Joseph Mannion Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Mar 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2016 | Completed final sign-off Mar 2020 | 1135 Stanyan St | convert (e) garage space to 2 efficiency apartment units. remove (e) overhead garage doors and replace with new wall that appears to be vintage, operable carriage doors. add one street tree. remove curb cut, replace with new curb. previous seismic pa #2014-0425-4252.Details
convert (e) garage space to 2 efficiency apartment units. remove (e) overhead garage doors and replace with new wall that appears to be vintage, operable carriage doors. add one street tree. remove curb cut, replace with new curb. previous seismic pa #2014-0425-4252. | $110,000 |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 1266 Stanyan St | replace exterior window sash in-kind. visible to street - 9; 18 windows total. existing and proposed are aluminum sliders. comply with egress windows reqd.Details
replace exterior window sash in-kind. visible to street - 9; 18 windows total. existing and proposed are aluminum sliders. comply with egress windows reqd. | $5,000 |
| Aug 29, 2014 | Completed final sign-off Jun 2016 | 1280 Pine St | legalization of dwelling unit installed without permit. n/a for maher ordinance.Details
legalization of dwelling unit installed without permit. n/a for maher ordinance. | $4,500 |
| Apr 25, 2014 | Completed final sign-off Mar 2023 | 1135 Stanyan St | compliance with soft story and mandatory seismic retrofit program sfbc chapter 34 c 2012 iebc a4Details
compliance with soft story and mandatory seismic retrofit program sfbc chapter 34 c 2012 iebc a4 | $30,000 |
| Apr 10, 2014 | Completed final sign-off Jul 2014 | 75 Buena Vista East Av | 200 sf deck serving existing 9th fl penthouse apt. deck replaces original deck built with the penthouse apartments and removed without a permit. maher--compliance with ordinance no. 155-13 not required.Details
200 sf deck serving existing 9th fl penthouse apt. deck replaces original deck built with the penthouse apartments and removed without a permit. maher--compliance with ordinance no. 155-13 not required. | $6,000 |