Justin Brodowski Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2013 to Sep 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Completed final sign-off Oct 2016 | 363 Victoria St | voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block.Details
voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block. | $3,000 |
| Sep 30, 2016 | Completed final sign-off Oct 2016 | 145 Granada Av | voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block.Details
voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block. | $3,000 |
| Sep 30, 2016 | Completed final sign-off Oct 2016 | 576 Bright St | voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block.Details
voluntary strengthening. all work in garage. install 1/2" 5-ply plywoood ground perimeter walls w/ 10 d 4" edge nailing. install 5/8 anchor bolts @ 32" behind plywood w/ 7" embedment epoxy set. install l90 & l50 between double top plate & joist/block. | $3,000 |
| Oct 10, 2014 | Completed final sign-off Oct 2014 | 1887 Newhall St | voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside;Details
voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside; | $5,000 |
| Oct 10, 2014 | Completed final sign-off Oct 2014 | 1833 Newhall St | voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside;Details
voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside; | $5,000 |
| Oct 10, 2014 | Completed final sign-off Oct 2014 | 1684 Palou Av | voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside; all work in crawl space.Details
voluntary stregthening, install 1/2" plywood braced panels at perimeter walls w/4" edge nailing 0.c.-8d; install 5/8" anchor bolts w 3"x3"x0.229" washers at 3' o.c. @ plywood wall, install connections btwn floor & plywood wall, install 5/8" diameter anchor at hillside; all work in crawl space. | $5,000 |
| Oct 15, 2013 | Completed final sign-off Oct 2013 | 768 Head St | voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/3" edge 8d nailing behind plywd 5/8" bolts @2' o.o w/7" embedmenet epoxy set. install l90 & l50 from double top plate to joist/blockDetails
voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/3" edge 8d nailing behind plywd 5/8" bolts @2' o.o w/7" embedmenet epoxy set. install l90 & l50 from double top plate to joist/block | $3,000 |
| Oct 15, 2013 | Completed final sign-off Oct 2013 | 22 Lee Av | voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/3" edge 8d nailing behind plywd 5/8" bolts @3' o.c w/7" embedmenet epoxy set. install l90 & l50 from double top plate to joist/blockDetails
voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/3" edge 8d nailing behind plywd 5/8" bolts @3' o.c w/7" embedmenet epoxy set. install l90 & l50 from double top plate to joist/block | $3,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2013 | 115 Tioga Av | voluntary strengthening-all work at garage level & crawl space, install 1/2" plywd around perimeter framing w/6" o.c edge 8d nailing, install 5/8" bolts @2' o.c w/7" embedmenet epoxy set. install l90 & l50 double top plate & joist/blockDetails
voluntary strengthening-all work at garage level & crawl space, install 1/2" plywd around perimeter framing w/6" o.c edge 8d nailing, install 5/8" bolts @2' o.c w/7" embedmenet epoxy set. install l90 & l50 double top plate & joist/block | $3,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2013 | 251 Orizaba Av | voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/6" edge 8d nailing behind plywd 5/8" bolts @4' o.c w/7" embedmenet epoxy set. install l90 @32" o.c between double top plate to joist/blockDetails
voluntary strengthening-all work at garage level, install 1/2" plywd around perimeter framing w/6" edge 8d nailing behind plywd 5/8" bolts @4' o.c w/7" embedmenet epoxy set. install l90 @32" o.c between double top plate to joist/block | $3,000 |
| Feb 22, 2013 | Never finaled issued Feb 2013, no final | 109 28th St | repair in kind - roof deck and fence above first floor. replace french doors on deck . repair work less than 50%Details
repair in kind - roof deck and fence above first floor. replace french doors on deck . repair work less than 50% | $6,000 |
| Jan 28, 2013 | Completed final sign-off Feb 2013 | 1367 Gilman Av | install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level.Details
install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level. | $3,000 |
| Jan 28, 2013 | Completed final sign-off Feb 2013 | 266 Bridgeview Dr | install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level.Details
install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level. | $3,000 |
| Jan 28, 2013 | Expired or cancelled expired Aug 2016 | 1334 Sunnydale Av | install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level.Details
install 5/8" thrd. rod @ 4' o.c. min. 7" embd. epoxy set around permimeter foundation. install 1/2" plywood with 4" o.c. 10 d nailing at edge around ground floor framing sections. install simpson l70 @ 32" o.c. from floor joists to top plate. all work at garage level. | $3,000 |