Jones Bros Construction & Design Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Dec 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2016 | Completed final sign-off Jan 2017 | 441 24th Av | unit #7: remodel (e) bathroom, upgrade electrical & plumbing for bathroom to code.Details
unit #7: remodel (e) bathroom, upgrade electrical & plumbing for bathroom to code. | $7,000 |
| Nov 3, 2016 | Completed final sign-off Aug 2018 | 441 24th Av | replace the siding around back stairs way.Details
replace the siding around back stairs way. | $6,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 441 24th Av | #3- remodel existing kitchen and bathroom, upgrade electrical for kitchen & bathroom to code, replace total 6 window, not face street.Details
#3- remodel existing kitchen and bathroom, upgrade electrical for kitchen & bathroom to code, replace total 6 window, not face street. | $18,000 |
| Sep 2, 2016 | Completed final sign-off Mar 2017 | 55 Park St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. install shear walls and moment frames.Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. install shear walls and moment frames. | $50,000 |