments location, deleted range, fryer grille & canopy hood. install new lighting for kitchen/dining area. comply w/complaint #200005263, 200005105 & 200005264.Details
revision to pa #201110046050 - relcoate sink/equipments location, deleted range, fryer grille & canopy hood. install new lighting for kitchen/dining area. comply w/complaint #200005263, 200005105 & 200005264. | $20,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 2728 Irving St | remodel two bathrooms. one on the second floor. one on the third floor. existing walls to remain without modifications. lighting will comply w/cec 150(k). 10.Details
remodel two bathrooms. one on the second floor. one on the third floor. existing walls to remain without modifications. lighting will comply w/cec 150(k). 10. | $15,000 |
| Dec 21, 2011 | Never finaled issued Dec 2011, no final | 491 Frederick St | replace one outside wooden ladder with metal ladder in the stair way go to the roof. paint south wall at back side of building.Details
replace one outside wooden ladder with metal ladder in the stair way go to the roof. paint south wall at back side of building. | $5,000 |
| Nov 21, 2011 | Completed final sign-off Nov 2011 | 2839 Pierce St | unit #1-change broken wood for the landing at rear in kind, less than 50% of repair. deck is less than 30" from gradeDetails
unit #1-change broken wood for the landing at rear in kind, less than 50% of repair. deck is less than 30" from grade | $1,200 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit.Details
remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit. | $35,301 |
| Oct 4, 2011 | Completed final sign-off Apr 2012 | 882 North Point St | upgrade ada restroom, add kitchen in ground floor & change a part of occupant retail space into black point cafe.Details
upgrade ada restroom, add kitchen in ground floor & change a part of occupant retail space into black point cafe. | $50,000 |
| Sep 30, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | open wall between kitchen and dining. add beam and posts. remodel kitchen. remove non bearing wall at upstairs bedroom. add closet. widen misc closet doors. gen mep ugrades.Details
open wall between kitchen and dining. add beam and posts. remodel kitchen. remove non bearing wall at upstairs bedroom. add closet. widen misc closet doors. gen mep ugrades. | $9,700 |
| Sep 27, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | remodel and replace kitchen cabinets and tile floor. some sheetrock about 20 sq ft on kitchen wall. for exploratory purpose. kitchen remodel will be under seperate permit.Details
remodel and replace kitchen cabinets and tile floor. some sheetrock about 20 sq ft on kitchen wall. for exploratory purpose. kitchen remodel will be under seperate permit. | $1,000 |
| Sep 23, 2011 | Completed final sign-off Nov 2011 | 906 Vallejo St | voluntary upgrade of ceiling framing above 3rd floor.Details
voluntary upgrade of ceiling framing above 3rd floor. | $3,000 |
| Aug 30, 2011 | Completed final sign-off Oct 2011 | 2424 Polk St | repair sagging ceiling mitigate, space to remain vacant per ab-017Details
repair sagging ceiling mitigate, space to remain vacant per ab-017 | $5,000 |
| Aug 12, 2011 | Completed final sign-off Nov 2011 | 491 Frederick St | repair rear stair in kind, less than 50% for decking, post, joist and railing.Details
repair rear stair in kind, less than 50% for decking, post, joist and railing. | $5,000 |
| Jul 13, 2011 | Never finaled issued Jul 2011, no final | 902 Vallejo St | replace 60 windows in building. same size, wood windows. dual glassDetails
replace 60 windows in building. same size, wood windows. dual glass | $20,000 |
| Jul 1, 2011 | Completed final sign-off Nov 2011 | 906 Vallejo St | remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor.Details
remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor. | $22,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 2370 California St | remodel kitchen. no structural work.Details
remodel kitchen. no structural work. | $9,000 |
| May 31, 2011 | Completed final sign-off Aug 2011 | 888 North Point St | remove partial partition wall at ground/2nd floor and construct new partition at gr floor show roomDetails
remove partial partition wall at ground/2nd floor and construct new partition at gr floor show room | $18,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 135 Fernwood Dr | replace 5 windows in kind. visible from the street & repair stucco about 250 sq ft.Details
replace 5 windows in kind. visible from the street & repair stucco about 250 sq ft. | $3,000 |
| May 11, 2011 | Completed final sign-off May 2012 | 80 Glover St | replace four windows in front the window, same size, vinyl window, u-factor .40 maxDetails
replace four windows in front the window, same size, vinyl window, u-factor .40 max | $1,200 |
| Mar 15, 2011 | Completed final sign-off Sep 2011 | 135 Fernwood Dr | voluntary structural strengthening of west wallDetails
voluntary structural strengthening of west wall | $9,500 |
| Feb 18, 2011 | Completed final sign-off Apr 2011 | 787 Edinburgh St | remodel kitchen upstairs, no structure work, replace cabinet and new lighting comply with cec 150(k)Details
remodel kitchen upstairs, no structure work, replace cabinet and new lighting comply with cec 150(k) | $8,000 |
| Jan 31, 2011 | Completed final sign-off Sep 2011 | 1663 11th Av | remodel one bathroom at upstair, no structural work, no wall relocation. high efficacy lighting or occupancy sensor control.Details
remodel one bathroom at upstair, no structural work, no wall relocation. high efficacy lighting or occupancy sensor control. | $7,000 |
| Jan 6, 2011 | Completed final sign-off Apr 2012 | 479 21st Av | remodel ground floor. add 1/2 bathroom and relocate laundryDetails
remodel ground floor. add 1/2 bathroom and relocate laundry | $15,000 |
| Nov 29, 2010 | Completed final sign-off Nov 2011 | 331 Ellsworth St | repair some dryrot wood in basement, no other work.Details
repair some dryrot wood in basement, no other work. | $2,000 |
| Nov 5, 2010 | Completed final sign-off Oct 2011 | 2424 Polk St | window enlargement and new french doors at the rear wall with a special moment resisting frame. the space will remain vacant per sfbc ab-017 (vacant spaces)Details
window enlargement and new french doors at the rear wall with a special moment resisting frame. the space will remain vacant per sfbc ab-017 (vacant spaces) | $19,000 |
| Oct 8, 2010 | Completed final sign-off Nov 2010 | 127 Ellert St | cosmetic repair "39" lin ft of existing footings, bolt foundations thruout basement/ground floor.Details
cosmetic repair "39" lin ft of existing footings, bolt foundations thruout basement/ground floor. | $4,086 |
| Sep 1, 2010 | Completed final sign-off Nov 2010 | 127 Ellert St | repair front stairs in kind, repair landings, balconies, posts, footings, stringers, treads, risers where needed. raise guardrail and handrails. replace bulustrades with new vertical wood members 3 7/8" max clearance betwn membersDetails
repair front stairs in kind, repair landings, balconies, posts, footings, stringers, treads, risers where needed. raise guardrail and handrails. replace bulustrades with new vertical wood members 3 7/8" max clearance betwn members | $6,000 |
| Aug 4, 2010 | Completed final sign-off Aug 2010 | 962 Greenwich St | work on #862 only - change some wall studs at interior door inside sunroom. broken wood, install sheetrock for sunroom.Details
work on #862 only - change some wall studs at interior door inside sunroom. broken wood, install sheetrock for sunroom. | $2,000 |
| Jun 22, 2010 | Completed final sign-off Dec 2010 | 355 Yerba Buena Av | remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 bathsDetails
remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 baths | $50,000 |
| Jun 21, 2010 | Completed final sign-off Jun 2011 | 3044 Alemany Bl | change some broken cabinets and countertop. no structural work, no other work. (if lighting chantges must comply with cec 150 (k).Details
change some broken cabinets and countertop. no structural work, no other work. (if lighting chantges must comply with cec 150 (k). | $1,500 |
| Jun 14, 2010 | Completed final sign-off May 2011 | 2424 Polk St | remove some partition wall, repair broken sheetrock. no structural work. print outside wall per ab-017.Details
remove some partition wall, repair broken sheetrock. no structural work. print outside wall per ab-017. | $3,000 |
| May 7, 2010 | Completed final sign-off Aug 2010 | 1824 Ortega St | repair stucco on front of house (about 200 sq ft)Details
repair stucco on front of house (about 200 sq ft) | $2,000 |
| Apr 20, 2010 | Completed final sign-off Aug 2010 | 1954 23rd Av | remodel gr floor. legalize playroom and bedroom. add full bath. no wet bar.Details
remodel gr floor. legalize playroom and bedroom. add full bath. no wet bar. | $20,000 |
| Apr 14, 2010 | Completed final sign-off Oct 2010 | 45 Parker Av | change some broken tile on 2nd floor bathroom & paint exterior wall. no change lighting.Details
change some broken tile on 2nd floor bathroom & paint exterior wall. no change lighting. | $2,000 |
| Mar 18, 2010 | Completed final sign-off Feb 2011 | 3025 Ulloa St | second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl.Details
second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl. | $20,000 |
| Mar 2, 2010 | Never finaled issued Mar 2010, no final | 39 Cervantes Bl | remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k).Details
remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k). | $15,000 |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 3421 Geary Bl | interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per planDetails
interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per plan | $16,000 |
| Oct 2, 2009 | Completed final sign-off Dec 2009 | 1240 Willard St | remodel one kitchen and 1 1/2 bathroom. no structural workDetails
remodel one kitchen and 1 1/2 bathroom. no structural work | $15,000 |
| Sep 29, 2009 | Completed final sign-off May 2010 | 1431 33rd Av | ground floor-infill room, add 2 bedrooms, 2 1/2 bathrooms, family room, laundry & storage room. 2nd floor-add 2 bathroom & remodel (e) bathroomDetails
ground floor-infill room, add 2 bedrooms, 2 1/2 bathrooms, family room, laundry & storage room. 2nd floor-add 2 bathroom & remodel (e) bathroom | $70,000 |
| Sep 22, 2009 | Completed final sign-off Feb 2010 | 601 Van Ness Av | suite 2090: remodel law office's existing kitchenDetails
suite 2090: remodel law office's existing kitchen | $10,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 520 02nd Av | in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage.Details
in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage. | $15,000 |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 1779 Lombard St | reroofingDetails
reroofing | $6,000 |
| Aug 27, 2009 | Completed final sign-off Aug 2009 | 1278 17th Av | to obtain final inspection for work approved under pa #200204184357, all work is completed.Details
to obtain final inspection for work approved under pa #200204184357, all work is completed. | |
| Aug 27, 2009 | Completed final sign-off Sep 2009 | 1278 17th Av | to obtain final inspection for work approved under pa #200203201930, all work is completed.Details
to obtain final inspection for work approved under pa #200203201930, all work is completed. | |
| Jun 1, 2009 | Completed final sign-off Nov 2009 | 888 North Point St | remvoe partial interior partition wall at ground floor & replace 2 furnace with new.Details
remvoe partial interior partition wall at ground floor & replace 2 furnace with new. | $8,000 |
| Apr 1, 2009 | Completed final sign-off Jul 2009 | 1842 Stockton St | work @ unit# 1842 only. remodel bathroom. upgrade plumbing & electrical for bathroom. tile. no structural change.Details
work @ unit# 1842 only. remodel bathroom. upgrade plumbing & electrical for bathroom. tile. no structural change. | $9,000 |
| Mar 10, 2009 | Completed final sign-off Jul 2009 | 280 Anzavista Av | remodel kitchen, no structural work. no other work under this permit.Details
remodel kitchen, no structural work. no other work under this permit. | $8,000 |
| Feb 2, 2009 | Completed final sign-off Feb 2009 | 1738 La Salle Av | to comply w/ nov #200788233, replace existing damaged rear deck & front stairs in kind, existing footing to be remained.Details
to comply w/ nov #200788233, replace existing damaged rear deck & front stairs in kind, existing footing to be remained. | $5,000 |
| Jan 2, 2009 | Completed final sign-off Apr 2009 | 35 Hillcrest Ct | replace some broken wood for deck. railing & decking.Details
replace some broken wood for deck. railing & decking. | $3,000 |
| Dec 4, 2008 | Completed final sign-off Feb 2009 | 249 Richland Av | relocation of toilet, sink, keep bathtub. upgrade electrical for the bathroom.Details
relocation of toilet, sink, keep bathtub. upgrade electrical for the bathroom. | $8,838 |
| Dec 4, 2008 | Completed final sign-off Apr 2009 | 1263 Noe St | remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work.Details
remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work. | $17,188 |
| Nov 4, 2008 | Completed final sign-off Feb 2009 | 55 San Rafael Wy | remodel kitchen. change cabinets. electrical plugs & lights.Details
remodel kitchen. change cabinets. electrical plugs & lights. | $8,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 35 Hillcrest Ct | replace 7 windows for the house. same size & location. 4 visible from the street u value <.67. same materials in kind.Details
replace 7 windows for the house. same size & location. 4 visible from the street u value <.67. same materials in kind. | $2,500 |
| Aug 13, 2008 | Completed final sign-off Sep 2008 | 35 Hillcrest Ct | replace some stucco in kind, in front the house. replace some stucco to hardiplank in front the house (upper park). replace stucco to hardiplank in southwest side and back side of the hosue because these side wall is leakingDetails
replace some stucco in kind, in front the house. replace some stucco to hardiplank in front the house (upper park). replace stucco to hardiplank in southwest side and back side of the hosue because these side wall is leaking | $30,000 |
| Jul 7, 2008 | Completed final sign-off Nov 2008 | 2663 23rd Av | remodel (1), (1) kitchen. no structural work. same location. no changes to window or door.Details
remodel (1), (1) kitchen. no structural work. same location. no changes to window or door. | $9,000 |
| Jul 7, 2008 | Completed final sign-off Oct 2008 | 355 Campbell Av | remodel (1) kitchen . no structural work, same location.Details
remodel (1) kitchen . no structural work, same location. | $6,000 |
| Jun 16, 2008 | Completed final sign-off Oct 2008 | 2518 31st Av | revision to 200710266513. revise existing permit per inspector to change rear building fenestration @ 1st floor by relocating patio door and window to ends. existing 2 windows in middle to remain/replaced.Details
revision to 200710266513. revise existing permit per inspector to change rear building fenestration @ 1st floor by relocating patio door and window to ends. existing 2 windows in middle to remain/replaced. | $1,500 |
| Apr 28, 2008 | Completed final sign-off Jul 2008 | 3644 24th St | work @ unit# 3644 only. remodel kitchen. bathroom. laundry.Details
work @ unit# 3644 only. remodel kitchen. bathroom. laundry. | $20,000 |
| Mar 27, 2008 | Completed final sign-off Oct 2008 | 1105 Stanyan St | remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work.Details
remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work. | $55,000 |
| Feb 22, 2008 | Completed final sign-off Jul 2008 | 1646 23rd Av | construct one bed room, sitting area and one full bath room at ground floor within building envelope. no structural changes.Details
construct one bed room, sitting area and one full bath room at ground floor within building envelope. no structural changes. | $38,000 |
| Feb 22, 2008 | Completed final sign-off Apr 2008 | 1840 Stockton St | correct all items, refer to 3r-5058. fix sheetrock holes, install weather stripping for doors, landing, battery smoke alarms.Details
correct all items, refer to 3r-5058. fix sheetrock holes, install weather stripping for doors, landing, battery smoke alarms. | $7,000 |
| Oct 26, 2007 | Completed final sign-off Oct 2008 | 2518 31st Av | remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed.Details
remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed. | $58,520 |
| Sep 20, 2007 | Completed final sign-off Dec 2007 | 571 11th Av | discovered dry-rot & many stucco cracks in kind. stucco repair. during windows replacement under issued pa# 2007/02/20/0263. non structural work. this permit is to re-stucco (approx 380 sq. ft) existing front exterior wall.Details
discovered dry-rot & many stucco cracks in kind. stucco repair. during windows replacement under issued pa# 2007/02/20/0263. non structural work. this permit is to re-stucco (approx 380 sq. ft) existing front exterior wall. | $4,000 |
| Aug 20, 2007 | Completed final sign-off Dec 2007 | 571 11th Av | change front windows. repair stucco (6 total) with wood windows (in kind).Details
change front windows. repair stucco (6 total) with wood windows (in kind). | $5,000 |
| Jul 19, 2007 | Completed final sign-off Aug 2007 | 205 Caselli Av | remodel bathroom for 205 caselli. change faucet, sink toilet, tile lights. no structural work, new lights to be fluorescant or unoccupant sensorDetails
remodel bathroom for 205 caselli. change faucet, sink toilet, tile lights. no structural work, new lights to be fluorescant or unoccupant sensor | $6,454 |
| Jun 11, 2007 | Completed final sign-off Aug 2007 | 1663 11th Av | remodel existing kitchen. remove existing cabinets. upgrade electrical. install sheetrock, cabinets and plumbing fixture.Details
remodel existing kitchen. remove existing cabinets. upgrade electrical. install sheetrock, cabinets and plumbing fixture. | $8,500 |
| Jun 1, 2007 | Completed final sign-off Sep 2007 | 883 27th Av | revision to pa#200704138744 to remove & replace (e) plaster with new 5/8 sheetrock on (e) 2nd floor wall & ceiling due to extensive electrical upgrade.Details
revision to pa#200704138744 to remove & replace (e) plaster with new 5/8 sheetrock on (e) 2nd floor wall & ceiling due to extensive electrical upgrade. | $60,000 |
| Apr 13, 2007 | Completed final sign-off Sep 2007 | 883 27th Av | remodel ktichen, bathroom & add one bathroom @ 1/f. infill under one of bedroom and add one bedroom, family room, 2 bathroom, storage room, laundry room @ g/f.Details
remodel ktichen, bathroom & add one bathroom @ 1/f. infill under one of bedroom and add one bedroom, family room, 2 bathroom, storage room, laundry room @ g/f. | $78,000 |
| Mar 7, 2007 | Completed final sign-off Aug 2007 | 9 Tracy Pl | repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unitDetails
repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unit | $32,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 1 Daniel Burnham Ct | bathroom faucet, sink, tile (remodel) (n) shower, reuse (e) toilet. (2) bath remodel. non structural work.Details
bathroom faucet, sink, tile (remodel) (n) shower, reuse (e) toilet. (2) bath remodel. non structural work. | $15,000 |
| Oct 10, 2006 | Completed final sign-off Mar 2007 | 207 Caselli Av | remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apartDetails
remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apart | $10,250 |
| Jul 11, 2006 | Completed final sign-off Sep 2006 | 1842 Stockton St | replace kitchen counters & cabinets, relocate kitchen.path door , neew location of wate heater, cover up pantry window. new vent duck to stove, minor new electrical work (*new gfi's etc.) minor wll patching no structural changes. (all noted on drawing. a-1.)Details
replace kitchen counters & cabinets, relocate kitchen.path door , neew location of wate heater, cover up pantry window. new vent duck to stove, minor new electrical work (*new gfi's etc.) minor wll patching no structural changes. (all noted on drawing. a-1.) | $10,000 |
| Mar 3, 2006 | Completed final sign-off Apr 2006 | 1638 23rd Av | bathroom added in basement, 1st floor of sunset homeDetails
bathroom added in basement, 1st floor of sunset home | $9,000 |
| Nov 8, 2005 | Completed final sign-off Dec 2005 | 394 Hearst Av | remodel bath on 2nd flr. change fixtures,vanity, wall coverings. no change to partitions or windowsDetails
remodel bath on 2nd flr. change fixtures,vanity, wall coverings. no change to partitions or windows | $5,000 |
| Sep 6, 2005 | Completed final sign-off Oct 2005 | 2231 Rivera St | remodel kitchen. put in new cabinet and countertop. new appliances. no structural work. provide flouDetails
remodel kitchen. put in new cabinet and countertop. new appliances. no structural work. provide flou | $10,000 |