K H Construction
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to Feb 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2022 | Completed final sign-off Mar 2023 | 2102 Irving St | revision to approved permit #202103297456 install new condensing units at roof 241 lbs for new cooler below. two unitsDetails
revision to approved permit #202103297456 install new condensing units at roof 241 lbs for new cooler below. two units | $500 |
| Mar 29, 2021 | Completed final sign-off Aug 2021 | 2102 Irving St | remodel extg tenant space from hair salon to retail; finish floor and wall, remodel/upgrade extg unisex restroom and install new equipments and fixtures, upgrade extg electrical.Details
remodel extg tenant space from hair salon to retail; finish floor and wall, remodel/upgrade extg unisex restroom and install new equipments and fixtures, upgrade extg electrical. | $50,000 |
| Jul 12, 2012 | Completed final sign-off Jul 2012 | 2046 32nd Av | revision to 201110035956 to increase job cost from 6000 to 30,000Details
revision to 201110035956 to increase job cost from 6000 to 30,000 | |
| Oct 3, 2011 | Completed final sign-off Jul 2012 | 2046 32nd Av | comply w/nov 201131881 - legalize (e) bathroom & bedroom @ ground floor - new shower stall & replace fixtures including elect work. install 1-hr wall & ceiling @ ground floor & metal strap to (e) water heater. remodel bath & kit. @ 2nd. flr.Details
comply w/nov 201131881 - legalize (e) bathroom & bedroom @ ground floor - new shower stall & replace fixtures including elect work. install 1-hr wall & ceiling @ ground floor & metal strap to (e) water heater. remodel bath & kit. @ 2nd. flr. | $6,000 |
| Jan 15, 2003 | Completed final sign-off Feb 2003 | 3552 23rd St | repair deck and replace the existing footing and wood posts no new deck additionDetails
repair deck and replace the existing footing and wood posts no new deck addition | $6,000 |
| Apr 14, 2000 | Completed final sign-off Sep 2000 | 190 11th Av | kitchen remodel, replace plaster wall, install new cabinetsDetails
kitchen remodel, replace plaster wall, install new cabinets | $12,000 |