Joseph D. Devito Construction
- Based in
- Walnut Creek
- On San Francisco permits
- May 2011 to Apr 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2018 | Completed final sign-off Jan 2019 | 146 San Pablo Av | interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor areaDetails
interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor area | $71,500 |
| Dec 8, 2016 | Completed final sign-off Jan 2017 | 1254 20th Av | demo kitchen cabinets, open to studs upgrade electrical to code, insulate walls, ceiling 5/8 sjeetrpcl tape texture prime paint, install new cabinet, hood, counter tops, sink ,dishwasher, faucet garbage disposal, no soft addition.Details
demo kitchen cabinets, open to studs upgrade electrical to code, insulate walls, ceiling 5/8 sjeetrpcl tape texture prime paint, install new cabinet, hood, counter tops, sink ,dishwasher, faucet garbage disposal, no soft addition. | $25,000 |
| Sep 1, 2011 | Completed final sign-off Dec 2011 | 1254 20th Av | new tub, shower valve, new sheetrock on walls & ceiling, lights to comply with cec 150k, ceiling to drop to 8', new fan light, new light over vanity/ & cold water for vanity sink & also drain & vent. insulate wall & ceiling, prime & paint room. shower wall cultural marble, no wall adding.Details
new tub, shower valve, new sheetrock on walls & ceiling, lights to comply with cec 150k, ceiling to drop to 8', new fan light, new light over vanity/ & cold water for vanity sink & also drain & vent. insulate wall & ceiling, prime & paint room. shower wall cultural marble, no wall adding. | $12,000 |
| Jun 24, 2011 | Completed final sign-off Aug 2011 | 1242 Jackson St | gas line to 3 fireplaces & laundry room, new wood energy low e anderson windows to match (e), drain line, hot/cold for laundry room. u-factor, 0.40 max. no structural changes, not visible from the streetDetails
gas line to 3 fireplaces & laundry room, new wood energy low e anderson windows to match (e), drain line, hot/cold for laundry room. u-factor, 0.40 max. no structural changes, not visible from the street | $10,000 |
| May 10, 2011 | Expired or cancelled expired Jul 2012 | 1242 Jackson St | new owner's remove existing cabinet sink, repair walls, new circuit if needed for mircowave, move water hot & cold, 24" drain also, gfi existing, add 2 plugs. remove walls & tile floor at bath new shower, tub valve, tub to remain, existing gfi in bath.Details
new owner's remove existing cabinet sink, repair walls, new circuit if needed for mircowave, move water hot & cold, 24" drain also, gfi existing, add 2 plugs. remove walls & tile floor at bath new shower, tub valve, tub to remain, existing gfi in bath. | $15,000 |