Jose Olmos Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Nov 2013
- Last 24 months
- 0 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2013 | Completed final sign-off Jan 2014 | 570 Roosevelt Wy | repair bathrooms: leaking toilet cause damage in 2 bathroom, insurance open walls and floor to dry. repair damage, install 2 shower pan, change 1 bath tub, cover walls, install new tile in kind. no change on electrical.Details
repair bathrooms: leaking toilet cause damage in 2 bathroom, insurance open walls and floor to dry. repair damage, install 2 shower pan, change 1 bath tub, cover walls, install new tile in kind. no change on electrical. | $21,000 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 2291 14th Av | replaced damaged trim & siding around windows located in the back side of the house.Details
replaced damaged trim & siding around windows located in the back side of the house. | $2,950 |
| May 17, 2011 | Completed final sign-off Aug 2011 | 1030 Brazil Av | remove brick planters. repair exposed stucco as necessary in kind.Details
remove brick planters. repair exposed stucco as necessary in kind. | $1,400 |
| May 9, 2011 | Completed final sign-off Jul 2011 | 4652 18th St | front stairs. repair damage replace balusters in kind, less than 50% repairDetails
front stairs. repair damage replace balusters in kind, less than 50% repair | $3,600 |
| May 9, 2011 | Completed final sign-off Jul 2011 | 4656 18th St | front stairs, fix damage, replace balusters in kind. less than 50% repairDetails
front stairs, fix damage, replace balusters in kind. less than 50% repair | $3,150 |
| May 9, 2011 | Completed final sign-off Jul 2011 | 4650 18th St | front statirs, fix damage, replace balusters in kind. less than 50% repairDetails
front statirs, fix damage, replace balusters in kind. less than 50% repair | $3,400 |
| Jan 25, 2011 | Completed final sign-off Mar 2011 | 538 Munich St | repair dry rot damage to front stairway and landing. (limited to not more than 50% replacement of the structural).Details
repair dry rot damage to front stairway and landing. (limited to not more than 50% replacement of the structural). | $7,200 |
| Aug 17, 2010 | Completed final sign-off Jul 2011 | 208 Chenery St | add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stairDetails
add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stair | $110,000 |
| Mar 4, 2010 | Completed final sign-off Mar 2010 | 1030 Brazil Av | (2 rooms) remove carpet on 1st fl. replace sub-floor and its frame joist as needed 2" slab rough proxfing concrete.Details
(2 rooms) remove carpet on 1st fl. replace sub-floor and its frame joist as needed 2" slab rough proxfing concrete. | $6,700 |
| Jun 12, 2009 | Never finaled issued Jun 2009, no final | 1026 Diamond St | replace existing siding exterior wall (north) in kind. 3/8 plywood paper 2 siding is not visable from street.Details
replace existing siding exterior wall (north) in kind. 3/8 plywood paper 2 siding is not visable from street. | $6,200 |
| May 13, 2009 | Completed final sign-off Jul 2009 | 40 Hartford St | wokk @ unit# 42 only. remodel existing bathroom on the 2nd floor. no structural change. new fixture. toilet, floor. dry wall., lighting, shower.Details
wokk @ unit# 42 only. remodel existing bathroom on the 2nd floor. no structural change. new fixture. toilet, floor. dry wall., lighting, shower. | $12,000 |
| Mar 21, 2008 | Completed final sign-off Apr 2008 | 1518 33rd Av | remove non bearing wall and install new non bearing partition to extend studio/office.Details
remove non bearing wall and install new non bearing partition to extend studio/office. | $6,500 |
| Sep 8, 2005 | Completed final sign-off Nov 2005 | 35 Hiliritas Av | replace (e) dry rotted wood deck in kind.Details
replace (e) dry rotted wood deck in kind. | $6,250 |
| Nov 10, 2004 | Completed final sign-off May 2005 | 1064 Shotwell St | rebuild required 2nd means of egress in rear.Details
rebuild required 2nd means of egress in rear. | $11,000 |
| Oct 15, 2004 | Completed final sign-off May 2005 | 1064 Shotwell St | new sheetrock & insulation top unit front rooms.interior work only rev#200408171789.Details
new sheetrock & insulation top unit front rooms.interior work only rev#200408171789. | $4,650 |
| Sep 20, 2004 | Completed final sign-off May 2005 | 1064 Shotwell St | replace 6 wood windows sash at the front house (in kind) replace 6 wood windows for wood & vinyl winDetails
replace 6 wood windows sash at the front house (in kind) replace 6 wood windows for wood & vinyl win | $6,280 |
| Jan 23, 2004 | Completed final sign-off Nov 2004 | 1919 Sacramento St | remodel existing bathrooms as per plans provided. no structural work. minor interior remodel.Details
remodel existing bathrooms as per plans provided. no structural work. minor interior remodel. | $62,000 |
| Oct 23, 2003 | Completed final sign-off May 2004 | 506 Rockdale Dr | items 4a &6a only of termite report#36875. 4a repair dry rot damage to front stairs, abotment 6a-repDetails
items 4a &6a only of termite report#36875. 4a repair dry rot damage to front stairs, abotment 6a-rep | $8,470 |
| Aug 13, 2002 | Completed final sign-off Sep 2002 | 537 Panorama Dr | repair dry rot damage at side of chimney area. re-stucco it. repair framing at front balcony in kindDetails
repair dry rot damage at side of chimney area. re-stucco it. repair framing at front balcony in kind | $2,400 |
| Feb 15, 2002 | Completed final sign-off Mar 2002 | 444 30th St | repair the front bay window. open 24 sq feetDetails
repair the front bay window. open 24 sq feet | $1,500 |