K B Maintenance
- Based in
- San Mateo
- On San Francisco permits
- Sep 2011 to Oct 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2016 | Completed final sign-off Jan 2017 | 666 Post St | unit 1601 - bathroom & kitchen remodel - non structural work. replace cabinets, appliances, new finishesDetails
unit 1601 - bathroom & kitchen remodel - non structural work. replace cabinets, appliances, new finishes | $25,000 |
| Sep 15, 2015 | Completed final sign-off May 2016 | 1025 South Van Ness Av | compliance w/ mandatory soft story seismic retrofit program 2013 sfbc sec 34b and program 2012 iebc appendix a-4.Details
compliance w/ mandatory soft story seismic retrofit program 2013 sfbc sec 34b and program 2012 iebc appendix a-4. | $30,000 |
| Feb 21, 2014 | Completed final sign-off Mar 2014 | 320 Gates St | to comply with notice of violation #201451801. to repair approx. 80 sq. ft. of dry-rot siding/paneling and replacement of stairs and landing to access storage shed. nov & actual work location are of different addresses/same owner.Details
to comply with notice of violation #201451801. to repair approx. 80 sq. ft. of dry-rot siding/paneling and replacement of stairs and landing to access storage shed. nov & actual work location are of different addresses/same owner. | $3,500 |
| Sep 13, 2011 | Completed final sign-off Sep 2011 | 35 Brunswick St | install foundation bolts in existing mud sill with epoxy. 5/8" dia bolts, 12" long embedrment 7" with 3x3 sq washers, r' spacing, 50' in length foundation to be boltedDetails
install foundation bolts in existing mud sill with epoxy. 5/8" dia bolts, 12" long embedrment 7" with 3x3 sq washers, r' spacing, 50' in length foundation to be bolted | $1,300 |