John Sutti & Associates, Inc.
- Based in
- Burlingame
- On San Francisco permits
- Apr 2002 to Jul 2026
- Last 24 months
- 2 permits filed
53 permits since 2000: 36 completed, 2 in progress, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 2934 24th St | interior t.i. to existing grocery market to install a commericial kitchen. modify existing restroom to meet accessiblity standards.Details
interior t.i. to existing grocery market to install a commericial kitchen. modify existing restroom to meet accessiblity standards. | $168,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 1515 Sunnydale Av | 1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep.Details
1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep. | $1,200,000 |
| Aug 23, 2022 | Expired or cancelled cancelled Jan 2026 | 1401 17th St | ada accessible entranceDetails
ada accessible entrance | $5,400 |
| Aug 11, 2021 | Never finaled issued Aug 2021, no final | 2480 San Bruno Av | interior only: t.i. replace refrigeration display equipment, change grocery shelving layout, replace check stands, new cooler.Details
interior only: t.i. replace refrigeration display equipment, change grocery shelving layout, replace check stands, new cooler. | $67,000 |
| Feb 8, 2021 | Never finaled issued May 2021, no final | 400 Winston Dr | revision to the issued pa# 2019-05-14-0623 removed a kitchen/food prep area, revised shower to changing room, added/revised/relocated equipment & associated mepr utility updates related to plan revisions. updated occupant loads related to the plan revisions.Details
revision to the issued pa# 2019-05-14-0623 removed a kitchen/food prep area, revised shower to changing room, added/revised/relocated equipment & associated mepr utility updates related to plan revisions. updated occupant loads related to the plan revisions. | |
| Jan 28, 2021 | Expired or cancelled cancelled Jan 2026 | 2480 San Bruno Av | exterior work limited to nw roof equip& screen. partial interior t.i. of extg grocery store. interior work incl kitchen remodel, nw kitchen hood & cooking equipment. nw ground floor ada restroom. nw break room. relocate & rebuild stairs to mezzanine, new pallet lift to mezz., remodel mezz bathrm;Details
exterior work limited to nw roof equip& screen. partial interior t.i. of extg grocery store. interior work incl kitchen remodel, nw kitchen hood & cooking equipment. nw ground floor ada restroom. nw break room. relocate & rebuild stairs to mezzanine, new pallet lift to mezz., remodel mezz bathrm; | $453,000 |
| Nov 15, 2019 | Completed final sign-off Jun 2020 | 450 Rhode Island St | interior remodel of existing grocercy store at seafood area. replace equipment per plan with assoiciated utility work (plumbing, ele, refrig)Details
interior remodel of existing grocercy store at seafood area. replace equipment per plan with assoiciated utility work (plumbing, ele, refrig) | $65,000 |
| Aug 13, 2019 | Completed final sign-off Jul 2020 | 399 04th St | minor remodel to upgrade prepared foods bars and relocation fo equipment. no changes to building's lighting or structural systems under this permitDetails
minor remodel to upgrade prepared foods bars and relocation fo equipment. no changes to building's lighting or structural systems under this permit | $100,000 |
| May 14, 2019 | Completed final sign-off Mar 2022 | 400 Winston Dr | interior t.i. concrete topping slab, walk in cooler & freezer boxer, restroom facilities,interior partitions, interior fixtures, equipment & seating. ceilings & lighting, associated electric, mechanical, plumbing & refrigeration equipment & systems.Details
interior t.i. concrete topping slab, walk in cooler & freezer boxer, restroom facilities,interior partitions, interior fixtures, equipment & seating. ceilings & lighting, associated electric, mechanical, plumbing & refrigeration equipment & systems. | $8,856,000 |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 1101 04th St | ti to (e) market. (n) entrance. (n) ada ramp from (e) parking. (n) partitions at meat department. remodel coffee/bar area. replace refrigerated display cases. relocate lights & fixtures. modifications to (e) salesfloor shelving, checkstands & bulk fixtures. (n) coolers. maher naDetails
ti to (e) market. (n) entrance. (n) ada ramp from (e) parking. (n) partitions at meat department. remodel coffee/bar area. replace refrigerated display cases. relocate lights & fixtures. modifications to (e) salesfloor shelving, checkstands & bulk fixtures. (n) coolers. maher na | $190,000 |
| May 10, 2018 | Completed final sign-off Oct 2018 | 2001 Market St | remove and installation of new cabinets, remove and installation of new light fixtures, reorganization of equipementDetails
remove and installation of new cabinets, remove and installation of new light fixtures, reorganization of equipement | $45,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2018 | 79 09th St | change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors.Details
change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors. | $150,000 |
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 399 04th St | remodel existing grocery store consisting of: removal of existing seafood service cases, wood millwork display. relocate e) fl sink and reuse existing digital scales. provide new seafood service cases and stainless steel millwork pieces. no change to build structural/mech system under this permitDetails
remodel existing grocery store consisting of: removal of existing seafood service cases, wood millwork display. relocate e) fl sink and reuse existing digital scales. provide new seafood service cases and stainless steel millwork pieces. no change to build structural/mech system under this permit | $10,000 |
| Nov 9, 2015 | Completed final sign-off Nov 2015 | 2111 Harrison St | revision to checkstand counter height detail 4/a0.10 to be between 34" to 38" max for previosly approved permit #201504284827. n/a for maher.Details
revision to checkstand counter height detail 4/a0.10 to be between 34" to 38" max for previosly approved permit #201504284827. n/a for maher. | |
| Nov 9, 2015 | Never finaled issued Nov 2015, no final | 2111 Harrison St | add outside seating and tables during business hoursDetails
add outside seating and tables during business hours | $2,000 |
| Nov 2, 2015 | Completed final sign-off Nov 2015 | 4850 03rd St | to obtain final inspection for work approved under pa 201309247572; all work is completeDetails
to obtain final inspection for work approved under pa 201309247572; all work is complete | |
| Nov 2, 2015 | Completed final sign-off Nov 2015 | 4850 03rd St | to obtain final inspection for work approved under pa 201309247570; all work is completeDetails
to obtain final inspection for work approved under pa 201309247570; all work is complete | |
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 1150 Ocean Av | cart corral reconfiguration in an (e) grocery store. no change to exterior , walls, structure, mechanical, electrical or plumbing. all scope is beyond the food aears of the store.Details
cart corral reconfiguration in an (e) grocery store. no change to exterior , walls, structure, mechanical, electrical or plumbing. all scope is beyond the food aears of the store. | $20,000 |
| Apr 28, 2015 | Completed final sign-off Nov 2015 | 2111 Harrison St | ti for new market. change of use. interior only-(n) interior partitions, commercial kitchen, (n) electrical, plumbing, mech,lighting & refrigeration. demolition & exterior filed under separate permit.Details
ti for new market. change of use. interior only-(n) interior partitions, commercial kitchen, (n) electrical, plumbing, mech,lighting & refrigeration. demolition & exterior filed under separate permit. | $600,000 |
| Mar 6, 2015 | Completed final sign-off Nov 2015 | 2111 Harrison St | storefront renoations on (e) warehouse bldg for (n) market. work includes (n) windows doors security grille, canopy, fabric awning. change of useto (m) mariket signage under separate permit int. t.i. under separate permitDetails
storefront renoations on (e) warehouse bldg for (n) market. work includes (n) windows doors security grille, canopy, fabric awning. change of useto (m) mariket signage under separate permit int. t.i. under separate permit | $91,000 |
| Feb 25, 2015 | Completed final sign-off Nov 2015 | 400 Alabama St | interior soft demo in advance of future ti. per ab 017 no exterior work maher - not req'dDetails
interior soft demo in advance of future ti. per ab 017 no exterior work maher - not req'd | $20,000 |
| Jul 25, 2014 | Completed final sign-off Aug 2014 | 399 04th St | bar wall will be built, 1-hour per ca file wp1296 per 603.1, item 11; treat wood elements with fire free 88 to conform and fire resistive flame spread reuqirements. ref #201403261705Details
bar wall will be built, 1-hour per ca file wp1296 per 603.1, item 11; treat wood elements with fire free 88 to conform and fire resistive flame spread reuqirements. ref #201403261705 | $2,000 |
| Jul 17, 2014 | Never finaled issued Jul 2014, no final | 1745 Folsom St | install new glazing at exterior (e) canopy frame. reconfiguration of accessible parking layout. maher n/a.Details
install new glazing at exterior (e) canopy frame. reconfiguration of accessible parking layout. maher n/a. | $23,000 |
| Mar 26, 2014 | Never finaled issued Apr 2014, no final | 1745 Folsom St | interior t.i. replacement of refrigeration cases, replacement of roof top mounted refrigeration condensers, relocation of extg and new light fixtures, nw ada bathrooms, upgrade to full compliance ada parking, ada signs, new interior sliding door modifications to sales shelving, checkstands,Details
interior t.i. replacement of refrigeration cases, replacement of roof top mounted refrigeration condensers, relocation of extg and new light fixtures, nw ada bathrooms, upgrade to full compliance ada parking, ada signs, new interior sliding door modifications to sales shelving, checkstands, | $547,398 |
| Mar 26, 2014 | Completed final sign-off Aug 2014 | 399 04th St | remodel of (e) grocery store bulk dept. into taproom food & drink venue. work includes demo as noted, new equipment, floor sinks, flooring, lighting, electrical, plumbing, refrigeration and finishes. (not a change of use)Details
remodel of (e) grocery store bulk dept. into taproom food & drink venue. work includes demo as noted, new equipment, floor sinks, flooring, lighting, electrical, plumbing, refrigeration and finishes. (not a change of use) | $40,000 |
| Apr 25, 2013 | Completed final sign-off Jan 2014 | 399 04th St | removal of extg meat service equipment, millwork, floor mounted corner guards, and concrete curbs associated with removed equipment. installation of new refridg cases in area of work and associated plmg and electrical. patch and repair of extg floor finishes where necessary.no changes to hvac orDetails
removal of extg meat service equipment, millwork, floor mounted corner guards, and concrete curbs associated with removed equipment. installation of new refridg cases in area of work and associated plmg and electrical. patch and repair of extg floor finishes where necessary.no changes to hvac or | $40,000 |
| Apr 25, 2013 | Completed final sign-off Nov 2013 | 450 Rhode Island St | replacement of extg fire door in loading area with new fire door.Details
replacement of extg fire door in loading area with new fire door. | $4,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 3950 24th St | interior equipment replacment in existing grocery store consisting of removal of shelving and installation of a food barDetails
interior equipment replacment in existing grocery store consisting of removal of shelving and installation of a food bar | $25,000 |
| Aug 15, 2012 | Completed final sign-off Nov 2013 | 2001 Market St | first time tenant improvement of ground floor grocery store space. fire alarm & sprinkler under separate permit.Details
first time tenant improvement of ground floor grocery store space. fire alarm & sprinkler under separate permit. | $2,500,000 |
| Apr 19, 2012 | Completed final sign-off Jun 2013 | 1150 Ocean Av | revision 2011-1024-7445 for additonal structural workDetails
revision 2011-1024-7445 for additonal structural work | $15,000 |
| Aug 8, 2011 | Completed final sign-off Dec 2011 | 1745 Folsom St | rainbow grocery. new storefront windows, automatic entrance door, security roll up grill. cut and cap 1/2 " cold water line. relocate (e) electrical outlets, remove (e) lights at entrance. install new pendant lights. new t-bar clg at entrance, gyp bd soffitsDetails
rainbow grocery. new storefront windows, automatic entrance door, security roll up grill. cut and cap 1/2 " cold water line. relocate (e) electrical outlets, remove (e) lights at entrance. install new pendant lights. new t-bar clg at entrance, gyp bd soffits | $112,896 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 1765 California St | this is a 1,500 sf interior remodel in an extg grocery reail store consisting of ;removal of exg coffee service area millwork & equipment at coffee service. refinish of floor in area of work. new millwork & seating at seating area. refinish of wall & floor at restroom. new toilet accessories.Details
this is a 1,500 sf interior remodel in an extg grocery reail store consisting of ;removal of exg coffee service area millwork & equipment at coffee service. refinish of floor in area of work. new millwork & seating at seating area. refinish of wall & floor at restroom. new toilet accessories. | $115,000 |
| Mar 25, 2011 | Completed final sign-off Aug 2011 | 399 04th St | interior lighting and food service island remodel. no mechanical work. no structural changes to building will be made. lighting revination for 1/3 of sales floor. minor millwork and finish material changes. new condiment bar on 2nd fl at seating area. cart corral modificationsDetails
interior lighting and food service island remodel. no mechanical work. no structural changes to building will be made. lighting revination for 1/3 of sales floor. minor millwork and finish material changes. new condiment bar on 2nd fl at seating area. cart corral modifications | $315,000 |
| Aug 27, 2010 | Completed final sign-off Apr 2011 | 1530 Haight St | underpinning. west wall with alternating hand-dug piers.Details
underpinning. west wall with alternating hand-dug piers. | $8,000 |
| Jun 25, 2010 | Completed final sign-off Sep 2011 | 1530 Haight St | tenant improvements & 1 story rear addition w/commercial expansion into adjacent building. refer to 2010.033cv. foward to glen cabreros.Details
tenant improvements & 1 story rear addition w/commercial expansion into adjacent building. refer to 2010.033cv. foward to glen cabreros. | $1,000,000 |
| Dec 12, 2008 | Completed final sign-off Feb 2009 | 1200 Irving St | repair damage roof screen. effectively replace in kind with minor structural improvements.Details
repair damage roof screen. effectively replace in kind with minor structural improvements. | $13,750 |
| Jun 4, 2008 | Completed final sign-off Mar 2009 | 1200 Irving St | upgrade (e) restrooms. adjacent (e) cash office. existing path of travel and accessibility upgrades under permit 200802144852.Details
upgrade (e) restrooms. adjacent (e) cash office. existing path of travel and accessibility upgrades under permit 200802144852. | $35,000 |
| Feb 14, 2008 | Expired or cancelled expired Dec 2014 | 1200 Irving St | interior remodel of (e) supermarket, including relocation & upgrade of (e) refrigeration, electrical, equipment, also includes entrance reconfiguration and (n) parking lot stripping for accesible parking.Details
interior remodel of (e) supermarket, including relocation & upgrade of (e) refrigeration, electrical, equipment, also includes entrance reconfiguration and (n) parking lot stripping for accesible parking. | $1,500,000 |
| Aug 24, 2007 | Completed final sign-off Nov 2007 | 450 Rhode Island St | revision to appl#200609273496 revision to various structural details which eliminates bolts in (e) & (n) concrete.Details
revision to appl#200609273496 revision to various structural details which eliminates bolts in (e) & (n) concrete. | |
| Jun 15, 2006 | Expired or cancelled expired Feb 2009 | 399 04th St | ground floor - demo public restrooms, certain coolor boxes and fixtures. install certain (n) fixtures & coolor boxes. construct (n) restrooms and food preparation areas.Details
ground floor - demo public restrooms, certain coolor boxes and fixtures. install certain (n) fixtures & coolor boxes. construct (n) restrooms and food preparation areas. | $790,000 |
| Apr 21, 2006 | Never finaled issued Jul 2006, no final | 1765 California St | remove and replace extg seafood coolers.Details
remove and replace extg seafood coolers. | $20,000 |
| Feb 23, 2006 | Completed final sign-off Mar 2006 | 1765 California St | to renew pa#2005/04/27/0965, 2005/08/01/9116, 2005/06/06/4221 for final inspectionDetails
to renew pa#2005/04/27/0965, 2005/08/01/9116, 2005/06/06/4221 for final inspection | |
| Jan 18, 2006 | Completed final sign-off Mar 2006 | 1765 California St | to renew for final only. pa# 2004/09/09/3713 & pa# 2005/07/26/8632.Details
to renew for final only. pa# 2004/09/09/3713 & pa# 2005/07/26/8632. | |
| Dec 14, 2005 | Completed final sign-off Sep 2006 | 635 Portola Dr | rev. to pa#2005/08/17/0538 - g/f: add new air door at main entrance, office 2nd flr: modify new pre-pack room (replace (e) cooler box with new 10 door reach-in case), add new dishwasher with vapor hood.Details
rev. to pa#2005/08/17/0538 - g/f: add new air door at main entrance, office 2nd flr: modify new pre-pack room (replace (e) cooler box with new 10 door reach-in case), add new dishwasher with vapor hood. | $30,000 |
| Aug 17, 2005 | Completed final sign-off Sep 2006 | 635 Portola Dr | revision 200405204365.gr fl:entire sales area layout revised,add dumb waiter,upgraded,revised,eliminDetails
revision 200405204365.gr fl:entire sales area layout revised,add dumb waiter,upgraded,revised,elimin | |
| Jul 26, 2005 | Expired or cancelled expired Mar 2006 | 1765 California St | revision to pa 200303311089, conver seating area to bread display area, replace (e) cheese cases.(e)Details
revision to pa 200303311089, conver seating area to bread display area, replace (e) cheese cases.(e) | $5,000 |
| Sep 9, 2004 | Expired or cancelled expired Mar 2006 | 1765 California St | to renew permit app 200303311089Details
to renew permit app 200303311089 | $120,000 |
| May 20, 2004 | Completed final sign-off Sep 2006 | 635 Portola Dr | provide new accessible elevator, restrooms, 2nd means of egress frm sales area & 2nd flr. add new ofDetails
provide new accessible elevator, restrooms, 2nd means of egress frm sales area & 2nd flr. add new of | $365,585 |
| May 20, 2003 | Never finaled issued Jul 2003, no final | 1765 California St | modification extg office layout in extg mezzanine/new walls/wndw/doors/readjust lighting & hvacDetails
modification extg office layout in extg mezzanine/new walls/wndw/doors/readjust lighting & hvac | $38,000 |
| Mar 31, 2003 | Expired or cancelled expired Mar 2006 | 1765 California St | interior remodeling, replace display fixtures, new lighting at deli/bakery, prep. area.Details
interior remodeling, replace display fixtures, new lighting at deli/bakery, prep. area. | $225,000 |
| Jan 7, 2003 | Completed final sign-off Jun 2003 | 1765 California St | new peets coffee and tea installation at (e) whole foods marketDetails
new peets coffee and tea installation at (e) whole foods market | $50,000 |
| Aug 28, 2002 | Expired or cancelled expired Jan 2004 | 1765 California St | extend exist mezzanine space to 450 s.f. . add new stair for the send means of egress from mezzanineDetails
extend exist mezzanine space to 450 s.f. . add new stair for the send means of egress from mezzanine | $100,000 |
| Apr 23, 2002 | Completed final sign-off May 2003 | 1765 California St | install new accessible restrooms. mechanical to be separate permit.Details
install new accessible restrooms. mechanical to be separate permit. | $75,000 |