K L Construction
- Based in
- Livermore
- On San Francisco permits
- Jan 2007 to Apr 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2013 | Completed final sign-off Aug 2013 | 55 Cityview Wy | remove old kitchen cabinets and replace with new. full kitchen remodel. new counter top appliances.Details
remove old kitchen cabinets and replace with new. full kitchen remodel. new counter top appliances. | $16,500 |
| Jun 11, 2009 | Completed final sign-off Nov 2010 | 35 Skyview Wy | remodel unfinished basement. 1 family room, 1 bedroom, 1 bathroom, 1 laundry room. new interior staircase, partial replacement of existing wood posts and beam with steel posts and beam. replacment of garage door, windows, gas furnace, ac unit, electerical and plumbing.Details
remodel unfinished basement. 1 family room, 1 bedroom, 1 bathroom, 1 laundry room. new interior staircase, partial replacement of existing wood posts and beam with steel posts and beam. replacment of garage door, windows, gas furnace, ac unit, electerical and plumbing. | $30,000 |
| May 20, 2009 | Completed final sign-off Jun 2009 | 9 Saturn St | replace 3 vertical post and 1 4x12 beam on 2nd floor wood to be df#1. replace in kind . total replacement of strucure to be 50% total or less.Details
replace 3 vertical post and 1 4x12 beam on 2nd floor wood to be df#1. replace in kind . total replacement of strucure to be 50% total or less. | $3,500 |
| May 7, 2009 | Completed final sign-off Jun 2009 | 9 Saturn St | replace 1 deck post due to dry rot. replace in kind. provide necessary shoring.Details
replace 1 deck post due to dry rot. replace in kind. provide necessary shoring. | $2,000 |
| Sep 19, 2008 | Completed final sign-off Nov 2008 | 9 Saturn St | add 2 electrical circuit for washer & a injection pump extend gas line 10' l.f. and add drainage & an injection pump.Details
add 2 electrical circuit for washer & a injection pump extend gas line 10' l.f. and add drainage & an injection pump. | $1,200 |
| Jan 11, 2007 | Completed final sign-off Nov 2007 | 720 York St | unit #210-tear out (e) 1 kitchen, 1 bath and update design. extend mezzanini approx 3' to push stairs out to accomodate new kitchen.Details
unit #210-tear out (e) 1 kitchen, 1 bath and update design. extend mezzanini approx 3' to push stairs out to accomodate new kitchen. | $38,000 |