K C Engineering Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Oct 2011
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 7 never finaled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2011 | Never finaled issued Oct 2011, no final | 37 Edna St | revision to 201102281050 ground fl: add door rear/side interior gr fl, relocate water heater and furnace location.Details
revision to 201102281050 ground fl: add door rear/side interior gr fl, relocate water heater and furnace location. | $2,000 |
| Sep 26, 2011 | Never finaled issued Sep 2011, no final | 758 40th Av | replace floortile. reolcate water heater portion of sheet rock for existing walls. 1st/2nd fl new toiletsDetails
replace floortile. reolcate water heater portion of sheet rock for existing walls. 1st/2nd fl new toilets | $4,000 |
| Sep 20, 2011 | Never finaled issued Sep 2011, no final | 1936 Ocean Av | bathroom tile (36 sq ft). repair electrical outlets, lights (repair only no new switches and recepticles). water heater install.Details
bathroom tile (36 sq ft). repair electrical outlets, lights (repair only no new switches and recepticles). water heater install. | $2,000 |
| Aug 25, 2011 | Never finaled issued Aug 2011, no final | 3665 Mission St | comply with complaint #201150897-remodel (e) entry way & remove non bearing partition wallDetails
comply with complaint #201150897-remodel (e) entry way & remove non bearing partition wall | $1,500 |
| Aug 17, 2011 | Never finaled issued Aug 2011, no final | 1003 Shotwell St | replace new kitchen cabinets, counter top, floor tile, bathrooms floor tile, portion of new sheetrock, repair broken doors, windows, walls and exhuast fan, repair electrical outlets, heats.Details
replace new kitchen cabinets, counter top, floor tile, bathrooms floor tile, portion of new sheetrock, repair broken doors, windows, walls and exhuast fan, repair electrical outlets, heats. | $4,000 |
| Aug 2, 2011 | Never finaled issued Aug 2011, no final | 1007 Shotwell St | new walls in garage for storage, repl garage doors 2 each, laundry room, carbon monoxide (co) alarms shall be provided per cbc 2010, section 420.1Details
new walls in garage for storage, repl garage doors 2 each, laundry room, carbon monoxide (co) alarms shall be provided per cbc 2010, section 420.1 | $2,000 |
| Feb 28, 2011 | Never finaled issued Mar 2011, no final | 37 Edna St | add 3 bedrooms. 1 full bathroom on the first/garage floorDetails
add 3 bedrooms. 1 full bathroom on the first/garage floor | $20,000 |
| Nov 12, 2010 | Completed final sign-off Mar 2011 | 940 Bush St | remodel skin care rooms, remodel restrooms, add body sciub/room.Details
remodel skin care rooms, remodel restrooms, add body sciub/room. | $10,000 |
| Sep 13, 2010 | Completed final sign-off Feb 2011 | 1336 09th Av | installation of mechanical hood in extg restaurant type i hood 8x4 stainless stove. provide ada power door opener & ramp per ab-011 & ab-012.Details
installation of mechanical hood in extg restaurant type i hood 8x4 stainless stove. provide ada power door opener & ramp per ab-011 & ab-012. | $50,000 |
| Apr 14, 2010 | Completed final sign-off Apr 2011 | 5570 Mission St | unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocksDetails
unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocks | $5,000 |
| Mar 8, 2010 | Completed final sign-off Jan 2012 | 7 Leroy Pl | basement addition: add 3-bedrooms, 2-bathrooms, one storage. stairway connect to 1 flr. of unit #15. remove portion wall @ kitchen & livig room.Details
basement addition: add 3-bedrooms, 2-bathrooms, one storage. stairway connect to 1 flr. of unit #15. remove portion wall @ kitchen & livig room. | $60,000 |
| Aug 24, 2009 | Completed final sign-off Oct 2009 | 1429 Polk St | add rooms on 1st floor. 3 facial rooms, 1 waxing room, and 2 showers (1 room).Details
add rooms on 1st floor. 3 facial rooms, 1 waxing room, and 2 showers (1 room). | $33,000 |