Jones Bros Construction & Design Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Apr 2024
- Last 24 months
- 0 permits filed
68 permits since 2000: 61 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2024 | Completed final sign-off Jun 2024 | 633 Central Av | to obtain final inspection for work apporved under pa#201701237663,200508150270. all work is completeDetails
to obtain final inspection for work apporved under pa#201701237663,200508150270. all work is complete | |
| Apr 26, 2024 | Completed final sign-off Jun 2024 | 832 Cole St | one bathroom remodel in kindDetails
one bathroom remodel in kind | $10,000 |
| Oct 16, 2023 | Completed final sign-off Jan 2024 | 2760 San Bruno Av | unti# 7: remodel existing kitchen and bathroom, like for like, in-kindDetails
unti# 7: remodel existing kitchen and bathroom, like for like, in-kind | $35,000 |
| May 22, 2023 | Completed final sign-off Oct 2023 | 2770 San Bruno Av | unit #6: remodel existing 1 kitchen and 1 bathroom in-kind. kitchen: changing cabinets, countertop, sink, faucet. bathroom: tiles, tub, vanity, toiletDetails
unit #6: remodel existing 1 kitchen and 1 bathroom in-kind. kitchen: changing cabinets, countertop, sink, faucet. bathroom: tiles, tub, vanity, toilet | $20,000 |
| Feb 10, 2023 | Completed final sign-off Jun 2023 | 120 Pierce St | unit b, remodel existing kitchen and bathroom in kindDetails
unit b, remodel existing kitchen and bathroom in kind | $30,000 |
| Dec 22, 2022 | Completed final sign-off Nov 2023 | 2750 San Bruno Av | to obtain final inspection for work approved under pa# 201908199134. all work is complete.Details
to obtain final inspection for work approved under pa# 201908199134. all work is complete. | |
| Dec 22, 2022 | Completed final sign-off Nov 2023 | 2750 San Bruno Av | to obtain final inspection for work approved under pa# 201809130124. all work is complete.Details
to obtain final inspection for work approved under pa# 201809130124. all work is complete. | |
| Dec 20, 2022 | Completed final sign-off Nov 2023 | 2378 31st Av | ref pa#2021-0203-3920. re-inforce the e rear wall foundationDetails
ref pa#2021-0203-3920. re-inforce the e rear wall foundation | $10,000 |
| Dec 9, 2022 | Completed final sign-off Dec 2022 | 224 Valencia St | to obtain final inspection for 201809130125. all work is complete.Details
to obtain final inspection for 201809130125. all work is complete. | |
| Dec 9, 2022 | Completed final sign-off Dec 2022 | 224 Valencia St | to obtain final inspection for 201809130125. all work is complete.Details
to obtain final inspection for 201809130125. all work is complete. | |
| Sep 22, 2022 | Completed final sign-off Feb 2023 | 105 Lake St | apt #6: remodel (e) kitchen and bathroom. install subpanel in the unit. install plumbing for the unit.Details
apt #6: remodel (e) kitchen and bathroom. install subpanel in the unit. install plumbing for the unit. | $20,000 |
| Oct 8, 2021 | Completed final sign-off Mar 2022 | 832 Cole St | remodeling existing kitchen and laundry area.Details
remodeling existing kitchen and laundry area. | $15,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 1944 Ellis St | remodel (e) kitchen & 2 bathrooms. upgrade led lites electrical & plumbing for kitchen & bathroom. non structualDetails
remodel (e) kitchen & 2 bathrooms. upgrade led lites electrical & plumbing for kitchen & bathroom. non structual | $12,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2021 | 759 31st Av | remodel (e) hallway bathroom, upgrade electrical & plumbing for bathroom, perthd code, replace (2) windows belong to the same bathroom (not visible from the street). max. u-factor = 0.40. lighting h.e. & per cec 150.0(k)Details
remodel (e) hallway bathroom, upgrade electrical & plumbing for bathroom, perthd code, replace (2) windows belong to the same bathroom (not visible from the street). max. u-factor = 0.40. lighting h.e. & per cec 150.0(k) | $11,000 |
| Jul 6, 2021 | Completed final sign-off Apr 2022 | 120 Pierce St | unit 6. remodel existing one kitchen and one bathroom. upgrade electrical & plumbing. install subpanel.Details
unit 6. remodel existing one kitchen and one bathroom. upgrade electrical & plumbing. install subpanel. | $20,000 |
| Feb 3, 2021 | Completed final sign-off Aug 2024 | 2378 31st Av | interior remodel, no exterior work proposed. level 1: add partition walls to define garage, create laundry room, game room, bathroom, guest room, & exterior deck. level 2: remodel bathoom, kitchen, create study, rebuild exterior deck.Details
interior remodel, no exterior work proposed. level 1: add partition walls to define garage, create laundry room, game room, bathroom, guest room, & exterior deck. level 2: remodel bathoom, kitchen, create study, rebuild exterior deck. | $250,000 |
| Dec 4, 2020 | Completed final sign-off Jun 2021 | 4314 17th St | repair existing exterior side stairs in kind. less than 50%. the stairs not visible to the street, on the left side of the building.Details
repair existing exterior side stairs in kind. less than 50%. the stairs not visible to the street, on the left side of the building. | $2,000 |
| Nov 2, 2020 | Completed final sign-off Apr 2021 | 105 Lake St | unit #2: remodel existing kitchen & bathroom. no moving any walls.Details
unit #2: remodel existing kitchen & bathroom. no moving any walls. | $30,000 |
| Nov 2, 2020 | Never finaled issued Nov 2020, no final | 1279 Mcallister St | remodel existing kitchen and 2 bathrooms.no moving any walls.Details
remodel existing kitchen and 2 bathrooms.no moving any walls. | $40,000 |
| Sep 28, 2020 | Completed final sign-off Jun 2021 | 120 Pierce St | apt 5: remodel (e) kitchen & bathroom.Details
apt 5: remodel (e) kitchen & bathroom. | $25,000 |
| May 29, 2020 | Completed final sign-off Sep 2020 | 1948 Ellis St | remodel existing kitchen and 2 existing bathrooms. all work in-kind.Details
remodel existing kitchen and 2 existing bathrooms. all work in-kind. | $60,000 |
| Sep 30, 2019 | Completed final sign-off Dec 2019 | 1946 Ellis St | remodel existing kitchen & 2 bathrooms.Details
remodel existing kitchen & 2 bathrooms. | $20,000 |
| Sep 30, 2019 | Completed final sign-off May 2020 | 2358 17th Av | remodel existing hallway bathroom.Details
remodel existing hallway bathroom. | $8,000 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 2231 Powell St | mandatory soft-story retrofit per 2016 sfebc chapter 4d=2016 sfebc appendix a4. maher n/aDetails
mandatory soft-story retrofit per 2016 sfebc chapter 4d=2016 sfebc appendix a4. maher n/a | $100,000 |
| Sep 9, 2019 | Completed final sign-off Jan 2020 | 1283 Mcallister St | remodel existing 2 bathrooms. in kind, same location. no moving of doors or walls.Details
remodel existing 2 bathrooms. in kind, same location. no moving of doors or walls. | $12,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2019 | 130 Pacheco St | replace 7 windows, not facing to street, not visible to street.Details
replace 7 windows, not facing to street, not visible to street. | $3,000 |
| Aug 19, 2019 | Expired or cancelled expired Nov 2023 | 2750 San Bruno Av | (commercial)soft story retrofit per chapter 4d per 2016 cebc appendix a-4Details
(commercial)soft story retrofit per chapter 4d per 2016 cebc appendix a-4 | $30,000 |
| Aug 19, 2019 | Expired or cancelled expired Dec 2022 | 224 Valencia St | (commercial)soft story retrofit chapter 4dDetails
(commercial)soft story retrofit chapter 4d | $30,000 |
| Aug 1, 2019 | Completed final sign-off Jul 2020 | 4314 17th St | revision of permit 2019-0611-3121, comply & address complaint 201973411. completely remodel existing units #1 & #2, including living rooms, bedrooms, replace existing electrical heater for both units. no structural work. no change to existing frameDetails
revision of permit 2019-0611-3121, comply & address complaint 201973411. completely remodel existing units #1 & #2, including living rooms, bedrooms, replace existing electrical heater for both units. no structural work. no change to existing frame | $8,000 |
| Jun 28, 2019 | Completed final sign-off Aug 2020 | 39 Sutro Heights Av | unit 39, 2nd flr. living, dining and (e) bathroom remodel. (n) bathroom addition. no exterior work.Details
unit 39, 2nd flr. living, dining and (e) bathroom remodel. (n) bathroom addition. no exterior work. | $100,000 |
| Jun 11, 2019 | Completed final sign-off Oct 2019 | 633 Central Av | replace siding along south elevation with in-kind, true wood horizontal siding. approximately 1200-1500 sqft. no other work.Details
replace siding along south elevation with in-kind, true wood horizontal siding. approximately 1200-1500 sqft. no other work. | $50,000 |
| Jun 11, 2019 | Completed final sign-off Jul 2020 | 4314 17th St | remodel existing kitchen and bathroom for unit # 1 and unit # 2Details
remodel existing kitchen and bathroom for unit # 1 and unit # 2 | $30,000 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 1509 Golden Gate Av | unit 304: remodel existing kitchen and bathroomDetails
unit 304: remodel existing kitchen and bathroom | $6,000 |
| Mar 5, 2019 | Completed final sign-off Apr 2019 | 1359 Sacramento St | remodel existing bathroom. upgrade electrical for bathroom.Details
remodel existing bathroom. upgrade electrical for bathroom. | $9,000 |
| Jan 15, 2019 | Completed final sign-off Feb 2019 | 288 Thrift St | remodel 1 existing kitchen and 1 bath in upstairs. non structural. all work in kindDetails
remodel 1 existing kitchen and 1 bath in upstairs. non structural. all work in kind | $22,000 |
| Dec 13, 2018 | Completed final sign-off Jan 2019 | 288 Thrift St | demo basement bathroom, 2 bedrooms (illegal walls), repair roof leaking mold painting to comply with nov's 201701491, 201793061 & 201791591Details
demo basement bathroom, 2 bedrooms (illegal walls), repair roof leaking mold painting to comply with nov's 201701491, 201793061 & 201791591 | $2,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2019 | 2231 Powell St | units 3, 5: remodel kitchen in each unit. each kitchen is 7' by 8'Details
units 3, 5: remodel kitchen in each unit. each kitchen is 7' by 8' | $18,000 |
| Sep 13, 2018 | Expired or cancelled expired Dec 2022 | 224 Valencia St | residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Sep 13, 2018 | Completed final sign-off Mar 2022 | 1520 Geneva Av | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Sep 13, 2018 | Expired or cancelled expired Nov 2023 | 2750 San Bruno Av | (residential)soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
(residential)soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Sep 13, 2018 | Completed final sign-off Mar 2022 | 1520 Geneva Av | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Jul 20, 2018 | Completed final sign-off Oct 2018 | 105 Lake St | remodel existing kitchen + bathroom. all work in unit #12. no structural work under this permit.Details
remodel existing kitchen + bathroom. all work in unit #12. no structural work under this permit. | $25,000 |
| May 31, 2018 | Completed final sign-off Apr 2019 | 1874 21st Av | replace existing redwood siding with new redwood siding for front wall and entrance areas. around 600 square feet. siding will be in kind meaning horizontal.Details
replace existing redwood siding with new redwood siding for front wall and entrance areas. around 600 square feet. siding will be in kind meaning horizontal. | $12,000 |
| May 23, 2018 | Completed final sign-off Apr 2019 | 267 Dorland St | replace redwood siding for rear wall of building, install r-19 insulation. install redwood siding for east & west wall rear section. replace 5 windows at rear u<0.32. repair back stair in kind less than 50%. approx 1500sf siding replaced. all work not visible from st.Details
replace redwood siding for rear wall of building, install r-19 insulation. install redwood siding for east & west wall rear section. replace 5 windows at rear u<0.32. repair back stair in kind less than 50%. approx 1500sf siding replaced. all work not visible from st. | $20,000 |
| May 4, 2018 | Completed final sign-off Nov 2018 | 760 Bacon St | install cement board siding for south & east wall. work not visible from street. approximate 1,500 sq. ft.Details
install cement board siding for south & east wall. work not visible from street. approximate 1,500 sq. ft. | $12,000 |
| May 2, 2018 | Completed final sign-off Jun 2018 | 2750 San Bruno Av | to comply nov#201849591. remove wooden wall (plywood) between garage at se garage. repair balcony dry @ unit#2760 #3 less than 50%. replace smoke enclosure door closet at end of north bldg egress. repair one cable at rear wall of electrical room. replace one leaking faucet.Details
to comply nov#201849591. remove wooden wall (plywood) between garage at se garage. repair balcony dry @ unit#2760 #3 less than 50%. replace smoke enclosure door closet at end of north bldg egress. repair one cable at rear wall of electrical room. replace one leaking faucet. | $2,500 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 130 Pacheco St | remodel (e) bathroom. 1 bathroom in-kind.Details
remodel (e) bathroom. 1 bathroom in-kind. | $16,000 |
| Dec 6, 2017 | Completed final sign-off Aug 2019 | 2915 California St | unit #6: remodel existing ktichen & bathroom & laundry room. unit #7: remodel exisitng kitchen & bathroom. no wall modification or removal, no structural work.Details
unit #6: remodel existing ktichen & bathroom & laundry room. unit #7: remodel exisitng kitchen & bathroom. no wall modification or removal, no structural work. | $30,000 |
| Dec 4, 2017 | Completed final sign-off Mar 2018 | 441 24th Av | unit 6: remodel (e) kitchen & bathroom, no change in wall/opening/layoutDetails
unit 6: remodel (e) kitchen & bathroom, no change in wall/opening/layout | $15,000 |
| Nov 27, 2017 | Completed final sign-off Apr 2018 | 224 Valencia St | remodel existing kitchen & two and half bathrooms. no change of (e) layout.Details
remodel existing kitchen & two and half bathrooms. no change of (e) layout. | $25,000 |
| Nov 13, 2017 | Completed final sign-off Mar 2018 | 1277 Mcallister St | remodel (e) kitchen & 1-1/2 bathroom.Details
remodel (e) kitchen & 1-1/2 bathroom. | $18,000 |
| Oct 18, 2017 | Completed final sign-off Mar 2018 | 2915 California St | revision to app#201704214601 to comply with sf soft story seismic retrofit program, sfebc chapter 4d per 2016 cebc appendix a-4Details
revision to app#201704214601 to comply with sf soft story seismic retrofit program, sfebc chapter 4d per 2016 cebc appendix a-4 | |
| Oct 3, 2017 | Completed final sign-off May 2018 | 3150 Mission St | work in unit #4: remodel (e) kitchen and bathroom.Details
work in unit #4: remodel (e) kitchen and bathroom. | $20,000 |
| Sep 13, 2017 | Completed final sign-off Feb 2019 | 1215 Pacific Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 5, 2017 | Completed final sign-off Nov 2017 | 2345 Post St | apt #38: remodel existing kitchen & bathroom. replace cabinets and counter top.Details
apt #38: remodel existing kitchen & bathroom. replace cabinets and counter top. | $30,000 |
| Aug 25, 2017 | Completed final sign-off Apr 2019 | 1277 Mcallister St | to comply with sf soft story seismic retrofit program sfebc chapter f4 per 2016 cebc appendix chapter a-4.Details
to comply with sf soft story seismic retrofit program sfebc chapter f4 per 2016 cebc appendix chapter a-4. | $70,000 |
| Aug 25, 2017 | Completed final sign-off Aug 2019 | 4314 17th St | to comply with sf soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chatper a-4.Details
to comply with sf soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chatper a-4. | $58,000 |
| Aug 25, 2017 | Completed final sign-off Nov 2018 | 120 Pierce St | to comply with sf soft story seismic retrofit program sfebc chapter f4 per 2016 cebc appendix chatper a-4.Details
to comply with sf soft story seismic retrofit program sfebc chapter f4 per 2016 cebc appendix chatper a-4. | $80,000 |
| Jun 16, 2017 | Completed final sign-off Aug 2017 | 105 Lake St | unit #4: remodeling existing kitchen and bathroom.Details
unit #4: remodeling existing kitchen and bathroom. | $15,000 |
| May 9, 2017 | Completed final sign-off Jul 2017 | 120 Pierce St | remodel existing kitchen & bathroom.Details
remodel existing kitchen & bathroom. | $16,000 |
| Apr 21, 2017 | Completed final sign-off Mar 2018 | 2915 California St | soft story seismic retrofit per sfebc chpater 4d. install shear wall and moment frame per 2016 cebc appendix a-4Details
soft story seismic retrofit per sfebc chpater 4d. install shear wall and moment frame per 2016 cebc appendix a-4 | $60,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 491 12th Av | repair the concrete driveway around 160 sq. ft. 02/03/2017with some material on grade.Details
repair the concrete driveway around 160 sq. ft. 02/03/2017with some material on grade. | $1,200 |
| Apr 7, 2017 | Completed final sign-off Jul 2017 | 1940 Ellis St | remodel 2 existing bathrooms.Details
remodel 2 existing bathrooms. | $18,000 |
| Mar 13, 2017 | Completed final sign-off Mar 2018 | 1215 Pacific Av | unit #303: remodel existing kitchen and two bathrooms.Details
unit #303: remodel existing kitchen and two bathrooms. | $30,000 |
| Feb 1, 2017 | Completed final sign-off Jun 2017 | 4314 17th St | remodel existing kitchen & bathroom for unit #4. remodel existing kitchen & bathroom for unit #5. no walls altered / no structural work.Details
remodel existing kitchen & bathroom for unit #4. remodel existing kitchen & bathroom for unit #5. no walls altered / no structural work. | $5,000 |
| Jan 23, 2017 | Completed final sign-off Jan 2018 | 633 Central Av | unit # 1: remodel (e) kitchen and bathroom. replace plaster drywall to sheetrock for the unit. replace total 5 windows (not facing to the street). unit #2: replace total 6 windows (not visible to street) comply to complaint # 200669920, item 3. n/a maher ord. 155-13Details
unit # 1: remodel (e) kitchen and bathroom. replace plaster drywall to sheetrock for the unit. replace total 5 windows (not facing to the street). unit #2: replace total 6 windows (not visible to street) comply to complaint # 200669920, item 3. n/a maher ord. 155-13 | $20,000 |
| Jan 23, 2017 | Never finaled issued Jan 2017, no final | 633 Central Av | renew 200508150270 to final inspection. no work to be performed under this permit. n/a maherDetails
renew 200508150270 to final inspection. no work to be performed under this permit. n/a maher | |
| Sep 2, 2016 | Completed final sign-off Sep 2017 | 105 Lake St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4 | $60,000 |