Joseph Ward General Contractor
- Based in
- Concord
- On San Francisco permits
- Mar 2018 to May 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2021 | Completed final sign-off Aug 2021 | 2060 Sutter St | remodel and replace kitchen cabinets and counter top. remodel two bathrooms.Details
remodel and replace kitchen cabinets and counter top. remodel two bathrooms. | $60,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 2526 Broadway | revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.Details
revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles. | $7,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 2526 Broadway | rev to pa# 201908017616; removal of (e) stair between 3rd & 4th fl.Details
rev to pa# 201908017616; removal of (e) stair between 3rd & 4th fl. | $60,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2021 | 2526 Broadway | renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.Details
renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights. | $40,000 |
| Mar 27, 2018 | Completed final sign-off Aug 2018 | 720 Duboce Av | 720: 1st floor: remove wall at kitchen, remodel kitchen and bathroom, replace all windows, add furnace. 722: 2nd floor: remodel bathroom, replace windows, add furnace. replace less than 50% of extg rear stair. maher naDetails
720: 1st floor: remove wall at kitchen, remodel kitchen and bathroom, replace all windows, add furnace. 722: 2nd floor: remodel bathroom, replace windows, add furnace. replace less than 50% of extg rear stair. maher na | $160,000 |